{"id":5467,"date":"2026-09-20T09:39:38","date_gmt":"2026-09-20T01:39:38","guid":{"rendered":"https:\/\/www.solidess.com\/?p=5467"},"modified":"2026-11-09T16:24:49","modified_gmt":"2026-11-09T08:24:49","slug":"%d9%86%d8%b8%d8%a7%d9%85-%d8%aa%d8%ae%d8%b2%d9%8a%d9%86-%d8%a7%d9%84%d8%b7%d8%a7%d9%82%d8%a9-%d8%a8%d8%a7%d9%84%d8%a8%d8%b7%d8%a7%d8%b1%d9%8a%d8%a7%d8%aa-%d9%81%d9%8a-%d9%85%d8%a7%d9%84%d9%8a%d8%b2","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/ar\/battery-energy-storage-system-malaysia-261kwh-bess\/","title":{"rendered":"\u0646\u0638\u0627\u0645 \u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0628\u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0627\u062a \u0641\u064a \u0645\u0627\u0644\u064a\u0632\u064a\u0627: \u0633\u0639\u0629 261 \u0643\u064a\u0644\u0648\u0648\u0627\u0637\/\u0633\u0627\u0639\u0629 \u0644\u062a\u063a\u0637\u064a\u0629 \u0630\u0631\u0648\u0629 \u0627\u0633\u062a\u0647\u0644\u0627\u0643 TNB \u0627\u0644\u0628\u0627\u0644\u063a\u0629 90 \u0643\u064a\u0644\u0648\u0648\u0627\u0637"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"5467\" class=\"elementor elementor-5467\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-697efd8b auto-image elementor-widget elementor-widget-image\" data-id=\"697efd8b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5464\" alt=\"MegSolid Malaysia BESS for a 90 kW TNB maximum-demand peak, comparing ESSA0100B-0215, Energon 261 and ESSC0500B-1075 by energy, footprint and TNB tariff timing\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover.jpg 1254w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-300x300.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-1024x1024.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-150x150.jpg 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-768x768.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-12x12.jpg 12w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-600x600.jpg 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-100x100.jpg 100w\" sizes=\"(max-width: 1254px) 100vw, 1254px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-acca220f auto-p elementor-widget elementor-widget-heading\" data-id=\"acca220f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For a TNB-supplied factory in Peninsular Malaysia, start with the required reduction at the billing meter. This guide uses a hypothetical 390 kW load, a 300 kW import target and a two-hour event: the battery must deliver 90 kW and 180 kWh AC. <a href=\"https:\/\/www.solidess.com\/product\/megsolid-solid-liquid-energy-storage\/\" target=\"_blank\" style=\"color:#61ce70\">MegSolid Energon 261<\/a> is a 125 kVA \/ 261.24 kWh candidate to compare with the <a href=\"https:\/\/www.solidess.com\/how-to-choose-commercial-battery-storage-215kwh-vs-261kwh-bess\/\" target=\"_blank\" style=\"color:#61ce70\">215.04 kWh unit<\/a>. The numbers below are a screening example, not a Malaysian MegSolid installation or a runtime guarantee. Use the <a href=\"https:\/\/www.solidess.com\/battery-energy-storage-system-design-ci-sites\/\" target=\"_blank\" style=\"color:#61ce70\">C&amp;I BESS design process<\/a> to verify PCS kW\/kvar, usable AC energy and recharge before ordering.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-52607dcf auto-h2 elementor-widget elementor-widget-heading\" data-id=\"52607dcf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Screen Energon 261 for an 80\u2013100 kW Two-Hour Demand Reduction<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98631bd7 auto-p elementor-widget elementor-widget-heading\" data-id=\"98631bd7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Delivering 90 kW for two hours requires 180 kWh AC. The screening assumptions below add an independent delivery allowance and a scheduled SOC window. Under those assumptions, one 215.04 kWh cabinet falls short, while 261.24 kWh clears the nominal-energy screen. Actual acceptance still depends on guaranteed usable AC energy at the required power and warranty age.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb224f8e auto-p elementor-widget elementor-widget-heading\" data-id=\"cb224f8e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The <a href=\"https:\/\/www.solidess.com\/product\/megsolid-solid-liquid-energy-storage\/\" target=\"_blank\" style=\"color:#61ce70\">Energon 261.24 kWh product page<\/a> lists 125 kVA, an IP54 cabinet, 400\/480 V AC options and liquid cooling. Its published operating range is \u221220 to 55\u00b0C, with derating above 45\u00b0C. Confirm continuous kW, the simultaneous kvar obligation, temperature\/DC-voltage limits and net usable AC energy for the exact offered build. The nameplate makes it a candidate; it does not establish the two-hour guarantee. If the Malaysian shortlist includes a <strong><a href=\"https:\/\/www.solidess.com\/sungrow-powerstack-alternatives-257-261kwh-ci-battery-storage\/\" target=\"_blank\" style=\"color:#61CE70\">Sungrow PowerStack 255CS (ST255CS-2H) alternative<\/a><\/strong>, apply the same 90 kW \/ 180 kWh duty and confirm each cabinet\u2019s active-power and usable-energy limits.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cbddb2d6 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"cbddb2d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>MegSolid option<\/th><th>Published rating<\/th><th>Result for a 90 kW, two-hour peak<\/th><\/tr><\/thead><tbody><tr><td>ESSA0100B-0215<\/td><td>100 kW \/ 215.04 kWh<\/td><td>100 kW is a published rating; the common illustrative energy factors give 170.3 kWh AC, below the 180 kWh target<\/td><\/tr><tr><td>Energon 261<\/td><td>125 kVA \/ 261.24 kWh<\/td><td>Nominal energy clears the stated illustrative screen; available kW\/kvar and warranted AC energy remain approval gates<\/td><\/tr><tr><td>2 \u00d7 ESSA0100B-0215<\/td><td>200 kW \/ 430.08 kWh<\/td><td>430.08 kWh nominal; compare the additional capacity, two branches and released parallel-control scope against the actual duty<\/td><\/tr><tr><td>ESSC0500B-1075<\/td><td>500 kW \/ 1.0752 MWh<\/td><td>Consider only when measured power\/energy and the site electrical\/civil scope justify the larger block<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65ba27ca auto-h3 elementor-widget elementor-widget-heading\" data-id=\"65ba27ca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Compare the Installed Cabinet Footprints<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc6648de auto-p elementor-widget elementor-widget-heading\" data-id=\"cc6648de\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon measures 1,300 \u00d7 1,350 \u00d7 2,200 mm, giving a 1.76 m\u00b2 equipment footprint before service clearances. One ESSA0100B-0215 occupies about 3.80 m\u00b2 from its 2,450 \u00d7 1,550 mm base, while two occupy about 7.60 m\u00b2.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6a31f169 auto-p elementor-widget elementor-widget-heading\" data-id=\"6a31f169\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">On cabinet dimensions alone, 1.755 m\u00b2 is approximately 76.9% less than the combined 7.595 m\u00b2 base area of two ESSA cabinets. This is a geometric comparison, not a 76.9% saving in installed site area or cost. Service access, fire separation, cooling-air paths and the approved parallel arrangement determine the actual layout.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17a804db auto-p elementor-widget elementor-widget-heading\" data-id=\"17a804db\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Shorter peaks, lower power factor or an energy requirement beyond one cabinet can change the product selection. TNB billing windows and site interval data establish those boundaries.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc73af8f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"cc73af8f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Check Whether TNB Bills the Peak the Battery Will Remove<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a80246e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"a80246e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Confirm the tariff name, supply-voltage category, billing period and demand-related line items on the actual TNB invoice. A low-voltage customer\u2019s charges must not be treated as an MV\/HV maximum-demand charge merely because its plant has a high instantaneous load. Use the current approved tariff and account terms; older industrial tariff labels and historical booklets can describe a different structure.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3f202cda auto-p elementor-widget elementor-widget-heading\" data-id=\"3f202cda\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For eligible TNB ToU accounts, the published weekday peak window is 14:00\u201322:00; other weekday hours, weekends and TNB\u2019s specified public holidays are off-peak. TNB explains that maximum-demand charges do not apply during off-peak periods for peak\/off-peak tariff customers. Verify the site\u2019s actual MV\/HV demand-charge basis before assigning a saving to a recorded event.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a6c90add auto-table elementor-widget elementor-widget-text-editor\" data-id=\"a6c90add\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Site tariff position<\/th><th>Peak that matters to the purchase<\/th><th>BESS operating result<\/th><\/tr><\/thead><tbody><tr><td>Eligible MV\/HV general tariff<\/td><td>Highest demand that reaches the billed maximum-demand line<\/td><td>Discharge against the recurring billed interval<\/td><\/tr><tr><td>Eligible MV\/HV ToU account<\/td><td>Chargeable 14:00\u201322:00 weekday event, excluding TNB-specified off-peak holidays<\/td><td>Schedule sufficient usable energy before the event and verify the entire chargeable interval<\/td><\/tr><tr><td>Peak occurs only during ToU off-peak hours<\/td><td>Check the actual account terms; an off-peak event does not create the same ToU demand saving<\/td><td>Avoid buying battery capacity for a saving the tariff does not create<\/td><\/tr><tr><td>Peak moves between production shifts<\/td><td>Different event may set the next bill<\/td><td>Control every qualifying event across the billing period<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3c1635a auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d3c1635a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Use Repeated 30-Minute Demand Blocks to Define the Duty<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fca49b9c auto-image elementor-widget elementor-widget-image\" data-id=\"fca49b9c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5465\" alt=\"Malaysia TNB peak comparison showing 90 kW for 90 minutes against two hours, with ESSA0100B-0215 for shorter duty and Energon 261 for longer discharge requirements\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-865b3482 auto-p elementor-widget elementor-widget-heading\" data-id=\"865b3482\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Review twelve billing months where available, with a data-gap plan if records are shorter. Export local timestamps, interval duration, import kWh or average kW, measured kvar\/power factor, production shift, PV output and outage flags. TNB defines monthly MD from the largest energy supplied in a consecutive 30-minute period. Reconcile the controller\u2019s clock and interval convention with the revenue meter rather than assuming any four logged half-hours exactly match the billing calculation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb2a57af auto-table elementor-widget elementor-widget-text-editor\" data-id=\"cb2a57af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Recorded event above a 300 kW target<\/th><th>Required BESS power<\/th><th>AC energy to remove the event<\/th><th>Initial MegSolid direction<\/th><\/tr><\/thead><tbody><tr><td>One interval at 390 kW<\/td><td>90 kW<\/td><td>45 kWh<\/td><td>ESSA energy range<\/td><\/tr><tr><td>Four intervals at 390 kW<\/td><td>90 kW<\/td><td>180 kWh<\/td><td>Energon 261 energy range<\/td><\/tr><tr><td>Eight intervals at 340 kW<\/td><td>40 kW<\/td><td>160 kWh<\/td><td>Lower PCS power with a longer energy window<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9041b4df auto-p elementor-widget elementor-widget-heading\" data-id=\"9041b4df\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The highest interval sets the monthly maximum. The intervals around it establish how many kWh the battery needs. Repeated events also establish how often the cabinet must cycle and how much time remains for recharge. The <strong><a href=\"https:\/\/www.solidess.com\/battery-peak-shaving-control-pcc\/\" target=\"_blank\" style=\"color:#61ce70\">PCC peak-shaving controller<\/a><\/strong> must prevent charging from creating a new billed maximum after the original peak has been reduced.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ddc70537 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ddc70537\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Set the PCS Requirement from kW and Power Factor<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c6bd8ff auto-p elementor-widget elementor-widget-heading\" data-id=\"0c6bd8ff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The billing target establishes a 90 kW active-power reduction. Size the PCS from the active and reactive power it is assigned to exchange at its own terminals. The factory\u2019s load power factor does not automatically become the PCS output power factor: the grid, capacitors or other equipment may supply part of the kvar duty. Agree the control mode and P\u2013Q allocation before calculating kVA.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9edd38bb auto-p elementor-widget elementor-widget-heading\" data-id=\"9edd38bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Required active-power reduction = 390 \u2212 300 = 90 kW<br>PCS apparent power = \u221a(P\u00b2 + Q\u00b2)<br>At Q = 0: S = 90 kVA<br>If PCS displacement PF is specified as 0.90: S = 90 \u00f7 0.90 = 100 kVA, with |Q| \u2248 43.6 kvar<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-25add748 auto-p elementor-widget elementor-widget-heading\" data-id=\"25add748\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The following table is a sensitivity check for the PCS\u2019s assigned displacement power factor at 90 kW. It is not a conversion from the factory\u2019s measured power factor. The arithmetic difference from 125 kVA is not spare kvar capability or proof of continuous kW output; apply the exact model\u2019s P\u2013Q, current, temperature and DC-voltage limits.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a580f099 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"a580f099\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Assigned PCS displacement PF<\/th><th>PCS kVA at 90 kW<\/th><th>Arithmetic difference from 125 kVA<\/th><\/tr><\/thead><tbody><tr><td>0.95<\/td><td>94.7 kVA<\/td><td>30.3 kVA<\/td><\/tr><tr><td>0.90<\/td><td>100.0 kVA<\/td><td>25.0 kVA<\/td><\/tr><tr><td>0.80<\/td><td>112.5 kVA<\/td><td>12.5 kVA<\/td><\/tr><tr><td>0.75<\/td><td>120.0 kVA<\/td><td>5.0 kVA<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-282c4aa0 auto-p elementor-widget elementor-widget-heading\" data-id=\"282c4aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For an ideal 125 kVA circle at 90 kW, \u221a(125\u00b2 \u2212 90\u00b2) is approximately 86.7 kvar. This is a geometric upper screen, not a model guarantee; the released P\u2013Q curve can impose tighter limits. Verify simultaneous P and Q, current and harmonic performance through <strong><a href=\"https:\/\/www.solidess.com\/bess-power-quality-testing-for-commercial-acceptance\/\" target=\"_blank\" style=\"color:#61ce70\">commercial BESS power-quality testing<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-db885aad auto-p elementor-widget elementor-widget-heading\" data-id=\"db885aad\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">CT direction can invalidate the dispatch calculation. Reversed CT polarity or a misplaced PCC measurement can command charging during a peak or discharging after the event has passed.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3df3262 auto-p elementor-widget elementor-widget-heading\" data-id=\"c3df3262\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The <strong><a href=\"https:\/\/www.solidess.com\/bess-ct-polarity-metering-commissioning\/\" target=\"_blank\" style=\"color:#61ce70\">CT polarity commissioning test<\/a><\/strong> verifies that the controller sees import and export in the same direction as the revenue meter.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7f1e7ca0 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7f1e7ca0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Size Battery Energy from Peak Duration and Protected SOC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9b6619ba auto-p elementor-widget elementor-widget-heading\" data-id=\"9b6619ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Power determines how far the demand falls; duration determines whether the cabinet can hold the target until the event ends. Four consecutive 30-minute intervals at a 90 kW reduction require 180 kWh at the AC connection:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fbde21cd auto-p elementor-widget elementor-widget-heading\" data-id=\"fbde21cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>AC energy required = 90 kW \u00d7 2 hours = 180 kWh<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4c8bbc63 auto-p elementor-widget elementor-widget-heading\" data-id=\"4c8bbc63\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Use 88% as an independent illustrative one-way AC-delivery factor and 90% as an illustrative scheduled SOC window. Neither is a warranted value for these cabinets. The product page\u2019s \u201cmaximum system efficiency: 90%\u201d does not define a measured round-trip efficiency or establish the 88% factor. The screen below also assumes beginning-of-life nominal capacity; auxiliaries must be assigned to the delivery boundary once.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a4700252 auto-p elementor-widget elementor-widget-heading\" data-id=\"a4700252\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Required nominal energy = 180 kWh \u00f7 0.88 \u00f7 0.90<br>                        = 227.3 kWh<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e9b41ed4 auto-p elementor-widget elementor-widget-heading\" data-id=\"e9b41ed4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The unrounded requirement is 227.27 kWh: 12.2 kWh above 215.04 kWh and 34.0 kWh below 261.24 kWh. The next table applies the same hypothetical factors solely to show their effect on nominal energy; it is not a measured comparison or a product acceptance certificate.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-066afdd8 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"066afdd8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Product<\/th><th>Nominal energy<\/th><th>Illustrative AC energy: nominal \u00d7 0.90 \u00d7 0.88<\/th><th>Illustrative duration at 90 kW, before uncounted auxiliaries\/age effects<\/th><\/tr><\/thead><tbody><tr><td>ESSA0100B-0215<\/td><td>215.04 kWh<\/td><td>170.3 kWh AC<\/td><td>1.89 hours<\/td><\/tr><tr><td>Energon 261<\/td><td>261.24 kWh<\/td><td>206.9 kWh AC<\/td><td>2.30 hours<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-af8ca193 auto-p elementor-widget elementor-widget-heading\" data-id=\"af8ca193\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">In this beginning-of-life illustration, Energon\u2019s calculated AC allowance is 206.9 \u2212 180 = 26.9 kWh. Any additional auxiliary demand or capacity loss reduces it. At an independently assumed 80% retained capacity, the same other factors give only 165.5 kWh AC, below the two-hour target. Specify the required usable AC energy and warranty-age condition rather than purchasing against the initial 26.9 kWh allowance.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-93bd9c54 auto-p elementor-widget elementor-widget-heading\" data-id=\"93bd9c54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Long-term sizing still needs the project degradation model and guaranteed-energy schedule. The <strong><a href=\"https:\/\/www.solidess.com\/commercial-bess-capacity-test-verify-usable-kwh\/\" target=\"_blank\" style=\"color:#61ce70\">commercial BESS capacity test<\/a><\/strong> verifies delivered AC energy at the agreed power, SOC limits and ambient condition.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cddcdde0 auto-p elementor-widget elementor-widget-heading\" data-id=\"cddcdde0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A 90-minute event at 90 kW needs 135 kWh AC, or 170.5 kWh nominal under these same hypothetical factors. That clears the 215.04 kWh nominal-energy screen, but continuous kW\/kvar, temperature, auxiliaries and warranty age still require approval. A longer measured event can change the shortlist without proving either product is always the cheaper purchase.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-855e18a8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"855e18a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Match the Demand Block to ESSA, Energon or ESSC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5101a42c auto-p elementor-widget elementor-widget-heading\" data-id=\"5101a42c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Compare ESSA, Energon and ESSC against the same meter-level duty and acceptance boundary. The current catalogue ratings place them in different power\/energy classes; they do not rank the installed cost or guarantee the same usable fraction. Shortlist a class first, then require the selected model to meet the specified kW\/kvar and net AC-energy obligation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e0adfd9c auto-table elementor-widget elementor-widget-text-editor\" data-id=\"e0adfd9c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Measured duty<\/th><th>Preliminary MegSolid candidate<\/th><th>Published product advantage<\/th><th>Release condition<\/th><\/tr><\/thead><tbody><tr><td>Up to 100 kW with calculated nameplate energy at or below 215.04 kWh<\/td><td><strong><a style=\"color: #61ce70;\" href=\"https:\/\/www.solidess.com\/product\/outdoor-cabinet-energy-storage-system\/\" target=\"_blank\" rel=\"noopener\">ESSA0100B-0215<\/a><\/strong><\/td><td>100 kW, 215.04 kWh, 400 V, built-in isolation transformer, on-grid THDi &lt;3%<\/td><td>Confirm net usable AC energy and simultaneous kW\/kvar at temperature and warranty age<\/td><\/tr><tr><td>Approximately 80\u2013100 kW for close to two hours<\/td><td><strong><a style=\"color: #61ce70;\" href=\"https:\/\/www.solidess.com\/product\/megsolid-solid-liquid-energy-storage\/\" target=\"_blank\" rel=\"noopener\">Energon 261<\/a><\/strong><\/td><td>125 kVA, 261.24 kWh, 400\/480 V, liquid cooling, up to 10 units in parallel<\/td><td>Require the exact build to meet 90 kW \/ 180 kWh AC; parallel expansion needs an approved design<\/td><\/tr><tr><td>Several hundred kilowatts with an energy requirement approaching 1 MWh<\/td><td><strong><a style=\"color: #61ce70;\" href=\"https:\/\/www.solidess.com\/product\/containerized-energy-storage-system\/\" target=\"_blank\" rel=\"noopener\">ESSC0500B-1075<\/a><\/strong><\/td><td>500 kW, 1.0752 MWh, IP54, 6,058 \u00d7 2,438 \u00d7 2,896 mm<\/td><td>Compare transformer, protection, usable AC energy, civil works and delivery scope<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be4157e7 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"be4157e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">When the Container-Class Screen Applies<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ad4a59c8 auto-p elementor-widget elementor-widget-heading\" data-id=\"ad4a59c8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A separate hypothetical 350 kW reduction for two hours needs 700 kWh AC. Applying the same 88% delivery factor and 90% scheduled SOC window gives 883.8 kWh nominal, below the ESSC0500B-1075\u2019s published 1,075.2 kWh. This is an initial energy screen only; verify available kW\/kvar, thermal limits, auxiliaries and warranted AC energy before releasing a container configuration.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2966e3aa auto-p elementor-widget elementor-widget-heading\" data-id=\"2966e3aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Its 21,000 kg weight and container dimensions then become transformer, switchboard, foundation and delivery-route decisions.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d89731c auto-p elementor-widget elementor-widget-heading\" data-id=\"4d89731c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For the 90 kW \/ 180 kWh example, Energon merits a single-cabinet review before a 500 kW container. ESSC\u2019s 1,075.2 kWh is approximately 814.0 kWh more nominal energy than Energon, but 500 kW cannot be compared directly with a 125 kVA rating to calculate unused active power. Price the complete accepted duty and site works before deciding which architecture offers better value.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0de618f3 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"0de618f3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Review My 90 kW TNB Peak<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac8bb080 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ac8bb080\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Keep Energon Ready for the Chargeable TNB Window<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-07d033f4 auto-p elementor-widget elementor-widget-heading\" data-id=\"07d033f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The two-hour event can be controlled only if the required energy remains available when the chargeable window begins. Under the current TNB ToU schedule, a medium- or high-voltage factory can prepare the battery before 14:00, protect the required SOC through the weekday peak window and recharge after 22:00. Weekend operation can use the all-day off-peak period when production permits.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cae9344d auto-p elementor-widget elementor-widget-heading\" data-id=\"cae9344d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Control priority for the 90 kW site should follow this order:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7c786422 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"7c786422\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewBox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Charge to the scheduled SOC target without lifting facility import above its control ceiling.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewBox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Preserve 180 kWh AC for the four consecutive 30-minute demand intervals.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewBox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Discharge as PCC import approaches 300 kW, then modulate output to hold that target.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewBox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Retain the remaining calculated margin for a late or extended event.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewBox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Recharge after the chargeable window at a power level that stays below the next demand threshold.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-07cb360e auto-p elementor-widget elementor-widget-heading\" data-id=\"07cb360e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">At 90 kW, the hypothetical 26.9 kWh beginning-of-life AC allowance equals about 18 minutes. It must not be promised as additional runtime: temperature, capacity age, auxiliaries and earlier dispatch can reduce available energy. Protect the specified obligation for every qualifying event and confirm recovery before the next one.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d55ec60b auto-p elementor-widget elementor-widget-heading\" data-id=\"d55ec60b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The <strong><a href=\"https:\/\/www.solidess.com\/bess-ems-priority-logic\/\" target=\"_blank\" style=\"color:#61ce70\">BESS EMS priority logic<\/a><\/strong> must place tariff protection above optional solar shifting whenever both functions compete for the same SOC.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5ad65e28 auto-p elementor-widget elementor-widget-heading\" data-id=\"5ad65e28\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Daily maximum-demand dispatch puts cooling and available power into the supply specification. Energon lists liquid cooling and AI-based monitoring, but the offered temperature map and derating curve must support the agreed 90 kW  event. Do not let a hot intake-air condition turn a screened two-hour purchase into a shortfall; price the 90 kW \/180 kWh  AC acceptance obligation with the cabinet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a72fe4c3 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a72fe4c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Value the 90 kW Reduction from the Actual TNB Bill<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3d10be7 auto-p elementor-widget elementor-widget-heading\" data-id=\"d3d10be7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Calculate gross demand-related savings from the actual invoice components whose billed kW falls. Use each applicable RM\/kW rate and billing rule. Model the energy-cost difference between charging imports and the electricity displaced at discharge separately from demand-charge savings. Deduct maintenance, financing and auxiliaries not already included; count conversion losses once within the chosen AC-meter boundary.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-535850d3 auto-p elementor-widget elementor-widget-heading\" data-id=\"535850d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Gross monthly demand saving = \u03a3 [verified reduction in billed kW for an eligible charge component \u00d7 that component\u2019s current RM\/kW rate]<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-930dbe57 auto-p elementor-widget elementor-widget-heading\" data-id=\"930dbe57\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Claiming a 90 kW bill reduction requires the recorded maximum to fall by the full 90 kW. Missing an event late in the month can replace the controlled peak and erase much of that month\u2019s demand saving, making Energon\u2019s two-hour coverage and protected SOC commercially important.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98d6fb94 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"98d6fb94\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Keep the Published Market Case Separate<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb0db10e auto-p elementor-widget elementor-widget-heading\" data-id=\"bb0db10e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><a href=\"https:\/\/www.livoltek.com\/livoltek-maximum-demand-management-in-malaysia-for-ci-energy-storage\/\" target=\"_blank\" rel=\"noopener\">Livoltek\u2019s own Malaysian case report<\/a> describes its BES-P125X261 rated 125 kW \/ 261 kWh. It reports up to 89.99 kW maximum-demand reduction over two months, monthly savings approaching RM9,000 and annual savings <em>potential<\/em> above RM95,000. The annual figure is a projection, not a published twelve-month measured result. These vendor-reported figures do not establish MegSolid performance or this hypothetical factory\u2019s savings.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-217f39e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"217f39e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Those figures describe Livoltek\u2019s published project. The 90 kW MegSolid example is screened separately against Energon\u2019s 125 kVA and 261.24 kWh ratings.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2ac177e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"2ac177e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Net value still needs to account for charging energy, conversion losses, auxiliary consumption, maintenance and the cost of retained SOC. Full lifecycle treatment belongs in the existing cost analysis; this page keeps the decision on whether one Energon cabinet can physically remove the chargeable demand block.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5490705f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"5490705f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Prove the Demand Reduction During FAT and SAT<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d77f1553 auto-image elementor-widget elementor-widget-image\" data-id=\"d77f1553\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5466\" alt=\"MegSolid engineering infographic showing a 390 kW site peak reduced to 300 kW, 90 kW discharge, 180 kWh AC demand, 227.3 kWh nominal energy screen and FAT SAT checks\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d7f50fc4 auto-p elementor-widget elementor-widget-heading\" data-id=\"d7f50fc4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Agree the acceptance duty before purchase: 90 kW active output, the assigned kvar duty and at least 180 kWh net AC delivery at a named meter, temperature, SOC window and capacity-age condition. FAT checks the shipped configuration; SAT checks the installed metering and control boundary. A successful test supports those recorded conditions, while monthly bill reduction also requires coverage of every charge-setting event.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b5b0f865 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"b5b0f865\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Acceptance check<\/th><th>Test condition<\/th><th>Purchase decision protected<\/th><\/tr><\/thead><tbody><tr><td>PCS apparent-power duty<\/td><td>Run at the agreed PCS active power and assigned kvar\/PF duty<\/td><td>Checks simultaneous kW\/kvar against the exact model\u2019s available P\u2013Q envelope<\/td><\/tr><tr><td>Delivered AC energy<\/td><td>Discharge at 90 kW across the agreed SOC window, temperature and capacity-age condition<\/td><td>Meter at least 180 kWh net of agreed auxiliaries\/losses at the named delivery point<\/td><\/tr><tr><td>PCC control<\/td><td>Raise site load above 300 kW and record BESS response<\/td><td>Record the target, transients, import\/export convention and agreed tolerance at the billing boundary<\/td><\/tr><tr><td>Interval alignment<\/td><td>Compare BESS logs, site meter and revenue-meter interval timestamps<\/td><td>Prevents a control success in the wrong interval<\/td><\/tr><tr><td>Recharge control<\/td><td>Recharge after the event under the import ceiling<\/td><td>Prevents the battery from creating the next billed peak<\/td><\/tr><tr><td>Thermal operation<\/td><td>Record battery temperature spread during the duty<\/td><td>Verifies the offered temperature limits, spread and derating against the agreed 90 kW duty<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bc0cd1bf auto-p elementor-widget elementor-widget-heading\" data-id=\"bc0cd1bf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">IEC 62619 addresses safety requirements and tests for industrial secondary lithium cells and batteries. IEC 62933-5-2 covers safety requirements for grid-integrated electrochemical energy storage systems, while IEC 62477-1 addresses power electronic converter system safety.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-27583e78 auto-p elementor-widget elementor-widget-heading\" data-id=\"27583e78\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">IEC test evidence does not replace Malaysian site approvals. The Energy Commission\u2019s <a href=\"https:\/\/www.st.gov.my\/sites\/default\/files\/2026-05\/Guidelines-on-Battery-Energy-Storage-System-%28BESS%29-Safety_0.pdf\" target=\"_blank\" rel=\"noopener\">BESS Safety Guidelines, GP\/ST\/No.62\/2026<\/a>, address design responsibility, registered contractors, technical evaluations, location and commissioning. Have the appointed competent person identify the applicable licence, utility connection and local fire\/location requirements for the actual application. Ask for a responsibility matrix and the offered model\u2019s reports before treating a cabinet as ready for installation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-89b7464a auto-p elementor-widget elementor-widget-heading\" data-id=\"89b7464a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The <strong><a href=\"https:\/\/www.solidess.com\/ci-bess-testing-fat-sat-performance-acceptance\/\" target=\"_blank\" style=\"color:#61ce70\">C&amp;I BESS FAT, SAT and performance acceptance process<\/a><\/strong> ties those checks to witnessed records. The <strong><a href=\"https:\/\/www.solidess.com\/bess-factory-acceptance-test-guide\/\" target=\"_blank\" style=\"color:#61ce70\">BESS factory acceptance test guide<\/a><\/strong> then connects PCS, BMS, EMS, thermal protection and communication evidence to the equipment released for shipment.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17086e95 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"17086e95\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Select the Final MegSolid Configuration from the Measured Event<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bbc133e8 auto-p elementor-widget elementor-widget-heading\" data-id=\"bbc133e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The hypothetical factory needs a 90 kW reduction and 180 kWh AC over two hours. If the PCS is also assigned 0.90 displacement PF, its calculated duty is 100 kVA; active-only dispatch would be 90 kVA before other constraints. The 227.3 kWh nominal-energy screen uses independent beginning-of-life assumptions. Energon\u2019s published 125 kVA \/ 261.24 kWh ratings justify a preliminary review, subject to a signed usable-energy and P\u2013Q obligation for the exact site conditions.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-46693e22 auto-p elementor-widget elementor-widget-heading\" data-id=\"46693e22\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A 90-minute event can bring ESSA0100B-0215 into the energy shortlist under the same hypothetical factors. A duty of several hundred kilowatts approaching 1 MWh can justify reviewing ESSC0500B-1075. Select the final architecture from guaranteed AC output, required lifetime, available recharge, installed scope and cost rather than one nominal-capacity comparison.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f10c94c8 auto-p elementor-widget elementor-widget-heading\" data-id=\"f10c94c8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The comparison identifies questions to close before release: can the offered cabinet deliver 90 kW and 180 kWh AC at the agreed P\u2013Q, temperature and warranty-age condition; can it recover before the next billed event; and what service\/fire clearances does the layout need? The 76.9% cabinet-base-area comparison, 18-minute initial-energy allowance and advertised parallel limit remain separate from installed-area, runtime and expansion guarantees.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-58846592 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"58846592\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Confirm the Energon 261 Configuration With a PCS, SOC and SAT Review<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e6ef50ad auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"e6ef50ad\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0b3c2bce elementor-widget elementor-widget-heading\" data-id=\"0b3c2bce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0864b4ed e-con-full e-flex e-con e-child\" data-id=\"0864b4ed\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d4d33acb elementor-widget elementor-widget-n-accordion\" data-id=\"d4d33acb\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accordion. Open links with Enter or Space, close with Escape, and navigate with Arrow Keys\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3570\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3570\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What is the best battery energy storage system for a 90 kW, two-hour peak in Malaysia? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3570\" class=\"elementor-element elementor-element-7d68e787 e-con-full e-flex e-con e-child\" data-id=\"7d68e787\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3570\" class=\"elementor-element elementor-element-e7ea7e9a e-con-full e-flex e-con e-child\" data-id=\"e7ea7e9a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-15023848 elementor-widget elementor-widget-heading\" data-id=\"15023848\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">One 261.24 kWh cabinet clears this article\u2019s hypothetical beginning-of-life energy screen, but no universal best-fit result follows. Require the exact offer to deliver 90 kW and 180 kWh net AC at the assigned kvar duty, temperature and warranty-age condition. A 125 kVA rating alone does not prove that obligation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3571\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3571\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How long can Energon 261 support a 90 kW reduction? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3571\" class=\"elementor-element elementor-element-d6237ce7 e-con-full e-flex e-con e-child\" data-id=\"d6237ce7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3571\" class=\"elementor-element elementor-element-4e2601f7 e-con-full e-flex e-con e-child\" data-id=\"4e2601f7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-75412b68 elementor-widget elementor-widget-heading\" data-id=\"75412b68\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Under the independent 90% scheduled SOC window and 88% one-way delivery assumptions, beginning-of-life nominal capacity gives 206.9 kWh AC, or 2.30 hours at 90 kW. This is an illustrative screen, not a guaranteed runtime. Auxiliaries, temperature, capacity age and the supplier\u2019s defined AC boundary can change it.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3572\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3572\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Is 125 kVA the same as 125 kW? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3572\" class=\"elementor-element elementor-element-8bcdafde e-con-full e-flex e-con e-child\" data-id=\"8bcdafde\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3572\" class=\"elementor-element elementor-element-b7e07189 e-con-full e-flex e-con e-child\" data-id=\"b7e07189\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8d390fa2 elementor-widget elementor-widget-heading\" data-id=\"8d390fa2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">No. kVA is apparent power and kW is active power. If the PCS itself is assigned 90 kW at 0.90 displacement PF, the calculation is 100 kVA and about 43.6 kvar. If its assigned Q is zero, the initial apparent-power screen is 90 kVA. The factory\u2019s load PF must not be automatically assigned to the PCS.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3573\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3573\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can one ESSA0100B-0215 handle the same peak? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3573\" class=\"elementor-element elementor-element-626411f2 e-con-full e-flex e-con e-child\" data-id=\"626411f2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3573\" class=\"elementor-element elementor-element-b15a6757 e-con-full e-flex e-con e-child\" data-id=\"b15a6757\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9c8558fa elementor-widget elementor-widget-heading\" data-id=\"9c8558fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Its published 100 kW rating is only the starting power check. Under the same independent energy factors, 215.04 kWh gives 170.3 kWh AC, or about 1.89 hours at 90 kW. Verify simultaneous kW\/kvar, temperature, auxiliaries and warranty-age energy before deciding whether one unit meets a shorter event.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3574\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3574\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> When should a Malaysian factory choose ESSC0500B-1075? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3574\" class=\"elementor-element elementor-element-6be3a54c e-con-full e-flex e-con e-child\" data-id=\"6be3a54c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3574\" class=\"elementor-element elementor-element-0701f586 e-con-full e-flex e-con e-child\" data-id=\"0701f586\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9218ae6b elementor-widget elementor-widget-heading\" data-id=\"9218ae6b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">ESSC0500B-1075 becomes relevant when the reduction reaches several hundred kilowatts and calculated energy approaches 1 MWh. The 500 kW, 1.0752 MWh, 21,000 kg container also requires suitable switchgear, transformer capacity, foundation and delivery access.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3575\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3575\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does TNB charge maximum demand during off-peak ToU hours? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3575\" class=\"elementor-element elementor-element-8ed8cb0b e-con-full e-flex e-con e-child\" data-id=\"8ed8cb0b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3575\" class=\"elementor-element elementor-element-77847c38 e-con-full e-flex e-con e-child\" data-id=\"77847c38\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eedb1a14 elementor-widget elementor-widget-heading\" data-id=\"eedb1a14\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">TNB states that off-peak MD charges do not apply to peak\/off-peak tariff customers; check the actual MV\/HV account terms. Its published ToU weekday peak window is 14:00\u201322:00, with other weekday hours, weekends and its specified public holidays off-peak. Other regions, utilities and tariffs need their own review.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3576\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3576\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How much interval data should be checked before buying a BESS? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3576\" class=\"elementor-element elementor-element-0cc75cc7 e-con-full e-flex e-con e-child\" data-id=\"0cc75cc7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3576\" class=\"elementor-element elementor-element-89a67828 e-con-full e-flex e-con e-child\" data-id=\"89a67828\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9de4c070 elementor-widget elementor-widget-heading\" data-id=\"9de4c070\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Twelve billing months are useful where available to expose seasonality, shutdowns and recurring peaks. Export interval timestamps\/duration, import kWh or average kW, kvar\/PF and production\/PV context; reconcile the billing-meter convention. If a full year is missing, record the gap and collect representative measurements instead of inventing an annual trace.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3577\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3577\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can BESS charging create a new maximum-demand charge? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3577\" class=\"elementor-element elementor-element-efc19285 e-con-full e-flex e-con e-child\" data-id=\"efc19285\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3577\" class=\"elementor-element elementor-element-cb1b0688 e-con-full e-flex e-con e-child\" data-id=\"cb1b0688\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1019ed0c elementor-widget elementor-widget-heading\" data-id=\"1019ed0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Yes. Recharge power added to the facility load can establish a new peak. PCC control should cap charging so total grid import remains below the selected threshold.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3578\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3578\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does maximum-demand management require rooftop solar? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3578\" class=\"elementor-element elementor-element-4ccc8fcd e-con-full e-flex e-con e-child\" data-id=\"4ccc8fcd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3578\" class=\"elementor-element elementor-element-f85cff59 e-con-full e-flex e-con e-child\" data-id=\"f85cff59\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4a8f3c81 elementor-widget elementor-widget-heading\" data-id=\"4a8f3c81\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">No. The battery can recharge from the grid during a suitable low-load or off-peak window and discharge against the chargeable event. Solar can reduce charging cost when surplus generation is available.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3579\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3579\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What does liquid cooling add to the Energon 261 purchase? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3579\" class=\"elementor-element elementor-element-eb06d5ac e-con-full e-flex e-con e-child\" data-id=\"eb06d5ac\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3579\" class=\"elementor-element elementor-element-28872481 e-con-full e-flex e-con e-child\" data-id=\"28872481\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-854c6734 elementor-widget elementor-widget-heading\" data-id=\"854c6734\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon\u2019s liquid cooling and AI-based monitoring are published features. Verify the temperature map, auxiliaries and available power for the repeated 90 kW  duty; the catalogue lists derating above 45\u00b0C. A\u00b15\u00b0C uniformity guarantee needs its own supplied-model test record.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35710\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35710\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can Energon 261 cabinets be expanded later? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35710\" class=\"elementor-element elementor-element-807ea498 e-con-full e-flex e-con e-child\" data-id=\"807ea498\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35710\" class=\"elementor-element elementor-element-7dec9fb3 e-con-full e-flex e-con e-child\" data-id=\"7dec9fb3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1141c1fc elementor-widget elementor-widget-heading\" data-id=\"1141c1fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Yes. MegSolid publishes parallel operation of up to 10 units. Transformer capacity, switchboard current, protection, controller architecture and available space still set the practical site limit.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35711\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35711\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How should the 180 kWh delivery target be verified? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35711\" class=\"elementor-element elementor-element-eebe55ab e-con-full e-flex e-con e-child\" data-id=\"eebe55ab\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35711\" class=\"elementor-element elementor-element-24886f89 e-con-full e-flex e-con e-child\" data-id=\"24886f89\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cd37ad0c elementor-widget elementor-widget-heading\" data-id=\"cd37ad0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The site acceptance test should discharge at 90 kW through the agreed SOC window and meter at least 180 kWh at the AC connection. Timestamps must align with the facility and revenue-meter intervals.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35712\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35712\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How are monthly savings calculated for a Malaysian factory? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewBox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35712\" class=\"elementor-element elementor-element-dfa8ad43 e-con-full e-flex e-con e-child\" data-id=\"dfa8ad43\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35712\" class=\"elementor-element elementor-element-7129d2fe e-con-full e-flex e-con e-child\" data-id=\"7129d2fe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fe08d8e1 elementor-widget elementor-widget-heading\" data-id=\"fe08d8e1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Sum the verified billed-kW reduction times each eligible demand-related RM\/kW rate. Model the energy-cost difference between charging imports and the electricity displaced at discharge separately from demand-charge savings. Deduct maintenance, financing and auxiliaries not already included; count conversion losses once within the chosen AC-meter boundary. A 90 kW dispatch at one event is not evidence of the month\u2019s billed-maximum reduction.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the best battery energy storage system for a 90 kW, two-hour peak in Malaysia?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"One 261.24 kWh cabinet clears this article\\u2019s hypothetical beginning-of-life energy screen, but no universal best-fit result follows. Require the exact offer to deliver 90 kW and 180 kWh net AC at the assigned kvar duty, temperature and warranty-age condition. A 125 kVA rating alone does not prove that obligation.\"}},{\"@type\":\"Question\",\"name\":\"How long can Energon 261 support a 90 kW reduction?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Under the independent 90% scheduled SOC window and 88% one-way delivery assumptions, beginning-of-life nominal capacity gives 206.9 kWh AC, or 2.30 hours at 90 kW. This is an illustrative screen, not a guaranteed runtime. Auxiliaries, temperature, capacity age and the supplier\\u2019s defined AC boundary can change it.\"}},{\"@type\":\"Question\",\"name\":\"Is 125 kVA the same as 125 kW?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. kVA is apparent power and kW is active power. If the PCS itself is assigned 90 kW at 0.90 displacement PF, the calculation is 100 kVA and about 43.6 kvar. If its assigned Q is zero, the initial apparent-power screen is 90 kVA. The factory\\u2019s load PF must not be automatically assigned to the PCS.\"}},{\"@type\":\"Question\",\"name\":\"Can one ESSA0100B-0215 handle the same peak?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Its published 100 kW rating is only the starting power check. Under the same independent energy factors, 215.04 kWh gives 170.3 kWh AC, or about 1.89 hours at 90 kW. Verify simultaneous kW\\\/kvar, temperature, auxiliaries and warranty-age energy before deciding whether one unit meets a shorter event.\"}},{\"@type\":\"Question\",\"name\":\"When should a Malaysian factory choose ESSC0500B-1075?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"ESSC0500B-1075 becomes relevant when the reduction reaches several hundred kilowatts and calculated energy approaches 1 MWh. The 500 kW, 1.0752 MWh, 21,000 kg container also requires suitable switchgear, transformer capacity, foundation and delivery access.\"}},{\"@type\":\"Question\",\"name\":\"Does TNB charge maximum demand during off-peak ToU hours?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"TNB states that off-peak MD charges do not apply to peak\\\/off-peak tariff customers; check the actual MV\\\/HV account terms. Its published ToU weekday peak window is 14:00\\u201322:00, with other weekday hours, weekends and its specified public holidays off-peak. Other regions, utilities and tariffs need their own review.\"}},{\"@type\":\"Question\",\"name\":\"How much interval data should be checked before buying a BESS?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Twelve billing months are useful where available to expose seasonality, shutdowns and recurring peaks. Export interval timestamps\\\/duration, import kWh or average kW, kvar\\\/PF and production\\\/PV context; reconcile the billing-meter convention. If a full year is missing, record the gap and collect representative measurements instead of inventing an annual trace.\"}},{\"@type\":\"Question\",\"name\":\"Can BESS charging create a new maximum-demand charge?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Recharge power added to the facility load can establish a new peak. PCC control should cap charging so total grid import remains below the selected threshold.\"}},{\"@type\":\"Question\",\"name\":\"Does maximum-demand management require rooftop solar?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. The battery can recharge from the grid during a suitable low-load or off-peak window and discharge against the chargeable event. Solar can reduce charging cost when surplus generation is available.\"}},{\"@type\":\"Question\",\"name\":\"What does liquid cooling add to the Energon 261 purchase?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Energon\\u2019s liquid cooling and AI-based monitoring are published features. Verify the temperature map, auxiliaries and available power for the repeated 90 kW  duty; the catalogue lists derating above 45\\u00b0C. A\\u00b15\\u00b0C uniformity guarantee needs its own supplied-model test record.\"}},{\"@type\":\"Question\",\"name\":\"Can Energon 261 cabinets be expanded later?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MegSolid publishes parallel operation of up to 10 units. Transformer capacity, switchboard current, protection, controller architecture and available space still set the practical site limit.\"}},{\"@type\":\"Question\",\"name\":\"How should the 180 kWh delivery target be verified?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The site acceptance test should discharge at 90 kW through the agreed SOC window and meter at least 180 kWh at the AC connection. Timestamps must align with the facility and revenue-meter intervals.\"}},{\"@type\":\"Question\",\"name\":\"How are monthly savings calculated for a Malaysian factory?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sum the verified billed-kW reduction times each eligible demand-related RM\\\/kW rate. Model the energy-cost difference between charging imports and the electricity displaced at discharge separately from demand-charge savings. Deduct maintenance, financing and auxiliaries not already included; count conversion losses once within the chosen AC-meter boundary. A 90 kW dispatch at one event is not evidence of the month\\u2019s billed-maximum reduction.\"}}]}<\/script>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u062a\u062a\u0637\u0644\u0628 \u0630\u0631\u0648\u0629 \u0627\u0633\u062a\u0647\u0644\u0627\u0643 TNB \u0627\u0644\u0628\u0627\u0644\u063a\u0629 90 \u0643\u064a\u0644\u0648\u0648\u0627\u0637 \u062e\u0637\u0629 \u0644\u0644\u0637\u0627\u0642\u0629 \u0648\u0627\u0644\u0645\u062f\u0629\u060c \u0648\u0644\u064a\u0633 \u0645\u062c\u0631\u062f \u0645\u0644\u0635\u0642 \u064a\u0634\u064a\u0631 \u0625\u0644\u0649 261 \u0643\u064a\u0644\u0648\u0648\u0627\u0637\/\u0633\u0627\u0639\u0629. \u0642\u0627\u0631\u0646 \u0628\u064a\u0646 \u062a\u0643\u0648\u064a\u0646\u0627\u062a MegSolid ESSA \u0648Energon 261 \u0648ESSC \u0644\u062a\u0644\u0628\u064a\u0629 \u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0646\u0638\u0627\u0645 \u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0628\u0627\u0644\u0628\u0637\u0627\u0631\u064a\u0627\u062a (BESS) \u0641\u064a \u0645\u0627\u0644\u064a\u0632\u064a\u0627\u060c \u062b\u0645 \u0623\u0631\u0633\u0644 \u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u0637\u0644\u0628 \u0639\u0644\u0649 \u0641\u062a\u0631\u0627\u062a \u0632\u0645\u0646\u064a\u0629 \u0648\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u062a\u0639\u0631\u0641\u0629 \u0644\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0623\u0633\u0639\u0627\u0631 \u064a\u0634\u0645\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c \u0648\u0639\u062f\u062f \u0627\u0644\u062e\u0632\u0627\u0646\u0627\u062a.<\/p>","protected":false},"author":4,"featured_media":5464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[1,714],"tags":[729],"class_list":["post-5467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-ci-battery-storage-solutions","tag-261-kwh-bess-battery-energy-storage-system-malaysia-commercial-bess-malaysia-energon-261-peak-shaving-malaysia-tnb-maximum-demand"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/posts\/5467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/comments?post=5467"}],"version-history":[{"count":13,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/posts\/5467\/revisions"}],"predecessor-version":[{"id":8126,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/posts\/5467\/revisions\/8126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/media\/5464"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/media?parent=5467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/categories?post=5467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/ar\/wp-json\/wp\/v2\/tags?post=5467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}