{"id":4495,"date":"2026-08-04T10:14:50","date_gmt":"2026-08-04T02:14:50","guid":{"rendered":"https:\/\/www.solidess.com\/?p=4495"},"modified":"2026-11-18T22:47:36","modified_gmt":"2026-11-18T14:47:36","slug":"comment-specifier-un-controle-de-zero-injection-au-pcc-pour-un-systeme-de-stockage-denergie-par-batterie-bess","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/how-to-specify-bess-zero-export-control-at-the-pcc\/","title":{"rendered":"Comment sp\u00e9cifier la commande z\u00e9ro injection du BESS au point de couplage commun (PCC)"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4495\" class=\"elementor elementor-4495\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f0864a12 auto-p elementor-widget elementor-widget-heading\" data-id=\"f0864a12\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default translation-block\"><strong>La commande z\u00e9ro injection du BESS<\/strong> r\u00e9gule la puissance active nette au <strong>point de couplage commun contractuel (PCC) du BESS<\/strong>. Elle utilise les signaux v\u00e9rifi\u00e9s des transformateurs de courant et du compteur pour coordonner la puissance de sortie du PCS et la limitation de la production photovolta\u00efque. Le cahier des charges de l\u2019entreprise EPC doit d\u00e9finir la consigne d\u2019injection, la priorit\u00e9 des actionneurs, les limites de charge et d\u2019\u00e9tat de charge (SOC) de la batterie, ainsi que la r\u00e9action de repli s\u00fbr en cas de perte de communication ou de r\u00e9ception de donn\u00e9es p\u00e9rim\u00e9es. V\u00e9rifiez la r\u00e9ponse de l\u2019ensemble du site au PCC, y compris lorsque la batterie ne peut pas \u00eatre charg\u00e9e. Pour choisir les \u00e9quipements, examinez <a href=\"https:\/\/www.solidess.com\/fr\/piles\/stockage-denergie-ci\/\" target=\"_self\">la gamme de BESS commerciaux et industriels de MegSolid<\/a> au regard de la sp\u00e9cification de commande approuv\u00e9e pour le projet. Pour s\u00e9lectionner le PCS, comparez <a href=\"https:\/\/www.solidess.com\/fr\/piles\/onduleur-de-stockage-denergie\/\" target=\"_self\">les PCS bidirectionnels et les onduleurs de stockage d\u2019\u00e9nergie de 30 \u00e0 500 kW<\/a> aux exigences d\u2019interface avec le compteur, l\u2019EMS et les protections.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-87816e98 auto-image elementor-widget elementor-widget-image\" data-id=\"87816e98\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4492\" alt=\"Contr\u00f4le \u00ab z\u00e9ro exportation \u00bb MegSolid BESS au PCC pour les installations solaires commerciales et le stockage par batterie\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC.jpg 1000w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC-300x300.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC-150x150.jpg 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC-768x768.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC-600x600.jpg 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-Control-at-the-PCC-100x100.jpg 100w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-716ee88b elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"716ee88b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccd <strong>Mesure au PCC contractuel :<\/strong> Les mesures du compteur de commande doivent englober toutes les charges, tous les onduleurs photovolta\u00efques et tous les circuits de puissance du BESS concern\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfaf <strong>D\u00e9finir l'objectif :<\/strong> Pr\u00e9cisez si l\u2019exigence porte sur le z\u00e9ro injection, une injection limit\u00e9e ou une marge minimale de soutirage sur le r\u00e9seau.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\udde0 <strong>Valider la priorit\u00e9 des actionneurs :<\/strong> D\u00e9terminez quand l\u2019EMS doit charger le BESS, r\u00e9duire sa d\u00e9charge ou limiter la production photovolta\u00efque.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udee1\ufe0f <strong>Respectez les limites de l'\u00e9quipement :<\/strong> Les limites de charge, de d\u00e9charge, d\u2019\u00e9tat de charge (SOC) et d\u2019alarme du BMS et du PCS priment sur les objectifs commerciaux de la commande.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0c <strong>Sp\u00e9cifier le comportement en cas de d\u00e9faillance :<\/strong> D\u00e9finissez des r\u00e9actions locales explicites en cas de perte du comptage, de donn\u00e9es p\u00e9rim\u00e9es ou de d\u00e9faillance de la liaison avec le contr\u00f4leur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>Essayer le syst\u00e8me au point de mesure r\u00e9el :<\/strong> Les essais FAT et SAT doivent couvrir les \u00e9chelons de charge et de production photovolta\u00efque, les limites de la batterie et les pertes de communication.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bc90bdfc elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"bc90bdfc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#\" target=\"_blank\" id=\"my_pdf\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander une description fonctionnelle de la commande au PCC<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e3b49038 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"e3b49038\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">R\u00e9ponse directe : r\u00e9guler la puissance nette au <strong>point de couplage commun (PCC) du BESS<\/strong><\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a2f9185e auto-p elementor-widget elementor-widget-heading\" data-id=\"a2f9185e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L\u2019EMS devrait r\u00e9guler la puissance active nette mesur\u00e9e au PCC approuv\u00e9 selon une seule consigne de puissance avec signe. Dans l\u2019exemple o\u00f9 le soutirage est compt\u00e9 positivement, <strong>Soutirage au PCC = puissance appel\u00e9e par le site \u2212 puissance photovolta\u00efque \u2212 puissance de d\u00e9charge du BESS + puissance de charge du BESS<\/strong>. Le projet peut retenir une autre convention de signe, mais le compteur, l\u2019EMS, le PCS, le SCADA et le rapport d\u2019essai doivent tous appliquer la m\u00eame.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dc5d6782 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"dc5d6782\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Champ de sp\u00e9cification<\/th><th>D\u00e9cision \u00e0 prendre avant l'\u00e9tablissement du devis<\/th><th>Justificatifs requis \u00e0 la remise de l\u2019installation<\/th><\/tr><\/thead><tbody><tr><td>Point de r\u00e9f\u00e9rence<\/td><td>Emplacement pr\u00e9cis du PCC, du point de r\u00e9f\u00e9rence ou de la limite de mesure du compteur du gestionnaire de r\u00e9seau<\/td><td>SLD approuv\u00e9, emplacement CT et identifiant du compteur<\/td><\/tr><tr><td>Consigne d\u2019injection<\/td><td>Z\u00e9ro, valeur limite d\u2019injection ou marge de soutirage approuv\u00e9e pour le projet<\/td><td>Tableau des r\u00e9glages et description fonctionnelle de la commande sign\u00e9e<\/td><\/tr><tr><td>Actifs contr\u00f4l\u00e9s<\/td><td>PCS du BESS, onduleur photovolta\u00efque ou contr\u00f4leur de centrale, et toute charge pilotable<\/td><td>Matrice des responsabilit\u00e9s de commande et des communications<\/td><\/tr><tr><td>Comportement dynamique<\/td><td>\u00c9chantillonnage, filtrage, bande morte, rampe, d\u00e9lai d\u2019expiration et reprise<\/td><td>Fichiers de tendances FAT et SAT horodat\u00e9s<\/td><\/tr><tr><td>\u00c9tat de s\u00e9curit\u00e9<\/td><td>R\u00e9action approuv\u00e9e en cas de mesure invalide ou de perte de communication<\/td><td>Alarme, commande de repli et enregistrement de la reprise<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9dabae15 auto-p elementor-widget elementor-widget-heading\" data-id=\"9dabae15\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ne confondez pas une valeur affich\u00e9e avec le r\u00e9sultat exig\u00e9 par le contrat. Les lignes directrices sur la commande de l\u2019injection distinguent les syst\u00e8mes sans injection des syst\u00e8mes \u00e0 injection limit\u00e9e. Elles traitent l\u2019injection involontaire lors de changements rapides comme un comportement distinct \u00e0 \u00e9valuer. Le <strong><a href=\"https:\/\/energystorageinterconnection.org\/iii-requirements-for-limited-and-non-export-controls\/\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">cadre BATRIES sur la limitation et la pr\u00e9vention de l\u2019injection<\/a><\/strong> constitue une r\u00e9f\u00e9rence utile. Les documents applicables du gestionnaire de r\u00e9seau et ceux qui r\u00e9gissent le raccordement restent d\u00e9terminants pour le projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-353aaa5b auto-h2 elementor-widget elementor-widget-heading\" data-id=\"353aaa5b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9finir s\u00e9par\u00e9ment le z\u00e9ro injection, l\u2019injection limit\u00e9e et la limite de soutirage<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e33545c6 auto-p elementor-widget elementor-widget-heading\" data-id=\"e33545c6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces fonctions r\u00e9pondent \u00e0 des besoins diff\u00e9rents et sont souvent confondues dans les demandes de devis. Indiquer seulement \u00ab pas de puissance inverse \u00bb laisse le fournisseur deviner la valeur admissible en r\u00e9gime permanent, la limite transitoire, la dur\u00e9e et la r\u00e9ponse en cas de perte de mesure.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0a313e6c auto-table elementor-widget elementor-widget-text-editor\" data-id=\"0a313e6c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Exigence op\u00e9rationnelle<\/th><th>Ce que contr\u00f4le l'EMS<\/th><th>Erreur courante en mati\u00e8re de passation de march\u00e9s<\/th><\/tr><\/thead><tbody><tr><td>Z\u00e9ro injection<\/td><td>Emp\u00eache l\u2019injection volontaire de puissance active au point de r\u00e9f\u00e9rence convenu<\/td><td>Supposer que la consigne z\u00e9ro exclut tout \u00e9cart instantan\u00e9, quel que soit l\u2019\u00e9v\u00e9nement<\/td><\/tr><tr><td>Injection limit\u00e9e<\/td><td>Maintient l\u2019injection \u00e0 un niveau inf\u00e9rieur ou \u00e9gal au plafond non nul approuv\u00e9<\/td><td>Laisser le plafond, l\u2019intervalle de calcul de la moyenne ou la tol\u00e9rance sans d\u00e9finition<\/td><\/tr><tr><td>Limite de soutirage sur le r\u00e9seau<\/td><td>Limite la puissance appel\u00e9e par l\u2019installation sur le r\u00e9seau<\/td><td>Assimiler la limitation du soutirage \u00e0 la pr\u00e9vention de l\u2019injection<\/td><\/tr><tr><td>Fonctionnement en \u00eelot<\/td><td>R\u00e9gule un micror\u00e9seau s\u00e9par\u00e9 \u00e9lectriquement apr\u00e8s l\u2019ouverture du disjoncteur de raccordement au r\u00e9seau<\/td><td>Attendre de la boucle z\u00e9ro injection en mode raccord\u00e9 au r\u00e9seau qu\u2019elle d\u00e9finisse l\u2019\u00eelotage et le basculement<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b668e568 auto-p elementor-widget elementor-widget-heading\" data-id=\"b668e568\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La hi\u00e9rarchie de fonctionnement doit aussi \u00eatre explicite. Le z\u00e9ro injection est une contrainte obligatoire au PCC. La r\u00e9serve de secours, l\u2019\u00e9cr\u00eatement des pointes et la recharge solaire se partagent les possibilit\u00e9s de fonctionnement restantes de la batterie. Pour attribuer la responsabilit\u00e9 des signaux, consultez <strong><a href=\"https:\/\/www.solidess.com\/fr\/architecture-de-communication-bms-ems-dans-un-bess\/\" target=\"_blank\" style=\"color:#61ce70\">l\u2019architecture de communication entre le BMS et l\u2019EMS<\/a><\/strong> . Pour les besoins de puissance, d\u2019\u00e9nergie et les plages de fourniture de l\u2019\u00e9lectricit\u00e9, consultez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/projet-hydra-de-bess-en-afrique-du-sud-energie-solaire-regulable\/\" target=\"_blank\" style=\"color:#61ce70\">guide sur le solaire pilotable associ\u00e9 au stockage par batterie<\/a><\/strong> qui couvre ces param\u00e8tres.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-836c10fd auto-h2 elementor-widget elementor-widget-heading\" data-id=\"836c10fd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Placer le compteur de fa\u00e7on \u00e0 mesurer l\u2019ensemble du site<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-37c4b446 auto-p elementor-widget elementor-widget-heading\" data-id=\"37c4b446\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une boucle z\u00e9ro injection d\u00e9pend de l\u2019exhaustivit\u00e9 de son p\u00e9rim\u00e8tre de mesure. Si un d\u00e9part photovolta\u00efque existant, un nouveau d\u00e9part BESS ou une partie des charges de l\u2019usine \u00e9chappe au compteur de commande, l\u2019EMS peut r\u00e9guler une valeur erron\u00e9e alors que le compteur du gestionnaire enregistre une injection. Le sch\u00e9ma unifilaire doit donc montrer la position de chaque source et charge par rapport aux transformateurs de courant (TC) du PCC.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-725a7921 auto-image elementor-widget elementor-widget-image\" data-id=\"725a7921\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture.webp\" class=\"attachment-1536x1536 size-1536x1536 wp-image-8588\" alt=\"BESS PCC zero-export control architecture linking the PCC meter, EMS, PV inverter and battery PCS.\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture.webp 1000w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture-300x225.webp 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture-768x576.webp 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture-16x12.webp 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/bess-pcc-zero-export-architecture-600x450.webp 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c2fad40 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"2c2fad40\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a1 <strong>Compteur PCC ou transformateurs de courant (TC) :<\/strong> Mesurez la puissance active nette triphas\u00e9e avec un rapport de transformation, une polarit\u00e9, une correspondance des phases et un \u00e9tat de qualit\u00e9 des donn\u00e9es v\u00e9rifi\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\udde0 <strong>EMS du site ou contr\u00f4leur d\u2019installation :<\/strong> Validez la mesure, calculez l\u2019\u00e9cart par rapport \u00e0 la consigne et r\u00e9partissez la correction admissible.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2600\ufe0f <strong>Chemin de contr\u00f4le PV :<\/strong> V\u00e9rifiez si l\u2019EMS peut limiter directement la production de chaque onduleur ou s\u2019il doit envoyer une consigne \u00e0 un contr\u00f4leur d\u2019installation distinct.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Chemin de contr\u00f4le BESS :<\/strong> Ne commandez la charge ou la d\u00e9charge que dans les limites disponibles du BMS et du PCS.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfed <strong>Charges du site :<\/strong> Recensez les charges importantes dont la coupure peut provoquer une injection soudaine lorsque la demande baisse.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd12 <strong>\u00c9tat de l'appareillage de commutation :<\/strong> Utilisez des informations fiables sur la position des disjoncteurs et le mode de fonctionnement pour emp\u00eacher le contr\u00f4leur d\u2019appliquer la boucle du mode raccord\u00e9 au r\u00e9seau dans une topologie inadapt\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b8c1ec2d auto-p elementor-widget elementor-widget-heading\" data-id=\"b8c1ec2d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ce m\u00eame principe de p\u00e9rim\u00e8tre est illustr\u00e9 dans le <strong><a href=\"https:\/\/www.solidess.com\/fr\/bess-pour-les-bornes-de-recharge-electrique\/\" target=\"_blank\" style=\"color:#61ce70\">guide de MegSolid sur les BESS pour les stations de recharge de v\u00e9hicules \u00e9lectriques<\/a><\/strong>, o\u00f9 le compteur au PCC, l\u2019EMS du site, le PCS\/BMS et le contr\u00f4leur des bornes ont des fonctions distinctes. Le pr\u00e9sent article traite de l\u2019exigence de commande de l\u2019injection en boucle ferm\u00e9e, et non du dimensionnement des bornes.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ff72a07b auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ff72a07b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">R\u00e9digez la description du syst\u00e8me de r\u00e9gulation en boucle ferm\u00e9e avant de commencer \u00e0 coder<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-96c6d3e8 auto-p elementor-widget elementor-widget-heading\" data-id=\"96c6d3e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La description fonctionnelle de la commande devrait d\u00e9crire en termes techniques clairs un cycle complet, de l\u2019acquisition de la mesure \u00e0 la r\u00e9ponse. Elle sert de base \u00e0 la configuration logicielle, aux essais d\u2019interface et \u00e0 la r\u00e9ception contractuelle. Elle \u00e9vite aussi que l\u2019entreprise photovolta\u00efque, le fournisseur de BESS ou l\u2019int\u00e9grateur EMS ne suppose qu\u2019un autre intervenant est responsable du r\u00e9sultat final au PCC.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3da8d5f1 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"3da8d5f1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">1\ufe0f\u20e3 <strong>Valider la mesure :<\/strong> V\u00e9rifiez l'horodatage, la qualit\u00e9 des donn\u00e9es, les totaux par phase et l'actualit\u00e9 des donn\u00e9es avant d'utiliser la valeur PCC.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">2\ufe0f\u20e3 <strong>Calculer l\u2019\u00e9cart \u00e0 la consigne :<\/strong> Comparez la puissance mesur\u00e9e au PCC \u00e0 la consigne de z\u00e9ro injection, d\u2019injection limit\u00e9e ou de marge de soutirage.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">3\ufe0f\u20e3 <strong>Appliquer des limites strictes :<\/strong> Respectez l\u2019\u00e9tat de charge (SOC) de la batterie, les puissances disponibles en charge et en d\u00e9charge, l\u2019\u00e9tat du PCS, les limites de production photovolta\u00efque et les alarmes actives.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">4\ufe0f\u20e3 <strong>S\u00e9lectionner l\u2019actionneur approuv\u00e9 :<\/strong> Recharger le syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS), r\u00e9duire la d\u00e9charge du BESS, limiter la production photovolta\u00efque ou g\u00e9rer une charge approuv\u00e9e selon l'ordre d\u00e9fini dans le contrat.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">5\ufe0f\u20e3 <strong>Formulez la commande :<\/strong> Appliquer la bande morte, le filtrage, la rampe et la logique anti-oscillation sp\u00e9cifiques au projet sans masquer une erreur persistante.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">6\ufe0f\u20e3 <strong>V\u00e9rifier la r\u00e9ponse mesur\u00e9e :<\/strong> Comparez la puissance r\u00e9elle du PCC avec la valeur de consigne et consignez la commande, la r\u00e9ponse, les limites et l'\u00e9tat actif.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">7\ufe0f\u20e3 <strong>Transmettre les exceptions :<\/strong> D\u00e9clenchez une alarme si les actionneurs disponibles ne permettent pas de satisfaire l\u2019exigence en raison de l\u2019\u00e9tat de charge, de l\u2019\u00e9tat des \u00e9quipements ou des communications.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-241a2d94 auto-p elementor-widget elementor-widget-heading\" data-id=\"241a2d94\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une faible marge de soutirage approuv\u00e9e pour le projet peut limiter les franchissements r\u00e9p\u00e9t\u00e9s de z\u00e9ro. Elle ne correspond \u00e0 aucune valeur universelle. L\u2019exigence du gestionnaire de r\u00e9seau, la pr\u00e9cision du compteur, la variabilit\u00e9 de la charge du site, la r\u00e9ponse du contr\u00f4leur et l\u2019incidence commerciale d\u00e9terminent le r\u00e9glage final. Le m\u00eame principe vaut pour le temps de r\u00e9ponse et l\u2019injection involontaire tol\u00e9r\u00e9e. Consignez les valeurs accept\u00e9es dans les documents du projet sans reprendre une valeur g\u00e9n\u00e9rique issue d\u2019une autre installation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8e669f6 auto-p elementor-widget elementor-widget-heading\" data-id=\"8e669f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Lorsqu\u2019un groupe \u00e9lectrog\u00e8ne diesel partage le jeu de barres CA avec le syst\u00e8me de batteries, l\u2019EMS doit aussi emp\u00eacher le PCS de renvoyer de la puissance active vers le groupe. Consultez notre <strong><a href=\"https:\/\/www.solidess.com\/fr\/controle-de-bess-et-de-groupe-electrogene-diesel-sans-declenchements-sur-puissance-inverse\/\" target=\"_blank\" style=\"color:#61CE70\">guide de commande des syst\u00e8mes BESS et groupes \u00e9lectrog\u00e8nes diesel<\/a><\/strong> pour la r\u00e9partition des responsabilit\u00e9s de commande, la protection li\u00e9e \u00e0 la charge minimale, la logique de repli s\u00fbr et les essais de d\u00e9clenchement sur puissance inverse.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-49c85c79 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"49c85c79\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Sp\u00e9cifier la mise en s\u00e9curit\u00e9 pour chaque perte de signal<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ed7146a2 auto-p elementor-widget elementor-widget-heading\" data-id=\"ed7146a2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une boucle z\u00e9ro injection qui ne fonctionne qu\u2019en l\u2019absence d\u2019anomalie sur les paquets Ethernet est incompl\u00e8te. La demande de devis doit d\u00e9finir, pour chaque liaison de commande, la d\u00e9tection des donn\u00e9es p\u00e9rim\u00e9es, le d\u00e9lai d\u2019expiration des consignes, le repli local et la reprise. La r\u00e9ponse la plus s\u00fbre d\u00e9pend du projet, car certaines installations peuvent limiter localement leur production photovolta\u00efque et d\u2019autres d\u00e9pendent d\u2019un contr\u00f4leur central.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-72e067bc auto-table elementor-widget elementor-widget-text-editor\" data-id=\"72e067bc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Condition anormale<\/th><th>Limite de sp\u00e9cification requise<\/th><th>Preuve d'acceptation<\/th><\/tr><\/thead><tbody><tr><td>Donn\u00e9es du compteur PCC invalides ou p\u00e9rim\u00e9es<\/td><td>Cesser d\u2019utiliser la derni\u00e8re valeur et passer dans l\u2019\u00e9tat de repli s\u00fbr sans injection approuv\u00e9<\/td><td>Indicateur de qualit\u00e9, d\u00e9lai d\u2019expiration, alarme et courbe mesur\u00e9e qui en r\u00e9sulte au PCC<\/td><\/tr><tr><td>Liaison EMS\u2013BESS perdue<\/td><td>D\u00e9finir le repli local du PCS et pr\u00e9ciser si la d\u00e9charge est bloqu\u00e9e ou limit\u00e9e<\/td><td>D\u00e9lai d'expiration de la commande, mode local et puissance r\u00e9elle de la batterie<\/td><\/tr><tr><td>Perte de la commande photovolta\u00efque par l\u2019EMS<\/td><td>D\u00e9finir la capacit\u00e9 d\u2019absorption restante du BESS et le mode de repli ind\u00e9pendant du photovolta\u00efque<\/td><td>\u00c9tat de la commande PV, marge disponible du BESS et r\u00e9sultat au PCC<\/td><\/tr><tr><td>Batterie \u00e0 SOC \u00e9lev\u00e9 ou \u00e0 la limite de charge<\/td><td>R\u00e9duire la consigne de charge du BESS et suivre la s\u00e9quence approuv\u00e9e de limitation de la production photovolta\u00efque<\/td><td>Limite BMS, allocation EMS, r\u00e9ponse du PV et alarme<\/td><\/tr><tr><td>Red\u00e9marrage du contr\u00f4leur ou perte de synchronisation horaire<\/td><td>Effectuer une initialisation contr\u00f4l\u00e9e avant de r\u00e9tablir le pilotage automatique<\/td><td>\u00c9tat de d\u00e9marrage, horodatages synchronis\u00e9s et tendance de reprise sans \u00e0-coup<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7860fb02 auto-p elementor-widget elementor-widget-heading\" data-id=\"7860fb02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ne laissez pas l\u2019option \u00ab maintenir la derni\u00e8re consigne \u00bb comme comportement par d\u00e9faut sans la d\u00e9finir. Une consigne de d\u00e9charge p\u00e9rim\u00e9e peut provoquer une injection lorsqu\u2019une charge du site dispara\u00eet. Le <strong><a href=\"https:\/\/dps.ny.gov\/system\/files\/documents\/2023\/12\/huque-epri_ny-itwg_dec-13-2013.pdf\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">document de l\u2019EPRI pr\u00e9sentant les essais de contr\u00f4le de la r\u00e9injection des ESS<\/a><\/strong> couvre les \u00e9chelons de charge et de production ainsi que les essais de signaux de capteur anormaux. Il montre pourquoi le fonctionnement normal ne constitue pas une preuve suffisante.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3967797f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"3967797f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9finir les crit\u00e8res de r\u00e9ussite et d\u2019\u00e9chec des essais z\u00e9ro injection FAT et SAT<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94ef735a auto-p elementor-widget elementor-widget-heading\" data-id=\"94ef735a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">En usine, les essais devraient v\u00e9rifier la logique approuv\u00e9e en simulant les sources, les charges, les \u00e9tats de charge et les d\u00e9faillances de signal. Sur site, les cas critiques doivent \u00eatre r\u00e9p\u00e9t\u00e9s avec le compteur PCC install\u00e9, le c\u00e2blage r\u00e9el des transformateurs de courant, le r\u00e9seau r\u00e9el et les \u00e9quipements photovolta\u00efques et BESS mis en service. Une capture d\u2019\u00e9cran du tableau de bord ne constitue pas un proc\u00e8s-verbal de r\u00e9ussite.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-04f5e4cb auto-image elementor-widget elementor-widget-image\" data-id=\"04f5e4cb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-FAT-and-SAT-Test-Matrix.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4494\" alt=\"Essais FAT et SAT z\u00e9ro export du BESS MegSolid pour les \u00e9chelons de charge, les \u00e9chelons PV et la perte du compteur PCC\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-FAT-and-SAT-Test-Matrix.png 1000w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-FAT-and-SAT-Test-Matrix-300x225.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-FAT-and-SAT-Test-Matrix-768x576.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Zero-Export-FAT-and-SAT-Test-Matrix-600x450.png 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7d8c73e6 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"7d8c73e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\udded <strong>V\u00e9rification du compteur :<\/strong> V\u00e9rifiez le rapport des transformateurs de courant, la polarit\u00e9, l\u2019ordre des phases, le sens du soutirage et de l\u2019injection, ainsi que le calcul de la puissance totale.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc9 <strong>Essai de chute de charge :<\/strong> Coupez une charge importante pendant que la production photovolta\u00efque, le BESS ou les deux fonctionnent, puis enregistrez l\u2019injection involontaire et la reprise.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2600\ufe0f <strong>Essai d'\u00e9chelon PV :<\/strong> Augmenter la production simul\u00e9e ou r\u00e9elle et v\u00e9rifier la hi\u00e9rarchie approuv\u00e9e des actionneurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Essai aux limites de SOC :<\/strong> R\u00e9p\u00e9tez l\u2019essai de la commande pr\u00e8s des limites maximale et minimale d\u2019\u00e9tat de charge autoris\u00e9es pour v\u00e9rifier que le syst\u00e8me g\u00e8re correctement l\u2019indisponibilit\u00e9 de la puissance de la batterie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0c <strong>Essai de perte de signal :<\/strong> Interrompez s\u00e9par\u00e9ment la mesure au PCC et chaque liaison de commande critique. V\u00e9rifiez le d\u00e9lai d\u2019expiration, l\u2019alarme et l\u2019\u00e9tat de repli s\u00fbr.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u21a9\ufe0f <strong>Test de r\u00e9cup\u00e9ration :<\/strong> R\u00e9tablissez le signal ou le contr\u00f4leur et d\u00e9montrez une reprise contr\u00f4l\u00e9e, sans \u00e9chelon de puissance involontaire.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd52 <strong>Ensemble de donn\u00e9es :<\/strong> Exporter la puissance PCC synchronis\u00e9e, la puissance PV, la puissance de la batterie, le SOC, les limites, les commandes, les alarmes et les \u00e9tats de fonctionnement.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32cab8f5 auto-p elementor-widget elementor-widget-heading\" data-id=\"32cab8f5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dessai-de-reception-en-usine-de-bess\/\" target=\"_blank\" style=\"color:#61ce70\">Guide des essais de r\u00e9ception en usine BESS<\/a><\/strong> de MegSolid pour d\u00e9finir le p\u00e9rim\u00e8tre des essais avant exp\u00e9dition auxquels les t\u00e9moins doivent assister. Le plan d\u2019essais z\u00e9ro injection devrait ensuite pr\u00e9ciser les \u00e9v\u00e9nements propres au PCC, la tol\u00e9rance accept\u00e9e, la fen\u00eatre d\u2019\u00e9valuation, la pr\u00e9cision des instruments, le t\u00e9moin d\u00e9sign\u00e9 et l\u2019obligation de nouvel essai. Pour la mise en service sur site, utilisez la <a href=\"https:\/\/www.solidess.com\/fr\/essai-sat-dexport-nul-dun-bess\/\">matrice d\u2019essais SAT de la commande z\u00e9ro injection du BESS<\/a> pour consigner les courbes au PCC et attribuer le r\u00e9sultat PASS, FAIL ou HOLD \u00e0 chaque cas requis.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d24a1727 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d24a1727\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Faire correspondre la limite de contr\u00f4le \u00e0 la plateforme MegSolid ESSA<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5cdf8ec6 auto-p elementor-widget elementor-widget-heading\" data-id=\"5cdf8ec6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default translation-block\">La <strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-en-armoire-exterieure\/\" target=\"_blank\" style=\"color:#61ce70\">plateforme BESS ESSA ext\u00e9rieure de MegSolid pour les applications commerciales et industrielles<\/a><\/strong> est la gamme de produits qui correspond directement \u00e0 cette application. Les donn\u00e9es produit ma\u00eetris\u00e9es indiquent des mod\u00e8les d\u2019une puissance nominale de 30 \u00e0 100 kW c\u00f4t\u00e9 courant alternatif, des configurations d\u2019une \u00e9nergie nominale de 55,296 \u00e0 215,04 kWh, des communications RS485 et TCP-IP, des fonctions EMS int\u00e9gr\u00e9es, la pr\u00e9vision de la capacit\u00e9 et de la dur\u00e9e de d\u00e9charge, et l\u2019acc\u00e8s simultan\u00e9 \u00e0 la charge, \u00e0 la batterie, au r\u00e9seau, au groupe \u00e9lectrog\u00e8ne diesel et au photovolta\u00efque.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b3535d0d elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"b3535d0d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd17 <strong>Base d'int\u00e9gration utile :<\/strong> Les communications publi\u00e9es et l'acc\u00e8s multi-sources soutiennent une architecture de contr\u00f4le de projet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc4 <strong>Reste propre au projet :<\/strong> La consigne de z\u00e9ro injection, le type de compteur, la table des registres, la fr\u00e9quence d\u2019acquisition, la s\u00e9quence des actionneurs et l\u2019\u00e9tat de repli s\u00fbr sont propres au projet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>La r\u00e9ception reste contractuelle :<\/strong> La description fonctionnelle de commande de la configuration command\u00e9e et le plan des essais FAT\/SAT doivent d\u00e9finir le r\u00e9sultat mesurable.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>Limite du mod\u00e8le :<\/strong> Les mod\u00e8les ESSA, dont l'ESSA0100B-0215, sont publi\u00e9s avec un refroidissement par air intelligent ; ne transposez pas les donn\u00e9es de refroidissement liquide d'une autre plateforme.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-deb93015 auto-p elementor-widget elementor-widget-heading\" data-id=\"deb93015\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les tableaux ESSA publics indiquent des cellules LFP, tandis que MegSolid peut \u00e9valuer une <strong>option de cellule de batterie \u00e0 l'\u00e9tat solide sp\u00e9cifique au projet<\/strong>. Les acheteurs devraient consulter la <strong><a href=\"https:\/\/www.solidess.com\/fr\/systemes-de-stockage-denergie-a-letat-solide\/\" target=\"_blank\" style=\"color:#61ce70\">pr\u00e9sentation du syst\u00e8me de stockage d'\u00e9nergie \u00e0 l'\u00e9tat solide MegSolid<\/a><\/strong> et exiger que le devis, la fiche technique sign\u00e9e et la nomenclature (BOM) pr\u00e9cisent le mod\u00e8le de cellule fourni, la chimie de la cathode, l\u2019architecture de l\u2019\u00e9lectrolyte et le p\u00e9rim\u00e8tre couvert par les preuves. Une conception \u00e0 l\u2019\u00e9tat solide \u00e9tay\u00e9e peut r\u00e9duire certains risques. Elle ne doit jamais \u00eatre pr\u00e9sent\u00e9e comme \u00e9liminant l\u2019emballement thermique ou rempla\u00e7ant le BMS, le PCS, la gestion thermique, les protections incendie ou la mise en service.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4656c999 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"4656c999\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Inclure ces param\u00e8tres de z\u00e9ro injection dans la demande de devis EPC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e8623e76 auto-p elementor-widget elementor-widget-heading\" data-id=\"e8623e76\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Envoyez le m\u00eame tableau des param\u00e8tres de commande \u00e0 chaque soumissionnaire. L\u2019exigence de z\u00e9ro injection devient ainsi un p\u00e9rim\u00e8tre comparable pour les \u00e9quipements, les logiciels et la mise en service. Les responsabilit\u00e9s non attribu\u00e9es apparaissent avant de faire l\u2019objet d\u2019un avenant.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-94e8aa41 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"94e8aa41\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">1\ufe0f\u20e3 <strong>D\u00e9finition du PCC :<\/strong> Emplacement sur le sch\u00e9ma unifilaire, niveau de tension, responsable du compteur et des transformateurs de courant, ainsi que toutes les sources et charges incluses dans le p\u00e9rim\u00e8tre.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">2\ufe0f\u20e3 <strong>Cible et tol\u00e9rance :<\/strong> Consigne de z\u00e9ro injection ou d\u2019injection limit\u00e9e, marge de soutirage, m\u00e9thode de calcul de la moyenne et limite transitoire autoris\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">3\ufe0f\u20e3 <strong>Sp\u00e9cification du compteur :<\/strong> Pr\u00e9cision, \u00e9chantillonnage, communications, synchronisation horaire, indicateurs de qualit\u00e9 et exigence de redondance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">4\ufe0f\u20e3 <strong>Hi\u00e9rarchie des actionneurs :<\/strong> Charge du BESS, r\u00e9duction de la d\u00e9charge du BESS, \u00e9cr\u00eatage du PV et s\u00e9quence des charges pilotables.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">5\ufe0f\u20e3 <strong>Limites de la batterie :<\/strong> Plage d\u2019\u00e9tat de charge (SOC), puissance disponible en charge et en d\u00e9charge, limites de temp\u00e9rature, interverrouillages li\u00e9s aux alarmes et conditions de fonctionnement couvertes par la garantie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">6\ufe0f\u20e3 <strong>Dynamique du contr\u00f4leur :<\/strong> Intervalle d\u2019\u00e9valuation, filtre, bande morte, rampe, d\u00e9lai d\u2019expiration des consignes et m\u00e9thode de pr\u00e9vention des oscillations.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">7\ufe0f\u20e3 <strong>Matrice de s\u00e9curit\u00e9 en cas de d\u00e9faut :<\/strong> Perte du compteur, perte du r\u00e9seau de communication, red\u00e9marrage du contr\u00f4leur, indisponibilit\u00e9 du BESS et indisponibilit\u00e9 de la commande photovolta\u00efque.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">8\ufe0f\u20e3 <strong>Autorit\u00e9 de d\u00e9rogation :<\/strong> R\u00f4les autoris\u00e9s \u00e0 modifier les cibles, modes ou limites, avec journalisation de l'utilisateur et de l'horodatage.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">9\ufe0f\u20e3 <strong>FAT et SAT :<\/strong> \u00c9v\u00e9nements d'essai, conditions initiales, r\u00e9ponse attendue, tol\u00e9rance, canaux de donn\u00e9es, t\u00e9moins et responsabilit\u00e9 de nouvel essai.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd1f <strong>Dossier de remise :<\/strong> Description fonctionnelle de la commande, sch\u00e9ma unifilaire, tableau des r\u00e9glages, table des registres, matrice d\u2019alarmes, fichiers de courbes et formation des op\u00e9rateurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8941fed9 auto-p elementor-widget elementor-widget-heading\" data-id=\"8941fed9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/afrique-du-sud-citations-erronees-de-bess\/\" target=\"_blank\" style=\"color:#61ce70\">guide des lacunes de donn\u00e9es pour un devis BESS en Afrique du Sud<\/a><\/strong> pour pr\u00e9parer le dossier de projet \u00e9largi, et le <strong><a href=\"https:\/\/www.solidess.com\/fr\/etre-agree-en-tant-que-fournisseur-de-systemes-de-stockage-denergie-par-batterie-a-usage-commercial\/\" target=\"_blank\" style=\"color:#61ce70\">cadre de qualification des fournisseurs de BESS commerciaux<\/a><\/strong> pour attribuer les responsabilit\u00e9s d\u2019int\u00e9gration et d\u2019essai. Si une armoire de 100 kW \/ 215 kWh peut r\u00e9pondre au besoin, poursuivez avec le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-selectionner-un-systeme-de-stockage-denergie-par-batterie-bess-exterieur-de-100-kw-215-kwh-pour-un-site-commercial-et-industriel-ci\/\" target=\"_blank\" style=\"color:#61ce70\">guide de s\u00e9lection ESSA0100B-0215<\/a><\/strong> sans pr\u00e9sumer que son \u00e9nergie nominale correspond \u00e0 l\u2019\u00e9nergie utilisable fournie c\u00f4t\u00e9 courant alternatif dans le cadre du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ba4911c8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ba4911c8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Ce qu'il faut envoyer \u00e0 MegSolid pour un examen z\u00e9ro export<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32bb0b99 auto-p elementor-widget elementor-widget-heading\" data-id=\"32bb0b99\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une demande exploitable doit pr\u00e9ciser les p\u00e9rim\u00e8tres \u00e9lectrique et de commande ainsi que l\u2019\u00e9nergie de la batterie en kWh. MegSolid peut alors proposer une architecture pr\u00e9liminaire, recenser les donn\u00e9es manquantes et distinguer les fonctions standard des \u00e9quipements de l\u2019\u00e9tude EMS propre au projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17d22caf elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"17d22caf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc4 <strong>Documents \u00e9lectriques :<\/strong> SLD actuel, puissance du transformateur, disposition du tableau de distribution, PCC et emplacement propos\u00e9 des TC.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcca <strong>Donn\u00e9es d'intervalle :<\/strong> Charge du site et production PV \u00e0 la meilleure r\u00e9solution disponible, y compris les principaux \u00e9v\u00e9nements de commutation de charge.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2600\ufe0f <strong>P\u00e9rim\u00e8tre solaire :<\/strong> Mod\u00e8les d'onduleurs PV, contr\u00f4leur de centrale, interface d'\u00e9cr\u00eatage et production maximale disponible.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Fonction BESS :<\/strong> kW et kWh requis, r\u00e9serve de SOC, source de charge, obligations d'\u00e9cr\u00eatage des pointes ou de secours et \u00e9chelle de produit pr\u00e9f\u00e9r\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfaf <strong>R\u00e8gle du r\u00e9seau :<\/strong> Plafond d'export approuv\u00e9, libell\u00e9 du gestionnaire de r\u00e9seau, preuves requises et date de mise en service vis\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd17 <strong>P\u00e9rim\u00e8tre des contr\u00f4les :<\/strong> EMS\/SCADA existant, protocoles pris en charge, propri\u00e9t\u00e9 du r\u00e9seau, politique d'acc\u00e8s \u00e0 distance et destination des alarmes.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>P\u00e9rim\u00e8tre de r\u00e9ception :<\/strong> T\u00e9moins FAT\/SAT, canaux requis, tol\u00e9rance, format du rapport et partie responsable.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a537e65 auto-p elementor-widget elementor-widget-heading\" data-id=\"a537e65\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">\ud83d\udc49 Vous recherchez des onduleurs int\u00e9grant une commande z\u00e9ro injection ? D\u00e9couvrez les <strong><a href=\"https:\/\/www.solidess.com\/fr\/piles\/onduleur-de-stockage-denergie\/\" target=\"_blank\" style=\"color:#61CE70\">PCS et onduleurs hybrides SolidESS de 3 \u00e0 500 kW<\/a><\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-77b47ebb elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"77b47ebb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">\u00c9crivez \u00e0 MegSolid pour un examen du z\u00e9ro injection<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32ae7d7c auto-p elementor-widget elementor-widget-heading\" data-id=\"32ae7d7c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Cet article fournit un cadre de r\u00e9f\u00e9rence pour sp\u00e9cifier le z\u00e9ro injection. Pour recevoir la description fonctionnelle compl\u00e8te de la commande au PCC au format Excel, avec les champs modifiables sur le p\u00e9rim\u00e8tre de comptage, la priorit\u00e9 des actionneurs, les \u00e9tats en cas de perte de communication, les essais FAT\/SAT et les responsabilit\u00e9s \u00e0 pr\u00e9ciser dans la demande de devis, \u00e9crivez \u00e0 <strong>sfhq2008@gmail.com<\/strong>. Indiquez le pays du projet, le sch\u00e9ma unifilaire, l\u2019emplacement du PCC, les donn\u00e9es de charge et de production photovolta\u00efque, les exigences d\u2019injection, la puissance et l\u2019\u00e9nergie requises du BESS et le calendrier de livraison.<\/p>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-27830a71 auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"27830a71\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f34ef6fb elementor-widget elementor-widget-heading\" data-id=\"f34ef6fb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e649c8c7 e-con-full e-flex e-con e-child\" data-id=\"e649c8c7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8a627416 elementor-widget elementor-widget-n-accordion\" data-id=\"8a627416\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2320\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2320\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que doit d\u00e9finir une exigence z\u00e9ro export BESS dans le contrat ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2320\" class=\"elementor-element elementor-element-87adf466 e-con-full e-flex e-con e-child\" data-id=\"87adf466\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2320\" class=\"elementor-element elementor-element-f988c493 e-con-full e-flex e-con e-child\" data-id=\"f988c493\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4bf128c9 elementor-widget elementor-widget-heading\" data-id=\"4bf128c9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Elle doit d\u00e9finir le point de r\u00e9f\u00e9rence au PCC, la convention de signe de la puissance, la consigne, la marge de soutirage ou la tol\u00e9rance, la limite transitoire autoris\u00e9e, les \u00e9quipements pilot\u00e9s, la qualit\u00e9 des mesures, le mode de r\u00e9ponse, l\u2019\u00e9tat de repli s\u00fbr et les justificatifs FAT\/SAT.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2321\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2321\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> O\u00f9 installer le compteur ou les TC z\u00e9ro export ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2321\" class=\"elementor-element elementor-element-054819f4 e-con-full e-flex e-con e-child\" data-id=\"054819f4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2321\" class=\"elementor-element elementor-element-d442e9fa e-con-full e-flex e-con e-child\" data-id=\"d442e9fa\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7be2859d elementor-widget elementor-widget-heading\" data-id=\"7be2859d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ils devraient mesurer la puissance nette au PCC contractuel en englobant chaque charge, onduleur photovolta\u00efque et d\u00e9part BESS pertinent. Le sch\u00e9ma unifilaire approuv\u00e9 doit indiquer le rapport des transformateurs de courant, leur polarit\u00e9, la correspondance des phases et le responsable du compteur.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2322\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2322\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> L'EMS doit-il charger le BESS ou \u00e9cr\u00eater le PV en premier ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2322\" class=\"elementor-element elementor-element-7bb7ccb5 e-con-full e-flex e-con e-child\" data-id=\"7bb7ccb5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2322\" class=\"elementor-element elementor-element-f346cf17 e-con-full e-flex e-con e-child\" data-id=\"f346cf17\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8f158493 elementor-widget elementor-widget-heading\" data-id=\"8f158493\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L\u2019ordre des actionneurs doit \u00eatre approuv\u00e9 pour le projet. La charge peut valoriser la production photovolta\u00efque si la marge disponible de la batterie et les limites de garantie le permettent. Il faut limiter la production photovolta\u00efque si la batterie ne peut pas absorber assez de puissance ou si sa liaison de commande est indisponible.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2323\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2323\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelle marge de soutirage faut-il pr\u00e9voir pour une commande z\u00e9ro injection ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2323\" class=\"elementor-element elementor-element-6d3aae6d e-con-full e-flex e-con e-child\" data-id=\"6d3aae6d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2323\" class=\"elementor-element elementor-element-70ea19b2 e-con-full e-flex e-con e-child\" data-id=\"70ea19b2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-24c3819c elementor-widget elementor-widget-heading\" data-id=\"24c3819c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il n\u2019existe pas de valeur universelle. Le r\u00e9glage d\u00e9pend de l\u2019exigence du gestionnaire de r\u00e9seau, de la pr\u00e9cision du compteur, de la variabilit\u00e9 de la charge du site, de la dynamique du contr\u00f4leur et de l\u2019incidence commerciale. Consignez la valeur et la m\u00e9thode convenues dans le tableau des r\u00e9glages.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2324\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2324\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que se passe-t-il lorsque la batterie est pleine pendant une forte production solaire ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2324\" class=\"elementor-element elementor-element-635d0956 e-con-full e-flex e-con e-child\" data-id=\"635d0956\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2324\" class=\"elementor-element elementor-element-1dceb9a1 e-con-full e-flex e-con e-child\" data-id=\"1dceb9a1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-36099ad5 elementor-widget elementor-widget-heading\" data-id=\"36099ad5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'EMS doit reconna\u00eetre la limite de charge disponible du BMS et passer \u00e0 l'alternative approuv\u00e9e, en g\u00e9n\u00e9ral en r\u00e9duisant la d\u00e9charge de la batterie si elle est active, en \u00e9cr\u00eatant le PV ou en pilotant une autre charge contractuelle. L'exigence au PCC reste en vigueur.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2325\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2325\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que doit-il se passer si la communication du compteur PCC est perdue ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2325\" class=\"elementor-element elementor-element-b938e957 e-con-full e-flex e-con e-child\" data-id=\"b938e957\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2325\" class=\"elementor-element elementor-element-1545b644 e-con-full e-flex e-con e-child\" data-id=\"1545b644\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-aea71875 elementor-widget elementor-widget-heading\" data-id=\"aea71875\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le contr\u00f4leur devrait rejeter les donn\u00e9es p\u00e9rim\u00e9es, signaler la d\u00e9faillance par une alarme et passer dans l\u2019\u00e9tat de repli s\u00fbr sans injection approuv\u00e9 pour le projet. La demande de devis doit pr\u00e9ciser les d\u00e9lais d\u2019expiration, le comportement local du photovolta\u00efque et du BESS, la notification \u00e0 l\u2019op\u00e9rateur et la reprise contr\u00f4l\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2326\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2326\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Le contr\u00f4le z\u00e9ro export peut-il fonctionner avec une alimentation de secours ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2326\" class=\"elementor-element elementor-element-d7929aee e-con-full e-flex e-con e-child\" data-id=\"d7929aee\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2326\" class=\"elementor-element elementor-element-d4c1b104 e-con-full e-flex e-con e-child\" data-id=\"d4c1b104\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5762b9dd elementor-widget elementor-widget-heading\" data-id=\"5762b9dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui, mais la commande de l\u2019injection en mode raccord\u00e9 au r\u00e9seau et le secours en \u00eelotage correspondent \u00e0 deux \u00e9tats de fonctionnement diff\u00e9rents. La position des disjoncteurs, la logique de basculement, l\u2019attribution de la r\u00e9gulation de tension et de fr\u00e9quence en \u00eelotage et la s\u00e9quence de retour au r\u00e9seau doivent emp\u00eacher qu\u2019une boucle de commande inadapt\u00e9e reste active.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2327\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2327\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quels essais z\u00e9ro export rel\u00e8vent du FAT ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2327\" class=\"elementor-element elementor-element-c0d52715 e-con-full e-flex e-con e-child\" data-id=\"c0d52715\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2327\" class=\"elementor-element elementor-element-d5ec6126 e-con-full e-flex e-con e-child\" data-id=\"d5ec6126\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0ba85f85 elementor-widget elementor-widget-heading\" data-id=\"0ba85f85\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les essais FAT devraient v\u00e9rifier le sens de comptage, les \u00e9chelons de charge et de production photovolta\u00efque, les limites des actionneurs, les \u00e9tats de charge haut et bas, chaque perte de communication, le red\u00e9marrage du contr\u00f4leur, la journalisation des alarmes et la reprise, en se r\u00e9f\u00e9rant \u00e0 la description fonctionnelle de la commande approuv\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2328\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2328\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelles donn\u00e9es un rapport SAT z\u00e9ro export doit-il inclure ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2328\" class=\"elementor-element elementor-element-cdd4cd92 e-con-full e-flex e-con e-child\" data-id=\"cdd4cd92\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2328\" class=\"elementor-element elementor-element-52965a69 e-con-full e-flex e-con e-child\" data-id=\"52965a69\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8c5e1d33 elementor-widget elementor-widget-heading\" data-id=\"8c5e1d33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Inclure la puissance PCC synchronis\u00e9e, la charge, la puissance PV, la puissance de la batterie, le SOC, les limites BMS\/PCS, la cible EMS, les commandes \u00e9mises, les r\u00e9ponses r\u00e9elles, les alarmes, les indicateurs de qualit\u00e9 des donn\u00e9es et les transitions d'\u00e9tat de fonctionnement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2329\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2329\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Une armoire MegSolid ESSA peut-elle \u00eatre sp\u00e9cifi\u00e9e pour le contr\u00f4le z\u00e9ro export ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2329\" class=\"elementor-element elementor-element-6f3c8d4e e-con-full e-flex e-con e-child\" data-id=\"6f3c8d4e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2329\" class=\"elementor-element elementor-element-846940ce e-con-full e-flex e-con e-child\" data-id=\"846940ce\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8a1beb89 elementor-widget elementor-widget-heading\" data-id=\"8a1beb89\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La documentation de la plateforme ESSA indique des fonctions EMS int\u00e9gr\u00e9es, des communications RS485\/TCP-IP et l\u2019acc\u00e8s \u00e0 la charge, \u00e0 la batterie, au r\u00e9seau, au groupe \u00e9lectrog\u00e8ne et au photovolta\u00efque. Le compteur r\u00e9ellement utilis\u00e9 pour le z\u00e9ro injection, la logique, la r\u00e9ponse, la table des registres et les limites de r\u00e9ception restent propres au projet et doivent \u00eatre confirm\u00e9s dans les documents de la commande.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-23210\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-23210\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Qu'est-ce que le contr\u00f4le \u00ab z\u00e9ro exportation \u00bb du BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23210\" class=\"elementor-element elementor-element-f03fe875 e-con-full e-flex e-con e-child\" data-id=\"f03fe875\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23210\" class=\"elementor-element elementor-element-51ab0c3b e-con-full e-flex e-con e-child\" data-id=\"51ab0c3b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-73eb1899 elementor-widget elementor-widget-heading\" data-id=\"73eb1899\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La commande z\u00e9ro injection d\u2019un BESS est une fonction en boucle ferm\u00e9e qui mesure la puissance active nette \u00e0 un point de r\u00e9f\u00e9rence du r\u00e9seau approuv\u00e9 et coordonne la batterie, le photovolta\u00efque ou d\u2019autres \u00e9quipements pilotables pour emp\u00eacher l\u2019injection volontaire.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-23211\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-23211\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> En quoi la combinaison de l'\u00e9nergie solaire et du stockage par batterie emp\u00eache-t-elle l'exportation d'\u00e9lectricit\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23211\" class=\"elementor-element elementor-element-7839abd5 e-con-full e-flex e-con e-child\" data-id=\"7839abd5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23211\" class=\"elementor-element elementor-element-b016b290 e-con-full e-flex e-con e-child\" data-id=\"b016b290\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-070a62d9 elementor-widget elementor-widget-heading\" data-id=\"070a62d9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un compteur PCC transmet la puissance nette au syst\u00e8me de gestion de l'\u00e9nergie (EMS). L'EMS compare cette valeur \u00e0 la valeur cible approuv\u00e9e, applique les limites fix\u00e9es pour les batteries et les \u00e9quipements, puis ordonne la charge du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS), la r\u00e9duction de la d\u00e9charge ou la limitation de la production photovolta\u00efque, et v\u00e9rifie la r\u00e9ponse mesur\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-23212\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-23212\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Que doit envoyer un acheteur \u00e0 MegSolid pour obtenir une offre concernant un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) sans exportation ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23212\" class=\"elementor-element elementor-element-f9d9db97 e-con-full e-flex e-con e-child\" data-id=\"f9d9db97\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-23212\" class=\"elementor-element elementor-element-122efde0 e-con-full e-flex e-con e-child\" data-id=\"122efde0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-48ff2570 elementor-widget elementor-widget-heading\" data-id=\"48ff2570\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Transmettez le sch\u00e9ma unifilaire, l\u2019emplacement du PCC et des transformateurs de courant, les donn\u00e9es de charge et de production photovolta\u00efque par intervalle, les informations sur les onduleurs, l\u2019exigence d\u2019injection, la puissance et l\u2019\u00e9nergie du BESS requises en kW et en kWh, la tension du r\u00e9seau, les interfaces de commande, les exigences FAT\/SAT et le calendrier du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Pr\u00e9ciser les mesures de contr\u00f4le visant \u00e0 emp\u00eacher toute exportation d'\u00e9nergie du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) au point de connexion au r\u00e9seau (PCC), avec un comptage pr\u00e9cis, la priorit\u00e9 des actionneurs, une logique de s\u00e9curit\u00e9 int\u00e9gr\u00e9e, ainsi que les crit\u00e8res d'acceptation pour les tests FAT et SAT dans le cadre de projets solaires + stockage de type C&amp;I.<\/p>","protected":false},"author":4,"featured_media":4492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[1,714],"tags":[222,224,218,225,219,31,226,221,223,220],"class_list":["post-4495","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-ci-battery-storage-solutions","tag-anti-export-control","tag-bess-commissioning","tag-bess-ems","tag-bess-fat-sat","tag-bess-zero-export-control","tag-ci-energy-storage","tag-megsolid-essa","tag-pcc-meter","tag-solar-battery-storage","tag-solar-bess-zero-export"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=4495"}],"version-history":[{"count":34,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4495\/revisions"}],"predecessor-version":[{"id":8646,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4495\/revisions\/8646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/4492"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=4495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=4495"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=4495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}