{"id":4467,"date":"2026-08-03T00:26:19","date_gmt":"2026-08-02T16:26:19","guid":{"rendered":"https:\/\/www.solidess.com\/?p=4467"},"modified":"2026-10-08T17:59:44","modified_gmt":"2026-10-08T09:59:44","slug":"comment-lire-le-debit-garanti-la-profondeur-de-decharge-dod-et-la-fin-de-vie-eol-dune-garantie-de-systeme-de-stockage-denergie-par-batterie-bess-commerciale-et-industrielle-ci","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/how-to-read-a-ci-bess-warranty-throughput-dod-and-eol\/","title":{"rendered":"Comment lire la garantie d\u2019un BESS commercial ou industriel : volume d\u2019\u00e9nergie comptabilis\u00e9, profondeur de d\u00e9charge (DOD) et fin de vie (EOL)"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4467\" class=\"elementor elementor-4467\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-95c3a1e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"95c3a1e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid recommande d\u2019examiner la <strong>garantie d\u2019un BESS commercial ou industriel<\/strong> comme une enveloppe de fonctionnement \u00e0 v\u00e9rifier par la mesure, au-del\u00e0 du nombre d\u2019ann\u00e9es ou de cycles annonc\u00e9. Une offre finan\u00e7able doit relier le volume d\u2019\u00e9nergie comptabilis\u00e9, la profondeur de d\u00e9charge, le r\u00e9gime de charge et de d\u00e9charge (C-rate), la temp\u00e9rature, les capacit\u00e9s en d\u00e9but et en fin de vie, le point de mesure, les historiques de l\u2019EMS, les proc\u00e9dures d\u2019essai et les mesures correctives. Si un de ces \u00e9l\u00e9ments manque, la garantie la moins co\u00fbteuse peut retransf\u00e9rer le risque de d\u00e9gradation \u00e0 l\u2019entreprise EPC ou au propri\u00e9taire de l\u2019actif.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5eb0a956 auto-image elementor-widget elementor-widget-image\" data-id=\"5eb0a956\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4464\" alt=\"Guide de garantie du syst\u00e8me de stockage d&#039;\u00e9nergie MegSolid C&amp;I BESS couvrant le d\u00e9bit, la profondeur de d\u00e9charge (DOD) et la capacit\u00e9 en fin de vie\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide.png 800w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide-300x300.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide-150x150.png 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide-768x768.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide-600x600.png 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/CI-BESS-Warranty-Throughput-DOD-and-EOL-Guide-100x100.png 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b4e33833 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"b4e33833\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc5 <strong>Dur\u00e9e de la garantie :<\/strong> Pr\u00e9cisez la date de d\u00e9but, la date de fin et le mat\u00e9riel couvert.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd04 <strong>Volume d\u2019\u00e9nergie comptabilis\u00e9 :<\/strong> D\u00e9finissez les plafonds d\u2019\u00e9nergie annuel et cumul\u00e9 et la m\u00e9thode de comptage.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc9 <strong>Maintien de la capacit\u00e9 :<\/strong> Veuillez joindre la courbe de d\u00e9gradation garantie et le seuil de fin de vie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>Enveloppe de fonctionnement :<\/strong> Fixez les limites de profondeur de d\u00e9charge (DOD), de r\u00e9gime de charge et de d\u00e9charge (C-rate), de temp\u00e9rature et d\u2019\u00e9tat de charge (SOC), ainsi que les exigences de maintenance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcca <strong>Justificatifs en cas de r\u00e9clamation :<\/strong> D\u00e9finissez les compteurs, les historiques de l\u2019EMS, les essais de capacit\u00e9 et le propri\u00e9taire des donn\u00e9es.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udee0\ufe0f <strong>Mesures correctives :<\/strong> Pr\u00e9cisez les obligations de r\u00e9paration, de remplacement, d\u2019ajout de capacit\u00e9 ou d\u2019indemnisation.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ed05b3c7 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"ed05b3c7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander un examen de la garantie du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) C&amp;I<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7caddfd3 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7caddfd3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">R\u00e9ponse directe : comparer les conditions de fonctionnement couvertes par la garantie, au-del\u00e0 du nombre d\u2019ann\u00e9es<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-caea17fe auto-p elementor-widget elementor-widget-heading\" data-id=\"caea17fe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une garantie de dix ans peut offrir une couverture moindre qu\u2019une garantie plus courte si le volume d\u2019\u00e9nergie comptabilis\u00e9, l\u2019\u00e9nergie restante ou les mesures correctives sont limit\u00e9s. Commencez par distinguer la couverture des d\u00e9fauts de celle des performances. Exigez ensuite de chaque soumissionnaire qu\u2019il remplisse le m\u00eame tableau des conditions de garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-23aee5c2 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"23aee5c2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Volet de la garantie<\/th><th>L'acheteur doit pr\u00e9ciser<\/th><th>Risque en cas d'omission<\/th><\/tr><\/thead><tbody><tr><td>Garantie du produit<\/td><td>\u00c9quipements couverts, d\u00e9fauts, date de prise d'effet et exclusions<\/td><td>La batterie, le PCS ou les \u00e9quipements auxiliaires peuvent \u00eatre exclus des mesures correctives.<\/td><\/tr><tr><td>Garantie de capacit\u00e9<\/td><td>Capacit\u00e9 de r\u00e9f\u00e9rence en d\u00e9but de vie (BOL), courbe annuelle de capacit\u00e9 restante, seuil minimal en fin de vie (EOL) et point de mesure<\/td><td>Le fournisseur et le propri\u00e9taire peuvent aboutir \u00e0 des valeurs diff\u00e9rentes de la capacit\u00e9 restante.<\/td><\/tr><tr><td>Garantie fond\u00e9e sur le volume d\u2019\u00e9nergie comptabilis\u00e9<\/td><td>\u00c9nergie annuelle et cumul\u00e9e, m\u00e9thode de comptage et r\u00e8gles de remise \u00e0 z\u00e9ro<\/td><td>Le pilotage normal du syst\u00e8me peut \u00e9puiser le volume d\u2019\u00e9nergie autoris\u00e9 avant terme.<\/td><\/tr><tr><td>Garantie de disponibilit\u00e9<\/td><td>Heures incluses, exclusions, maintenance programm\u00e9e et calcul<\/td><td>Un syst\u00e8me hors service peut n\u00e9anmoins appara\u00eetre comme disponible d'un point de vue contractuel<\/td><\/tr><tr><td>Mesures correctives en mati\u00e8re de performance<\/td><td>Conditions d\u00e9clenchant l\u2019essai, d\u00e9lai de mise en conformit\u00e9, r\u00e9paration, remplacement, ajout de capacit\u00e9 et paiement<\/td><td>Un \u00e9cart de performance av\u00e9r\u00e9 peut rester sans recours contractuel opposable.<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-50e4f89d auto-p elementor-widget elementor-widget-heading\" data-id=\"50e4f89d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/achat-de-stockage-denergie-commercial\/\" target=\"_blank\" style=\"color:#61CE70\">guide d\u2019achat de syst\u00e8mes de stockage d\u2019\u00e9nergie \u00e0 usage commercial<\/a><\/strong> dans le cadre d'une \u00e9valuation plus large des fournisseurs. Cet article concentre l'analyse sur les clauses de garantie, les preuves de fonctionnement et le risque de d\u00e9gradation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e90658d3 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"e90658d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Ne pas convertir le nombre de cycles en dur\u00e9e de garantie<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a3e20aa9 auto-p elementor-widget elementor-widget-heading\" data-id=\"a3e20aa9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La dur\u00e9e de vie en cycles est un r\u00e9sultat d\u2019essai ou une valeur indiqu\u00e9e sur la page du produit, pour des conditions sp\u00e9cifi\u00e9es en tout ou partie. Une garantie est un contrat qui fixe des conditions d\u2019\u00e9ligibilit\u00e9, des proc\u00e9dures de mesure et des mesures correctives. Ces deux notions sont li\u00e9es, mais elles ne sont pas interchangeables.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-97f22a5e auto-table elementor-widget elementor-widget-text-editor\" data-id=\"97f22a5e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>R\u00e9f\u00e9rence MegSolid<\/th><th>Dur\u00e9e de vie en cycles indiqu\u00e9e<\/th><th>Pr\u00e9cautions d\u2019interpr\u00e9tation avant l\u2019achat<\/th><\/tr><\/thead><tbody><tr><td>ESSA0030B-0055 \/ ESSA0050B-0055<\/td><td>\u2265 3 800 cycles<\/td><td>Ne tirez pas de conclusions quant \u00e0 la dur\u00e9e de la garantie ; les conditions d'essai compl\u00e8tes ne sont pas publi\u00e9es.<\/td><\/tr><tr><td>ESSA0050B-0100 \/ ESSA0100B-0215<\/td><td>\u2265 5 000 cycles<\/td><td>N\u2019en d\u00e9duisez ni l\u2019\u00e9nergie restante c\u00f4t\u00e9 courant alternatif ni le volume d\u2019\u00e9nergie comptabilis\u00e9 couvert par la garantie.<\/td><\/tr><tr><td>Batterie domestique MEG-Solid-512314FL1<\/td><td>8 000 cycles \u00e0 un DOD de 80%<\/td><td>Donn\u00e9es propres \u00e0 ce mod\u00e8le r\u00e9sidentiel. Ne les transposez pas \u00e0 une armoire ESSA commerciale ou industrielle.<\/td><\/tr><tr><td>Batterie mobile MG 512314<\/td><td>\u2265 6 000 cycles \u00e0 25 \u00b0C et \u00e0 80 % de capacit\u00e9 restante en fin de vie (EOL)<\/td><td>La page du produit mentionne \u00e9galement une dur\u00e9e de cinq ans ; demandez le document de garantie complet.<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cad09650 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"cad09650\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a0\ufe0f <strong>DOD manquant :<\/strong> Un nombre de cycles sans profondeur de d\u00e9charge ne permet pas de d\u00e9terminer l\u2019\u00e9nergie totale sur la dur\u00e9e de vie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a0\ufe0f <strong>EOL manquant :<\/strong> Sans seuil de capacit\u00e9 restante, le nombre de cycles ne permet pas de comparer les dur\u00e9es de vie sur une base commune.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a0\ufe0f <strong>Temp\u00e9rature manquante :<\/strong> Les r\u00e9gimes de fonctionnement en laboratoire et sur un site expos\u00e9 \u00e0 une forte chaleur ne sont pas \u00e9quivalents.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a0\ufe0f <strong>R\u00e9gime de charge et de d\u00e9charge (C-rate) non pr\u00e9cis\u00e9 :<\/strong> Un fonctionnement \u00e0 forte puissance peut s\u2019\u00e9carter des conditions de l\u2019essai de r\u00e9f\u00e9rence.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a0\ufe0f <strong>Recours manquant :<\/strong> M\u00eame une valeur d'essai valide n'indique pas ce que le fournisseur doit faire.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a2ac364a auto-p elementor-widget elementor-widget-heading\" data-id=\"a2ac364a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L' <strong><a href=\"https:\/\/www.solidess.com\/fr\/evaluer-un-systeme-de-stockage-denergie-a-batterie-a-semi-conducteurs\/\" target=\"_blank\" style=\"color:#61CE70\">guide d\u2019\u00e9valuation d\u2019un BESS \u00e0 l\u2019\u00e9tat solide au-del\u00e0 de la seule dur\u00e9e de vie en cycles<\/a><\/strong> pr\u00e9sente les v\u00e9rifications techniques pr\u00e9liminaires. Le pr\u00e9sent article reste centr\u00e9 sur l\u2019ex\u00e9cution des engagements contractuels de fourniture et les justificatifs.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4b10b7e6 auto-image elementor-widget elementor-widget-image\" data-id=\"4b10b7e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1120\" height=\"840\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4465\" alt=\"Matrice de d\u00e9cision comparant la dur\u00e9e de vie en cycles d&#039;une batterie au d\u00e9bit d&#039;\u00e9nergie sous garantie et \u00e0 la r\u00e9tention de capacit\u00e9 d&#039;un BESS C&amp;I\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix.jpg 1120w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/Cycle-Life-vs-Warranty-Throughput-Decision-Matrix-600x450.jpg 600w\" sizes=\"(max-width: 1120px) 100vw, 1120px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b79806c2 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"b79806c2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9duire du profil de pilotage le volume d\u2019\u00e9nergie comptabilis\u00e9 \u00e0 couvrir par la garantie<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a67d3903 auto-p elementor-widget elementor-widget-heading\" data-id=\"a67d3903\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour la garantie, au-del\u00e0 du nombre de cycles du BESS, il faut d\u00e9terminer la quantit\u00e9 d\u2019\u00e9nergie qui franchit le point de mesure d\u00e9fini par contrat pendant la p\u00e9riode de garantie. La demande de devis doit pr\u00e9ciser si le volume comptabilis\u00e9 repose sur l\u2019\u00e9nergie d\u00e9charg\u00e9e, l\u2019\u00e9nergie charg\u00e9e, leur total dans les deux sens ou un d\u00e9compte en cycles complets \u00e9quivalents.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-463bed0a elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"463bed0a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc1 <strong>Profil de charge :<\/strong> Fournir les m\u00eames donn\u00e9es par intervalles que celles utilis\u00e9es pour le dimensionnement du syst\u00e8me.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd52 <strong>Programme de pilotage :<\/strong> Indiquer le nombre de cycles attendus par jour et les variations saisonni\u00e8res.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a1 <strong>Sollicitation en puissance :<\/strong> Consignez les puissances de charge et de d\u00e9charge habituelles et maximales, en kW.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Base \u00e9nerg\u00e9tique :<\/strong> Utiliser l'\u00e9nergie utilisable contractuelle, et non une valeur nominale sans rapport.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccd <strong>Point de comptage :<\/strong> Choisir les bornes DC, la sortie AC de l'armoire ou le PCC et rester coh\u00e9rent.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc8 <strong>Cumul de revenus :<\/strong> Inclure l'\u00e9cr\u00eatage de pointe, l'arbitrage, les essais de secours et les services r\u00e9seau.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2cbe6ec5 auto-p elementor-widget elementor-widget-heading\" data-id=\"2cbe6ec5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">On peut estimer le nombre de cycles complets \u00e9quivalents en divisant l\u2019\u00e9nergie mesur\u00e9e en d\u00e9charge par l\u2019\u00e9nergie utilisable de r\u00e9f\u00e9rence convenue. Le contrat doit toutefois d\u00e9finir cette formule. Ne comptabilisez pas l\u2019\u00e9nergie de charge et celle de d\u00e9charge sans le pr\u00e9ciser si le plafond fix\u00e9 par le fournisseur ne couvre qu\u2019un sens. L\u2019EMS doit avertir les op\u00e9rateurs avant qu\u2019un programme de pilotage r\u00e9vis\u00e9 ne d\u00e9passe la limite annuelle convenue.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e410b4b4 auto-p elementor-widget elementor-widget-heading\" data-id=\"e410b4b4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le cyclage quotidien visant \u00e0 obtenir un <strong><a href=\"https:\/\/www.solidess.com\/fr\/maximiser-le-retour-sur-investissement-de-lecretage-des-pointes-pour-les-secteurs-commercial-et-industriel\/\" target=\"_blank\" style=\"color:#61CE70\">retour sur investissement gr\u00e2ce \u00e0 l\u2019\u00e9cr\u00eatement des pointes pour le secteur commercial et industriel<\/a><\/strong> diff\u00e8re d\u2019un pilotage intensif lors de <strong><a href=\"https:\/\/www.solidess.com\/fr\/prix-de-lenergie-negatifs\/\" target=\"_blank\" style=\"color:#61CE70\">l\u2019arbitrage sur les prix n\u00e9gatifs de l\u2019\u00e9nergie<\/a><\/strong>. Chiffrez les deux r\u00e9gimes d\u2019exploitation en fonction du m\u00eame plafond d\u2019\u00e9nergie comptabilis\u00e9e au titre de la garantie avant d\u2019approuver le mod\u00e8le de revenus.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-575645ac auto-h2 elementor-widget elementor-widget-heading\" data-id=\"575645ac\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Relier DOD, C-rate, temp\u00e9rature et SOC \u00e0 l'EMS<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-429f7b2c auto-p elementor-widget elementor-widget-heading\" data-id=\"429f7b2c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les exclusions de garantie d\u00e9coulent souvent des donn\u00e9es de fonctionnement. Des dommages mat\u00e9riels visibles ne sont pas toujours n\u00e9cessaires. Le contrat devrait traduire chaque condition en une r\u00e8gle mesurable par l\u2019EMS ou le BMS. S\u2019il est impossible de consigner, d\u2019horodater et d\u2019exporter les donn\u00e9es attestant le respect d\u2019une limite, il sera difficile de prouver la conformit\u00e9 lors d\u2019une demande au titre de la garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3b5a20e7 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"3b5a20e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Plage de DOD :<\/strong> D\u00e9finir la profondeur de d\u00e9charge maximale et tout SOC de r\u00e9serve.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a1 <strong>C-rate :<\/strong> Pr\u00e9cisez les r\u00e9gimes \u00e0 puissance continue et en pointe, ainsi que la sollicitation cumul\u00e9e \u00e0 forte puissance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>Temp\u00e9rature :<\/strong> Indiquez les limites de temp\u00e9rature des cellules, des modules et de l\u2019air ambiant, ainsi que l\u2019emplacement des capteurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u23f8\ufe0f <strong>SOC au repos :<\/strong> Ma\u00eetriser les longues p\u00e9riodes \u00e0 SOC \u00e9lev\u00e9 ou faible lorsque n\u00e9cessaire.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd04 <strong>\u00c9quilibrage et maintenance :<\/strong> Consigner les interventions, micrologiciels et \u00e9talonnages requis.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udea8 <strong>Gestion des \u00e9carts :<\/strong> Fixez les alarmes, les d\u00e9lais de correction et les cons\u00e9quences applicables avant toute annulation de la garantie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-77640ab4 auto-p elementor-widget elementor-widget-heading\" data-id=\"77640ab4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Consultez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/pourquoi-lintegration-du-pcs-et-du-bms-echoue\/\" target=\"_blank\" style=\"color:#61CE70\">guide des d\u00e9faillances d'int\u00e9gration PCS et BMS<\/a><\/strong> avant d\u2019accepter le p\u00e9rim\u00e8tre de commande de mat\u00e9riels provenant de plusieurs fournisseurs. Pour les configurations \u00e0 l\u2019\u00e9tat solide, <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-evaluer-la-stabilite-de-linterface\/\" target=\"_blank\" style=\"color:#61CE70\">l\u2019\u00e9valuation de la stabilit\u00e9 de l\u2019interface<\/a><\/strong> doit \u00e9galement rester distincte des conditions de la garantie commerciale.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-22d17e95 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"22d17e95\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9finir BOL, EOL et le point de mesure de capacit\u00e9<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8c95718b auto-p elementor-widget elementor-widget-heading\" data-id=\"8c95718b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le d\u00e9but de vie (BOL) doit correspondre \u00e0 une r\u00e9f\u00e9rence dat\u00e9e, \u00e9tablie lors d\u2019un essai de mise en service ou de performance convenu. La fin de vie (EOL) doit correspondre \u00e0 un seuil minimal de capacit\u00e9 r\u00e9siduelle pour les conditions de fonctionnement fix\u00e9es au contrat. Aucun de ces deux crit\u00e8res ne doit se r\u00e9sumer \u00e0 un pourcentage ind\u00e9fini sur une fiche commerciale.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1482ee23 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"1482ee23\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Champ \u00ab Appel d'offres \u00bb<\/th><th>R\u00e9ponse requise<\/th><th>Pourquoi cela modifie la garantie<\/th><\/tr><\/thead><tbody><tr><td>R\u00e9f\u00e9rence BOL<\/td><td>Capacit\u00e9 nominale ou mesur\u00e9e \u00e0 la mise en service<\/td><td>Fixe le d\u00e9nominateur du calcul de la capacit\u00e9 r\u00e9siduelle<\/td><\/tr><tr><td>R\u00e9f\u00e9rence retenue pour la capacit\u00e9<\/td><td>\u00c9nergie nominale, \u00e9nergie utilisable en courant continu ou \u00e9nergie utilisable en courant alternatif<\/td><td>\u00c9vite de comparer des valeurs en kWh \u00e9tablies sur des bases diff\u00e9rentes<\/td><\/tr><tr><td>Point de mesure<\/td><td>Bornes de la batterie, sortie du PCS ou PCC<\/td><td>D\u00e9termine la prise en compte des pertes de conversion et de la consommation des auxiliaires<\/td><\/tr><tr><td>Plancher EOL<\/td><td>Capacit\u00e9 r\u00e9siduelle sp\u00e9cifi\u00e9e pour une ann\u00e9e donn\u00e9e ou pour une quantit\u00e9 d\u2019\u00e9nergie cumul\u00e9e d\u00e9finie<\/td><td>D\u00e9finit quand la performance passe sous le seuil garanti<\/td><\/tr><tr><td>Protocole d'essai<\/td><td>Plage de SOC, C-rate, temp\u00e9rature, p\u00e9riodes de repos et corrections<\/td><td>Rend comparables les essais de capacit\u00e9 r\u00e9p\u00e9t\u00e9s<\/td><\/tr><tr><td>Co\u00fbt des essais<\/td><td>R\u00e9partition des co\u00fbts d\u2019\u00e9nergie, de main-d\u2019\u0153uvre, de pr\u00e9sence de t\u00e9moins et d\u2019immobilisation<\/td><td>\u00c9vite que le co\u00fbt de la preuve ne fasse obstacle \u00e0 une demande au titre de la garantie<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3caec283 auto-p elementor-widget elementor-widget-heading\" data-id=\"3caec283\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La taille du syst\u00e8me influe sur le montant en jeu, sans changer la m\u00e9thode. Comparez le p\u00e9rim\u00e8tre de mesure retenu dans le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-selectionner-un-systeme-de-stockage-denergie-par-batterie-bess-exterieur-de-100-kw-215-kwh-pour-un-site-commercial-et-industriel-ci\/\" target=\"_blank\" style=\"color:#61CE70\">Guide de s\u00e9lection d'un syst\u00e8me de stockage d'\u00e9nergie (BESS) ext\u00e9rieur de 100 kW \/ 215 kWh<\/a><\/strong> \u00e0 celui du <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-des-rfq-pour-le-systeme-de-stockage-denergie-refroidi-par-liquide-de-261-kwh\/\" target=\"_blank\" style=\"color:#61CE70\">guide de demande de devis pour le syst\u00e8me de stockage par batteries de 261 kWh \u00e0 refroidissement liquide, de plus grande capacit\u00e9<\/a><\/strong>. Ne supposez pas que les deux offres garantissent l'\u00e9nergie au m\u00eame point.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-58bce2f0 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"58bce2f0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Rendre la courbe de d\u00e9gradation et le plan d'augmentation de capacit\u00e9 finan\u00e7ables<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-64cf6390 auto-p elementor-widget elementor-widget-heading\" data-id=\"64cf6390\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une seule valeur de fin de vie (EOL) masque l\u2019\u00e9volution entre la mise en service et la derni\u00e8re ann\u00e9e. Demandez un tableau annuel des seuils minimaux de capacit\u00e9 r\u00e9siduelle ou une autre courbe sans ambigu\u00eft\u00e9. Faites ensuite concorder cette r\u00e9f\u00e9rence avec les revenus annuels du projet et le mod\u00e8le de fourniture pr\u00e9vu au contrat d\u2019achat d\u2019\u00e9lectricit\u00e9 (PPA).<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-45d9cb70 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"45d9cb70\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc9 <strong>Courbe de capacit\u00e9 r\u00e9siduelle :<\/strong> Exigez une capacit\u00e9 minimale pour chaque ann\u00e9e ou selon la quantit\u00e9 d\u2019\u00e9nergie cumul\u00e9e comptabilis\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddee <strong>Mod\u00e8le financier :<\/strong> Utiliser la courbe garantie, et pas seulement l'\u00e9nergie en d\u00e9but de vie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2795 <strong>D\u00e9clencheur d'augmentation de capacit\u00e9 :<\/strong> D\u00e9finir quand une capacit\u00e9 suppl\u00e9mentaire est requise et qui paie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfd7\ufe0f <strong>Interface r\u00e9serv\u00e9e :<\/strong> R\u00e9servez l\u2019emprise au sol, la plage de tension continue, les capacit\u00e9s de protection et la marge de puissance du PCS.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\udde9 <strong>Compatibilit\u00e9 future :<\/strong> Anticipez l\u2019obsolescence des cellules, modules et racks n\u00e9cessaires au remplacement.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udce6 <strong>Strat\u00e9gie de pi\u00e8ces de rechange :<\/strong> Indiquer les conditions de stockage, la rotation, la mise en service et la garantie des pi\u00e8ces de rechange.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a4677c12 auto-p elementor-widget elementor-widget-heading\" data-id=\"a4677c12\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default translation-block\"><strong><a href=\"https:\/\/www.solidess.com\/fr\/impact-sur-le-retour-sur-investissement-roi-de-la-degradation-de-linterface-solide-solide\/\" target=\"_blank\" style=\"color:#61CE70\">L\u2019impact de la d\u00e9gradation de l\u2019interface solide-solide sur le retour sur investissement<\/a><\/strong> montre pourquoi le mod\u00e8le financier devrait tenir compte du vieillissement propre \u00e0 chaque technologie. Cet \u00e9clairage ne remplace pas une garantie de capacit\u00e9 sp\u00e9cifique au projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-afe2eb93 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"afe2eb93\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Sp\u00e9cifier la configuration \u00e0 l'\u00e9tat solide dans la garantie<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ffeab642 auto-p elementor-widget elementor-widget-heading\" data-id=\"ffeab642\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La plateforme ext\u00e9rieure ESSA de MegSolid pour les secteurs commercial et industriel peut \u00eatre configur\u00e9e avec des cellules \u00e0 l\u2019\u00e9tat solide selon les exigences du projet. Les tableaux ESSA standard indiquent des cellules LFP. La seule mention LFP ne permet pas d\u2019\u00e9tablir l\u2019architecture de l\u2019\u00e9lectrolyte. Le devis, la fiche technique sign\u00e9e, la nomenclature et la garantie doivent donc tous identifier la cellule et la configuration command\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be3104fd auto-p elementor-widget elementor-widget-heading\" data-id=\"be3104fd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une conception hybride ou \u00e0 l\u2019\u00e9tat solide valid\u00e9e peut r\u00e9duire la quantit\u00e9 de liquide inflammable et am\u00e9liorer la r\u00e9sistance \u00e0 certains modes de propagation de d\u00e9fauts internes. Cet avantage potentiel en mati\u00e8re de s\u00e9curit\u00e9 ne se traduit pas par une couverture de garantie illimit\u00e9e. Il n\u2019\u00e9limine pas l\u2019emballement thermique et ne rend pas le syst\u00e8me \u00e0 l\u2019\u00e9preuve du feu. Des preuves propres au mod\u00e8le et des contr\u00f4les en exploitation restent n\u00e9cessaires.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d328169b elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d328169b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddfe <strong>Identit\u00e9 de la configuration :<\/strong> Consigner le fabricant, le mod\u00e8le, la chimie de la cellule et l'architecture de l'\u00e9lectrolyte.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>P\u00e9rim\u00e8tre des preuves :<\/strong> Distinguez le p\u00e9rim\u00e8tre des essais \u00e0 l\u2019\u00e9chelle de la cellule, du module, du rack et du syst\u00e8me complet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>Enveloppe thermique :<\/strong> Pr\u00e9cisez les temp\u00e9ratures et les conditions de refroidissement retenues pour \u00e9tablir la garantie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd27 <strong>R\u00e8gle de remplacement :<\/strong> Pr\u00e9cisez s\u2019il est permis de m\u00e9langer des cellules d\u2019\u00e2ges diff\u00e9rents ou d\u2019utiliser des cellules de substitution.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcca <strong>Base de performance :<\/strong> Garder les preuves de s\u00e9curit\u00e9 distinctes des garanties de cycles et de capacit\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3ccd2e8 auto-p elementor-widget elementor-widget-heading\" data-id=\"d3ccd2e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/emportement-thermique-dune-batterie-a-semi-conducteurs-12-points-a-verifier-avant-de-valider-un-bess\/\" target=\"_blank\" style=\"color:#61CE70\">jeu de 12 v\u00e9rifications pour l\u2019approbation au regard de l\u2019emballement thermique<\/a><\/strong> et le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-de-lepc-sur-la-conformite-aux-normes-ul-9540a-et-cei-62619\/\" target=\"_blank\" style=\"color:#61CE70\">guide de certification des BESS<\/a><\/strong> pour v\u00e9rifier les justificatifs de s\u00e9curit\u00e9 sans extrapoler un m\u00eame document \u00e0 tous les mod\u00e8les.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1225d58d auto-h2 elementor-widget elementor-widget-heading\" data-id=\"1225d58d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Constituer des justificatifs EMS utilisables en cas de r\u00e9clamation<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-758928d5 auto-p elementor-widget elementor-widget-heading\" data-id=\"758928d5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La garantie doit pr\u00e9ciser quels enregistrements font foi, leur intervalle d\u2019\u00e9chantillonnage, leur dur\u00e9e de conservation, leur format d\u2019exportation et qui en est propri\u00e9taire. Les tableaux de bord dans le cloud sont utiles, mais une capture d\u2019\u00e9cran ne remplace ni les s\u00e9ries de donn\u00e9es chronologiques ni les relev\u00e9s de compteurs \u00e9talonn\u00e9s.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2488e2b7 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"2488e2b7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\uddc2\ufe0f <strong>Conserver :<\/strong> SOC, SOH, compteurs d'\u00e9nergie, puissance, temp\u00e9rature des cellules, alarmes et \u00e9v\u00e9nements de disponibilit\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd53 <strong>Synchronisation horaire :<\/strong> Alignez les horloges du BMS, du PCS, de l\u2019EMS et du compteur de facturation.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd10 <strong>Propri\u00e9t\u00e9 des donn\u00e9es :<\/strong> Accordez au propri\u00e9taire le droit d\u2019exporter les donn\u00e9es apr\u00e8s la fin de la garantie ou du service.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddf0 <strong>Journal des modifications :<\/strong> Consigner micrologiciels, consignes, maintenance et remplacements de composants.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccf <strong>Comptage :<\/strong> D\u00e9finir l'\u00e9talonnage, la classe de pr\u00e9cision et le traitement des donn\u00e9es manquantes.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udea9 <strong>Alerte pr\u00e9coce :<\/strong> D\u00e9clenchez une alerte lorsque l\u2019\u00e9nergie cumul\u00e9e transit\u00e9e, la temp\u00e9rature, la profondeur de d\u00e9charge (DOD) ou l\u2019\u00e9tat de charge (SOC) sortent des limites pr\u00e9vues.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-93463a93 auto-image elementor-widget elementor-widget-image\" data-id=\"93463a93\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4466\" alt=\"Preuves de garantie et flux de r\u00e9clamation d&#039;un BESS C&amp;I \u00e0 l&#039;aide des journaux EMS, des essais de capacit\u00e9 et des recours\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow.png 1200w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow-300x225.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow-1024x768.png 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow-768x576.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Warranty-Evidence-and-Claim-Workflow-600x450.png 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3fd61507 auto-p elementor-widget elementor-widget-heading\" data-id=\"3fd61507\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ajoutez les sc\u00e9narios requis pour les essais de capacit\u00e9 et de l\u2019EMS au <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dessai-de-reception-en-usine-de-bess\/\" target=\"_blank\" style=\"color:#61CE70\">plan d'essai de r\u00e9ception en usine (FAT) du BESS<\/a><\/strong>. Les essais de r\u00e9ception en usine (FAT) \u00e9tablissent la configuration et v\u00e9rifient le fonctionnement. L\u2019essai de mise en service \u00e9tablit la r\u00e9f\u00e9rence sur site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a37d0710 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a37d0710\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Int\u00e9grer ces conditions de garantie dans chaque demande de devis EPC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fba06b05 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"fba06b05\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">1\ufe0f\u20e3 <strong>\u00c9quipements couverts :<\/strong> Cellules de batterie, modules, racks, BMS, PCS, EMS, CVC, syst\u00e8me incendie et auxiliaires.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">2\ufe0f\u20e3 <strong>Date de d\u00e9but :<\/strong> Exp\u00e9dition, livraison, mise en service, r\u00e9ception ou autre jalon d\u00e9fini.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">3\ufe0f\u20e3 <strong>Profil d'exploitation :<\/strong> Cycles, \u00e9nergie cumul\u00e9e transit\u00e9e, profondeur de d\u00e9charge (DOD), taux de charge et de d\u00e9charge (C-rate), \u00e9tat de charge (SOC), temp\u00e9rature et cumul des usages.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">4\ufe0f\u20e3 <strong>Garantie de capacit\u00e9 :<\/strong> Capacit\u00e9 de r\u00e9f\u00e9rence en d\u00e9but de vie (BOL), courbe annuelle, capacit\u00e9 minimale garantie en fin de vie (EOL) et base de calcul de l\u2019\u00e9nergie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">5\ufe0f\u20e3 <strong>Mesure :<\/strong> Point de comptage, proc\u00e9dure d'essai, corrections, t\u00e9moins et co\u00fbt des essais.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">6\ufe0f\u20e3 <strong>Preuves EMS :<\/strong> Journaux requis, propri\u00e9t\u00e9 des donn\u00e9es, format d\u2019exportation et dur\u00e9e de conservation.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">7\ufe0f\u20e3 <strong>Exclusions :<\/strong> \u00c9v\u00e9nements li\u00e9s au r\u00e9seau, force majeure, modifications non autoris\u00e9es et manquements aux obligations de maintenance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">8\ufe0f\u20e3 <strong>Proc\u00e9dure de r\u00e9solution :<\/strong> Notification, investigation, d\u00e9lai de r\u00e9ponse, nouvel essai et proc\u00e9dure de remont\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">9\ufe0f\u20e3 <strong>Recours :<\/strong> R\u00e9parer, remplacer, augmenter la capacit\u00e9, prolonger la couverture ou indemniser.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd1f <strong>Cocontractant :<\/strong> Entit\u00e9 contractante, soutien de la soci\u00e9t\u00e9 m\u00e8re, service local et responsabilit\u00e9 de la fourniture de pi\u00e8ces de rechange.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-50248ff6 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"50248ff6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Pourquoi MegSolid a sa place dans la comparaison des garanties<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b92735e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"b92735e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La connaissance que MegSolid a de chaque mod\u00e8le permet de distinguer l\u2019\u00e9nergie nominale, l\u2019\u00e9nergie utilisable, la dur\u00e9e de vie en cycles, la chimie, le rendement et le p\u00e9rim\u00e8tre de certification. Cette transparence aide les acheteurs EPC \u00e0 \u00e9tablir un tableau des conditions de garantie sans transformer une valeur incompl\u00e8te de la fiche produit en engagement contractuel. L\u2019offre finale devrait n\u00e9anmoins comprendre le document de garantie sous gestion documentaire, la fiche technique sign\u00e9e, la nomenclature (BOM), le sch\u00e9ma unifilaire (SLD), la matrice de communication, le plan des essais de r\u00e9ception en usine (FAT) et le p\u00e9rim\u00e8tre des services.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2be8d6a8 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"2be8d6a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2705 <strong>Revue propre au mod\u00e8le :<\/strong> Les valeurs d'un produit ne sont pas transf\u00e9r\u00e9es \u00e0 un autre.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2705 <strong>Option \u00e0 l'\u00e9tat solide propre au projet :<\/strong> L'architecture command\u00e9e doit figurer dans tous les documents contractuels.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2705 <strong>Examen de la commande int\u00e9gr\u00e9e :<\/strong> Les exigences relatives aux justificatifs EMS sont d\u00e9finies avant le d\u00e9but du pilotage de la charge et de la d\u00e9charge.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2705 <strong>Appel d'offres comparable :<\/strong> Tous les soumissionnaires renseignent les m\u00eames rubriques sur la capacit\u00e9, l\u2019\u00e9nergie cumul\u00e9e transit\u00e9e et les mesures correctives.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b58bbed9 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"b58bbed9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Envoyez par e-mail votre tableau des conditions de garantie du BESS C&amp;I<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-996df891 auto-p elementor-widget elementor-widget-heading\" data-id=\"996df891\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Cet article pr\u00e9sente un cadre technique pour les achats. Il ne constitue ni un conseil juridique propre au projet ni une offre de garantie de MegSolid. Pour obtenir l\u2019outil Excel de comparaison des garanties, avec des champs internes pour le TRI, des donn\u00e9es d\u2019entr\u00e9e pour la courbe de d\u00e9gradation, un tableau des justificatifs EMS et une matrice de demande de devis EPC, \u00e9crivez \u00e0 <strong>sfhq2008@gmail.com<\/strong>. Indiquez le pays du projet, la puissance, l\u2019\u00e9nergie, l\u2019usage pr\u00e9vu, le profil de pilotage, la temp\u00e9rature, la dur\u00e9e d\u2019exploitation requise et la date de livraison.<\/p>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bd71ef33 auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"bd71ef33\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2ff25265 elementor-widget elementor-widget-heading\" data-id=\"2ff25265\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9d521b7b e-con-full e-flex e-con e-child\" data-id=\"9d521b7b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1eb199ef elementor-widget elementor-widget-n-accordion\" data-id=\"1eb199ef\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5140\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5140\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> La dur\u00e9e de vie en cycles d'une batterie est-elle la m\u00eame chose que la garantie d'un BESS C&amp;I ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5140\" class=\"elementor-element elementor-element-b8207836 e-con-full e-flex e-con e-child\" data-id=\"b8207836\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5140\" class=\"elementor-element elementor-element-14c07ef7 e-con-full e-flex e-con e-child\" data-id=\"14c07ef7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b084f825 elementor-widget elementor-widget-heading\" data-id=\"b084f825\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. La dur\u00e9e de vie en cycles est une valeur d'essai dans des conditions sp\u00e9cifi\u00e9es. Une garantie ajoute des r\u00e8gles d'\u00e9ligibilit\u00e9, des limites d'exploitation, des proc\u00e9dures de mesure, des exclusions et des recours.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5141\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5141\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que signifie l\u2019\u00e9nergie cumul\u00e9e transit\u00e9e dans la garantie d\u2019un BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5141\" class=\"elementor-element elementor-element-d43edc1f e-con-full e-flex e-con e-child\" data-id=\"d43edc1f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5141\" class=\"elementor-element elementor-element-4a414446 e-con-full e-flex e-con e-child\" data-id=\"4a414446\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5339d4f6 elementor-widget elementor-widget-heading\" data-id=\"5339d4f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">C\u2019est le volume d\u2019\u00e9nergie autoris\u00e9 par le contrat sur une p\u00e9riode donn\u00e9e. Le document doit pr\u00e9ciser le point de comptage et indiquer s\u2019il comptabilise l\u2019\u00e9nergie \u00e0 la charge, \u00e0 la d\u00e9charge ou dans les deux sens, ou s\u2019il repose sur le nombre de cycles complets \u00e9quivalents.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5142\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5142\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Pourquoi la profondeur de d\u00e9charge (DOD) doit-elle figurer dans la garantie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5142\" class=\"elementor-element elementor-element-9bdadc57 e-con-full e-flex e-con e-child\" data-id=\"9bdadc57\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5142\" class=\"elementor-element elementor-element-7101243a e-con-full e-flex e-con e-child\" data-id=\"7101243a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3a8d7ff2 elementor-widget elementor-widget-heading\" data-id=\"3a8d7ff2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La profondeur de d\u00e9charge modifie l\u2019\u00e9nergie transit\u00e9e \u00e0 chaque cycle et peut influer sur la d\u00e9gradation. Un nombre de cycles autoris\u00e9s ne peut pas \u00eatre compar\u00e9 correctement si la profondeur de d\u00e9charge correspondante n\u2019est pas pr\u00e9cis\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5143\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5143\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Qu'est-ce que l'EOL dans une garantie de batterie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5143\" class=\"elementor-element elementor-element-07e0728a e-con-full e-flex e-con e-child\" data-id=\"07e0728a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5143\" class=\"elementor-element elementor-element-12403a71 e-con-full e-flex e-con e-child\" data-id=\"12403a71\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b88638c9 elementor-widget elementor-widget-heading\" data-id=\"b88638c9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le seuil de capacit\u00e9 r\u00e9siduelle en fin de vie (EOL) est le minimum fix\u00e9 au contrat pour un r\u00e9gime d\u2019exploitation et une base de mesure d\u00e9finis. Il s\u2019agit d\u2019un seuil de performance qui ne signifie pas que la batterie cesse imm\u00e9diatement de fonctionner.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5144\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5144\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Comment \u00e9tablir la capacit\u00e9 en d\u00e9but de vie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5144\" class=\"elementor-element elementor-element-e38c5fca e-con-full e-flex e-con e-child\" data-id=\"e38c5fca\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5144\" class=\"elementor-element elementor-element-aa199904 e-con-full e-flex e-con e-child\" data-id=\"aa199904\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b6ad8560 elementor-widget elementor-widget-heading\" data-id=\"b6ad8560\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pr\u00e9cisez si la capacit\u00e9 en d\u00e9but de vie (BOL) correspond \u00e0 la capacit\u00e9 indiqu\u00e9e sur la plaque signal\u00e9tique ou \u00e0 la valeur mesur\u00e9e \u00e0 la mise en service. Utilisez un essai convenu dont l\u2019\u00e9tat de charge (SOC), le taux de charge et de d\u00e9charge (C-rate), la temp\u00e9rature, les p\u00e9riodes de repos et le point de comptage sont fix\u00e9s.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5145\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5145\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> La capacit\u00e9 doit-elle \u00eatre garantie c\u00f4t\u00e9 courant continu ou c\u00f4t\u00e9 courant alternatif ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5145\" class=\"elementor-element elementor-element-7cd684ca e-con-full e-flex e-con e-child\" data-id=\"7cd684ca\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5145\" class=\"elementor-element elementor-element-f2b2a060 e-con-full e-flex e-con e-child\" data-id=\"f2b2a060\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-29b561d6 elementor-widget elementor-widget-heading\" data-id=\"29b561d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les deux bases sont possibles si le contrat indique clairement laquelle s\u2019applique. L\u2019\u00e9nergie livr\u00e9e c\u00f4t\u00e9 courant alternatif ou au point de raccordement commun (PCC) tient compte des effets de conversion et des auxiliaires, qu\u2019une garantie aux bornes en courant continu peut exclure.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5146\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5146\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Une garantie de capacit\u00e9 garantit-elle aussi la disponibilit\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5146\" class=\"elementor-element elementor-element-9a4f48c6 e-con-full e-flex e-con e-child\" data-id=\"9a4f48c6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5146\" class=\"elementor-element elementor-element-1e274a02 e-con-full e-flex e-con e-child\" data-id=\"1e274a02\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-81a3e9ed elementor-widget elementor-widget-heading\" data-id=\"81a3e9ed\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pas automatiquement. La capacit\u00e9, la disponibilit\u00e9 et le rendement sont des crit\u00e8res de performance distincts, avec leurs propres m\u00e9thodes de calcul, exclusions et mesures correctives.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5147\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5147\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> MegSolid fournit-il la configuration \u00e0 l'\u00e9tat solide de l'ESSA par d\u00e9faut ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5147\" class=\"elementor-element elementor-element-14b977fb e-con-full e-flex e-con e-child\" data-id=\"14b977fb\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5147\" class=\"elementor-element elementor-element-233fc140 e-con-full e-flex e-con e-child\" data-id=\"233fc140\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-10719bfc elementor-widget elementor-widget-heading\" data-id=\"10719bfc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. Les tableaux de la gamme ESSA standard indiquent des cellules LFP. Toute configuration \u00e0 l\u2019\u00e9tat solide propre au projet doit \u00eatre confirm\u00e9e dans le devis, la fiche technique sign\u00e9e, la nomenclature (BOM) et la garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5148\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5148\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quels enregistrements un propri\u00e9taire doit-il conserver pour une r\u00e9clamation de garantie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5148\" class=\"elementor-element elementor-element-cbc53c1c e-con-full e-flex e-con e-child\" data-id=\"cbc53c1c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5148\" class=\"elementor-element elementor-element-23c29c32 e-con-full e-flex e-con e-child\" data-id=\"23c29c32\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c56d7b71 elementor-widget elementor-widget-heading\" data-id=\"c56d7b71\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Conservez les r\u00e9sultats des essais de mise en service, les relev\u00e9s des compteurs \u00e9talonn\u00e9s, les journaux de l\u2019EMS et du BMS, les alarmes, l\u2019historique des temp\u00e9ratures, les compteurs d\u2019\u00e9nergie cumul\u00e9e transit\u00e9e, les changements de micrologiciel, les relev\u00e9s de maintenance et l\u2019historique des remplacements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5149\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5149\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quels recours doivent figurer dans une garantie de BESS C&amp;I ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5149\" class=\"elementor-element elementor-element-543b741f e-con-full e-flex e-con e-child\" data-id=\"543b741f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5149\" class=\"elementor-element elementor-element-51a6ca74 e-con-full e-flex e-con e-child\" data-id=\"51a6ca74\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-783defaf elementor-widget elementor-widget-heading\" data-id=\"783defaf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">D\u00e9finissez les modalit\u00e9s d\u2019investigation, de r\u00e9paration, de remplacement, d\u2019ajout de capacit\u00e9, de nouvel essai, de prolongation de la garantie ou d\u2019indemnisation. Pr\u00e9cisez les d\u00e9lais de r\u00e9ponse et qui prend en charge la main-d\u2019\u0153uvre, le transport et les temps d\u2019arr\u00eat.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-51410\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-51410\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Qu'est-ce qu'une garantie \u00ab C&amp;I \u00bb pour un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51410\" class=\"elementor-element elementor-element-2a97d635 e-con-full e-flex e-con e-child\" data-id=\"2a97d635\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51410\" class=\"elementor-element elementor-element-2e42af2e e-con-full e-flex e-con e-child\" data-id=\"2e42af2e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9fd8b3af elementor-widget elementor-widget-heading\" data-id=\"9fd8b3af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">C\u2019est le cadre contractuel qui couvre les d\u00e9fauts et les performances sp\u00e9cifi\u00e9es du syst\u00e8me de batteries, selon un profil d\u2019exploitation, une m\u00e9thode de mesure, des donn\u00e9es probantes et une proc\u00e9dure de recours convenus.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-51411\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-51411\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Comment les EPC peuvent-ils comparer les conditions de garantie des syst\u00e8mes de stockage d'\u00e9nergie par batterie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51411\" class=\"elementor-element elementor-element-37113478 e-con-full e-flex e-con e-child\" data-id=\"37113478\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51411\" class=\"elementor-element elementor-element-919ee46c e-con-full e-flex e-con e-child\" data-id=\"919ee46c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7834d20c elementor-widget elementor-widget-heading\" data-id=\"7834d20c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez un tableau commun pour la couverture, l\u2019\u00e9nergie cumul\u00e9e transit\u00e9e, la profondeur de d\u00e9charge (DOD), le taux de charge et de d\u00e9charge (C-rate), la temp\u00e9rature, le d\u00e9but de vie (BOL), la fin de vie (EOL), le point de mesure, les essais de capacit\u00e9, les exclusions, les justificatifs et les mesures correctives.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-51412\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-51412\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que doivent envoyer les acheteurs \u00e0 MegSolid pour une v\u00e9rification de la garantie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51412\" class=\"elementor-element elementor-element-9221b16b e-con-full e-flex e-con e-child\" data-id=\"9221b16b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-51412\" class=\"elementor-element elementor-element-5598fbbb e-con-full e-flex e-con e-child\" data-id=\"5598fbbb\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8898b29d elementor-widget elementor-widget-heading\" data-id=\"8898b29d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Envoyez le profil de charge, l\u2019usage pr\u00e9vu, la puissance requise en kW et l\u2019\u00e9nergie requise en kWh, le calendrier de pilotage, les conditions du site, la dur\u00e9e de garantie, l\u2019objectif de maintien de la capacit\u00e9, les exigences concernant l\u2019EMS et la date de livraison du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Comparez les conditions de garantie des syst\u00e8mes de stockage d'\u00e9nergie par batterie (BESS) C&amp;I en fonction du d\u00e9bit, du taux de d\u00e9charge (DOD), de la capacit\u00e9 en fin de vie (EOL), du point de mesure, des preuves fournies par le syst\u00e8me de gestion de l'\u00e9nergie (EMS), des tests de d\u00e9gradation et des recours contractuels.<\/p>","protected":false},"author":4,"featured_media":4464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[1,713],"tags":[211,208,209,210,212],"class_list":["post-4467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-bess-procurement-economics","tag-battery-cycle-life-warranty","tag-battery-energy-storage-warranty-terms","tag-bess-degradation-guarantee","tag-commercial-battery-storage-warranty","tag-megsolid-bess"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=4467"}],"version-history":[{"count":4,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4467\/revisions"}],"predecessor-version":[{"id":4471,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4467\/revisions\/4471"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/4464"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=4467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=4467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=4467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}