{"id":4604,"date":"2026-08-06T16:19:05","date_gmt":"2026-08-06T08:19:05","guid":{"rendered":"https:\/\/www.solidess.com\/?p=4604"},"modified":"2026-11-09T16:46:57","modified_gmt":"2026-11-09T08:46:57","slug":"connexion-de-batterie-400-v-au-tableau-electrique-existant","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/400-v-bess-connection-existing-switchboard\/","title":{"rendered":"Comment raccorder un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) C&amp;I \u00e0 un tableau \u00e9lectrique existant de 400 V"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"4604\" class=\"elementor elementor-4604\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d6089539 auto-p elementor-widget elementor-widget-heading\" data-id=\"d6089539\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default translation-block\">Le <strong>raccordement d\u2019un BESS \u00e0 400 V<\/strong> devrait commencer par l\u2019examen du tableau \u00e9lectrique existant, plut\u00f4t que par un devis d\u2019armoire de batteries. L\u2019acheteur doit d\u00e9montrer que le tableau peut supporter un courant bidirectionnel, interrompre le courant de d\u00e9faut disponible, maintenir la s\u00e9lectivit\u00e9 des protections et prendre en charge le mode de fonctionnement requis. Ce guide explique aux propri\u00e9taires de sites, aux bureaux d\u2019\u00e9tudes et aux \u00e9quipes EPC comment utiliser les donn\u00e9es du site pour pr\u00e9parer un sch\u00e9ma unifilaire (SLD) et une demande de devis suffisamment complets pour prendre une d\u00e9cision.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2695c68f auto-image elementor-widget elementor-widget-image\" data-id=\"2695c68f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4601\" alt=\"Un ing\u00e9nieur \u00e9lectricien v\u00e9rifie un tableau \u00e9lectrique existant de 400 V avant de raccorder un syst\u00e8me de stockage d&#039;\u00e9nergie MegSolid C&amp;I BESS\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard.png 1000w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard-300x300.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard-150x150.png 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard-768x768.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard-600x600.png 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/How-to-Connect-a-CI-BESS-to-an-Existing-400-V-Switchboard-100x100.png 100w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-568fdd27 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"568fdd27\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a1 <strong>Chemin du courant :<\/strong> Confirmez le calibre des jeux de barres, le calibre des d\u00e9parts de r\u00e9serve, le cheminement des c\u00e2bles et la marge thermique dans les deux sens, charge et d\u00e9charge.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udee1\ufe0f <strong>Chemin du d\u00e9faut :<\/strong> V\u00e9rifiez le courant de d\u00e9faut pr\u00e9sum\u00e9, le pouvoir de coupure du disjoncteur et l\u2019apport suppl\u00e9mentaire du PCS au courant de d\u00e9faut.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd04 <strong>Mode d'exploitation :<\/strong> S\u00e9parez l'\u00e9cr\u00eatage de pointe raccord\u00e9 au r\u00e9seau du secours de charges s\u00e9lectionn\u00e9es ou de l'\u00eelotage du site entier.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf10 <strong>Fronti\u00e8re de commande :<\/strong> Placez le compteur de facturation ou de commande et les transformateurs de courant (TC) l\u00e0 o\u00f9 les mesures transmises \u00e0 l\u2019EMS englobent toutes les sources et charges pertinentes.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcd0 <strong>Fronti\u00e8re documentaire :<\/strong> \u00c9mettez avant l'achat un SLD approuv\u00e9, un concept de protection, une matrice de responsabilit\u00e9s et un p\u00e9rim\u00e8tre d'essais de r\u00e9ception.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17f3c69b elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"17f3c69b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Demander une revue de tableau 400V<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3089d62 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d3089d62\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">V\u00e9rifications \u00e0 effectuer avant de raccorder un BESS \u00e0 400 V<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c2d7e7b0 auto-p elementor-widget elementor-widget-heading\" data-id=\"c2d7e7b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un PCS de tension nominale 400 V peut convenir au site, mais la tension seule ne prouve pas la compatibilit\u00e9. Confirmez la fr\u00e9quence, la configuration des phases et du neutre, la plage de tension admissible, la m\u00e9thode d\u2019isolement, le r\u00e9gime de mise \u00e0 la terre, les fonctions de protection et le mode de fonctionnement. MegSolid publie plusieurs interfaces \u00e0 400 V, mais chaque gamme r\u00e9pond \u00e0 un p\u00e9rim\u00e8tre diff\u00e9rent de puissance, d\u2019\u00e9nergie et d\u2019int\u00e9gration. Commencez l\u2019\u00e9tude du convertisseur par les <a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-conversion-denergie-megsolid\/\">sp\u00e9cifications des PCS de la s\u00e9rie MEGA<\/a>, puis reportez les limites d\u2019interface du mod\u00e8le choisi dans le sch\u00e9ma unifilaire (SLD) du tableau existant.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-529ff4af auto-table elementor-widget elementor-widget-text-editor\" data-id=\"529ff4af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Plateforme MegSolid<\/th><th>Interface CA v\u00e9rifi\u00e9e dans les donn\u00e9es publiques<\/th><th>\u00c0 utiliser uniquement comme pr\u00e9s\u00e9lection initiale<\/th><\/tr><\/thead><tbody><tr><td>armoire ext\u00e9rieure ESSA<\/td><td>400V ; 320\u2013460 V ; 3W + N + PE ; 30\u2013100 kW et 55,296\u2013215,04 kWh<\/td><td>Transformateur d\u2019isolement int\u00e9gr\u00e9 et refroidissement par air intelligent. Toute option de cellules \u00e0 \u00e9lectrolyte solide propre au projet doit figurer dans le devis et la nomenclature (BOM).<\/td><\/tr><tr><td>Meg-Solid Energon 261,24 kWh<\/td><td>480 V \/ 400V \u00b115 % ; 125 kVA<\/td><td>LFP 314 Ah et refroidissement liquide ; la page publique n'identifie pas ce mod\u00e8le comme hybride \u00e0 \u00e9lectrolyte solide<\/td><\/tr><tr><td>MEGA TS PCS<\/td><td>400 V ; 320\u2013460 V ; 3W + N + PE ; 30\u2013500 kW<\/td><td>Les rapports des transformateurs d'isolement int\u00e9gr\u00e9s varient selon le mod\u00e8le ; la batterie, l'appareillage et le p\u00e9rim\u00e8tre syst\u00e8me restent propres au projet<\/td><\/tr><tr><td>PCS modulaires PMA<\/td><td>400V \u00b115 % ; 80, 105 ou 125 kW ; sortie hors r\u00e9seau 230\/400V<\/td><td>PCS au niveau module ; transformateur et int\u00e9gration du syst\u00e8me complet propres au projet<\/td><\/tr><tr><td>Syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) en conteneur ESSC<\/td><td>400 V ; 320\u2013460 V ; 3W + N + PE ; 500 ou 1 000 kW<\/td><td>1,0752 ou 2,1504 MWh. Batterie LFP avec refroidissement intelligent par air \u00e0 r\u00e9gulation de temp\u00e9rature.<\/td><\/tr><tr><td>5000INTL<\/td><td>690 V ; 2,7 MW et 5,0159 MWh<\/td><td>Ne pr\u00e9sumez pas d\u2019un raccordement direct \u00e0 400 V. Une interface de tension et une architecture de site con\u00e7ues pour le projet sont n\u00e9cessaires.<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f0290abe auto-p elementor-widget elementor-widget-heading\" data-id=\"f0290abe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-selectionner-un-systeme-de-stockage-denergie-par-batterie-bess-exterieur-de-100-kw-215-kwh-pour-un-site-commercial-et-industriel-ci\/\" target=\"_blank\" style=\"color:#61ce70\">Guide de s\u00e9lection d'un syst\u00e8me de stockage d'\u00e9nergie (BESS) ext\u00e9rieur de 100 kW \/ 215 kWh<\/a><\/strong> pour distinguer puissance et \u00e9nergie, et le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-des-rfq-pour-le-systeme-de-stockage-denergie-refroidi-par-liquide-de-261-kwh\/\" target=\"_blank\" style=\"color:#61ce70\">guide de demande de devis pour le syst\u00e8me de 261 kWh \u00e0 refroidissement liquide<\/a><\/strong> si cette cat\u00e9gorie d\u2019armoire correspond aux besoins de fonctionnement. Pour \u00e9valuer le p\u00e9rim\u00e8tre d\u2019un PCS modulaire, consultez \u00e9galement le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dachat-donduleurs-de-stockage-denergie\/\" target=\"_blank\" style=\"color:#61ce70\">guide d'achat d'onduleur de stockage d'\u00e9nergie de 105 kW<\/a><\/strong>. Aucune de ces pages ne remplace l'\u00e9tude du tableau.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b54ad314 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"b54ad314\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">D\u00e9finir le mode d'exploitation avant de tracer le d\u00e9part<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-051b0ef8 auto-p elementor-widget elementor-widget-heading\" data-id=\"051b0ef8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La m\u00eame puissance de BESS peut donner des conceptions de tableau tr\u00e8s diff\u00e9rentes. Un d\u00e9part parall\u00e8le utilis\u00e9 pour l'\u00e9cr\u00eatage de pointe reste normalement raccord\u00e9 au r\u00e9seau. Un service de secours peut exiger un jeu de barres de charges essentielles s\u00e9par\u00e9, un dispositif de transfert et une logique explicite de s\u00e9paration des sources. L'\u00eelotage du site entier ajoute le d\u00e9lestage, la coordination avec le groupe \u00e9lectrog\u00e8ne, la r\u00e9gulation de fr\u00e9quence et de tension, et la s\u00e9quence de r\u00e9tablissement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f7462e3d auto-table elementor-widget elementor-widget-text-editor\" data-id=\"f7462e3d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>R\u00e9sultat attendu<\/th><th>Implication pour le raccordement<\/th><th>Question \u00e0 laquelle la demande de devis doit r\u00e9pondre<\/th><\/tr><\/thead><tbody><tr><td>\u00c9cr\u00eatement des pointes ou report de la consommation vers des p\u00e9riodes tarifaires plus favorables<\/td><td>D\u00e9part bidirectionnel sur le jeu de barres 400 V sous tension<\/td><td>Quelle limite de charge et de d\u00e9charge le transformateur, le tableau et la fronti\u00e8re tarifaire peuvent-ils accepter ?<\/td><\/tr><tr><td>Z\u00e9ro injection<\/td><td>Le compteur au PCC ou les transformateurs de courant doivent fermer la boucle de commande de l\u2019EMS<\/td><td>Quel dispositif mesure la puissance nette, quel dispositif agit, et quel est l'\u00e9tat de repli s\u00fbr ?<\/td><\/tr><tr><td>Secours de charges s\u00e9lectionn\u00e9es<\/td><td>Les charges essentielles n\u00e9cessitent un jeu de barres de secours et un p\u00e9rim\u00e8tre de basculement d\u00e9finis<\/td><td>Quelles charges restent aliment\u00e9es, pendant combien de temps, et comment emp\u00eache-t-on les sources de fonctionner en parall\u00e8le de fa\u00e7on dangereuse ?<\/td><\/tr><tr><td>Micror\u00e9seau en \u00eelotage<\/td><td>Les responsabilit\u00e9s d\u2019\u00e9tablissement de la tension et de la fr\u00e9quence du micror\u00e9seau, et de gestion des charges, doivent \u00eatre attribu\u00e9es<\/td><td>Qui est responsable du d\u00e9marrage autonome, de la synchronisation du groupe \u00e9lectrog\u00e8ne, du d\u00e9lestage et de la logique de retour au r\u00e9seau ?<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-31279660 auto-p elementor-widget elementor-widget-heading\" data-id=\"31279660\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour attribuer la responsabilit\u00e9 des signaux, suivez les recommandations de MegSolid sur <strong><a href=\"https:\/\/www.solidess.com\/fr\/architecture-de-communication-bms-ems-dans-un-bess\/\" target=\"_blank\" style=\"color:#61ce70\">l\u2019architecture de communication entre le BMS et l\u2019EMS<\/a><\/strong>. Si le flux de puissance inverse est limit\u00e9, le contrat doit d\u00e9finir la mesure au PCC, la priorit\u00e9 des actionneurs, l\u2019\u00e9tat de repli s\u00fbr et l\u2019essai de r\u00e9ception. Suivez les recommandations de MegSolid dans le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-specifier-un-controle-de-zero-injection-au-pcc-pour-un-systeme-de-stockage-denergie-par-batterie-bess\/\" target=\"_blank\" style=\"color:#61CE70\">cadre de commande z\u00e9ro injection du BESS au PCC<\/a><\/strong> pour d\u00e9finir ces exigences.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2e534b69 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"2e534b69\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Calculer le courant avant de r\u00e9server un d\u00e9part disponible<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b153f99e auto-p elementor-widget elementor-widget-heading\" data-id=\"b153f99e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour un calcul de pr\u00e9s\u00e9lection triphas\u00e9 \u00e9quilibr\u00e9, utilisez <strong>I = P \u00f7 (\u221a3 \u00d7 V<sub>LL<\/sub> \u00d7 PF)<\/strong>. \u00c0 titre d\u2019exemple, un transfert de 100 kW \u00e0 400 V et \u00e0 facteur de puissance unitaire correspond \u00e0 environ 144 A. Ce calcul ne s\u00e9lectionne ni le disjoncteur ni le c\u00e2ble. L\u2019ing\u00e9nieur doit encore tenir compte de la puissance apparente, des besoins en puissance r\u00e9active, des r\u00e8gles de charge en r\u00e9gime permanent, de la temp\u00e9rature ambiante, des conditions li\u00e9es \u00e0 l\u2019enveloppe, du regroupement, de la longueur des c\u00e2bles, des harmoniques, de la tenue aux d\u00e9fauts et des exigences locales.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-18ee8414 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"18ee8414\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcca <strong>Utilisez des donn\u00e9es de demande mesur\u00e9es :<\/strong> Fournissez des donn\u00e9es de charge par intervalles, et pas seulement la facture mensuelle du distributeur ou la plaque signal\u00e9tique du transformateur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2194\ufe0f <strong>V\u00e9rifiez les deux sens :<\/strong> Le soutirage maximal lors de la charge et l\u2019apport maximal lors de la d\u00e9charge peuvent solliciter des parties diff\u00e9rentes du tableau.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddee <strong>Gardez kW, kVA et kWh s\u00e9par\u00e9s :<\/strong> Le courant du d\u00e9part suit la puissance et le facteur de puissance ; l'autonomie de secours suit l'\u00e9nergie utilisable d\u00e9livr\u00e9e et le profil des charges critiques.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>Tenir compte des conditions du site :<\/strong> La temp\u00e9rature, l'altitude, la ventilation et le regroupement des c\u00e2bles peuvent r\u00e9duire la capacit\u00e9 disponible.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udea7 <strong>Ne consommez pas toute la capacit\u00e9 nominale :<\/strong> Les charges existantes, l'extension future et la configuration de maintenance doivent rester visibles dans le bilan de charges.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-869045ab auto-p elementor-widget elementor-widget-heading\" data-id=\"869045ab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Si le projet vise \u00e0 diff\u00e9rer l'extension \u00e9lectrique, comparez la charge mesur\u00e9e et la contrainte du transformateur avec la <strong><a href=\"https:\/\/www.solidess.com\/fr\/il-vaut-mieux-eviter-la-modernisation-du-transformateur\/\" target=\"_blank\" style=\"color:#61ce70\">m\u00e9thode d\u2019\u00e9valuation pr\u00e9liminaire d\u2019un renforcement du transformateur avec un BESS<\/a><\/strong>. Une batterie peut g\u00e9rer une pointe dont l\u2019ampleur varie dans le temps. Elle ne peut rem\u00e9dier \u00e0 une tenue ou \u00e0 un pouvoir de coupure insuffisants en cas de d\u00e9faut, \u00e0 un appareillage endommag\u00e9 ou \u00e0 une topologie de raccordement inadapt\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3f93344a auto-image elementor-widget elementor-widget-image\" data-id=\"3f93344a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4602\" alt=\"Contr\u00f4le de faisabilit\u00e9 en cinq points pour raccorder un BESS C&amp;I \u00e0 un tableau 400 V existant\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS.png 1200w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS-300x225.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS-1024x768.png 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS-768x576.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/400-V-Switchboard-Feasibility-Checklist-for-CI-BESS-600x450.png 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2faff981 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"2faff981\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">V\u00e9rifier les contraintes en cas de d\u00e9faut et la coordination des protections<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7b2837ba auto-p elementor-widget elementor-widget-heading\" data-id=\"7b2837ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L\u2019ajout d\u2019un PCS bidirectionnel modifie le r\u00e9seau vu par le tableau. L\u2019\u00e9tude doit v\u00e9rifier le courant de court-circuit pr\u00e9sum\u00e9 au point de raccordement propos\u00e9, la contribution du PCS au courant de d\u00e9faut et sa dur\u00e9e, les pouvoirs de fermeture et de coupure des disjoncteurs, la tenue de courte dur\u00e9e des jeux de barres, les fonctions des relais et la s\u00e9lectivit\u00e9 avec les appareils en amont et en aval. Le r\u00e9sultat doit couvrir tous les \u00e9tats plausibles en fonctionnement raccord\u00e9 au r\u00e9seau, en secours et en maintenance.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1ac7e8dd elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"1ac7e8dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddef <strong>Isolement d\u00e9di\u00e9 :<\/strong> Indiquez un moyen d'isolement verrouillable et identifiez qui peut le man\u0153uvrer.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u23f1\ufe0f <strong>D\u00e9clenchement s\u00e9lectif :<\/strong> Un d\u00e9faut sur le d\u00e9part BESS ne doit pas couper inutilement les charges de production saines, tandis qu'un d\u00e9faut sur le jeu de barres principal doit \u00eatre \u00e9limin\u00e9 en toute s\u00e9curit\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0d <strong>Donn\u00e9es d'entr\u00e9e de protection :<\/strong> Consignez les rapports de CT, les r\u00e9glages des relais, les d\u00e9clencheurs des disjoncteurs, l'imp\u00e9dance du transformateur et les donn\u00e9es r\u00e9elles de d\u00e9faut du distributeur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd01 <strong>R\u00e9glages d\u00e9pendant du mode :<\/strong> Confirmez si les groupes de r\u00e9glages des protections ou leur logique changent entre le fonctionnement raccord\u00e9 au r\u00e9seau et le fonctionnement en \u00eelotage.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>Preuve d'acceptation :<\/strong> Incluez les essais d\u2019injection, la v\u00e9rification des cha\u00eenes de d\u00e9clenchement, le contr\u00f4le de l\u2019\u00e9tat des disjoncteurs et les relev\u00e9s de r\u00e9glages sign\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7119e917 auto-p elementor-widget elementor-widget-heading\" data-id=\"7119e917\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default translation-block\">Le <strong><a href=\"https:\/\/search.abb.com\/library\/Download.aspx?DocumentID=9AKK107992A4519&amp;DocumentPartId=\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">sch\u00e9ma de r\u00e9f\u00e9rence pour un BESS basse tension<\/a><\/strong> d\u2019ABB montre que l\u2019appareillage et les protections doivent \u00eatre adapt\u00e9s \u00e0 l\u2019architecture retenue. Le d\u00e9partement de l\u2019\u00c9nergie des \u00c9tats-Unis propose \u00e9galement une <strong><a href=\"https:\/\/www.energy.gov\/sites\/default\/files\/2025-02\/battery-energy-storage-system-procurement-checklist-feb-2023.docx\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">liste de contr\u00f4le pour l\u2019achat d\u2019un BESS<\/a><\/strong> pour les premi\u00e8res questions du projet. Appliquez les normes, les r\u00e8gles du gestionnaire du r\u00e9seau et les exigences de l\u2019ing\u00e9nieur habilit\u00e9 qui s\u2019appliquent au site r\u00e9el.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a79d633d auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a79d633d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Confirmer le neutre, la mise \u00e0 la terre et la topologie de secours<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9c351160 auto-p elementor-widget elementor-widget-heading\" data-id=\"9c351160\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une tension de 400 V n\u2019indique pas si le site utilise une distribution \u00e0 trois ou \u00e0 quatre conducteurs, o\u00f9 est \u00e9tabli le neutre ni comment le conducteur de protection et le neutre sont reli\u00e9s. Ces d\u00e9tails deviennent d\u00e9terminants lorsqu\u2019un syst\u00e8me peut alimenter les charges en l\u2019absence du r\u00e9seau du distributeur. Le sch\u00e9ma unifilaire (SLD) approuv\u00e9 doit montrer la disposition des enroulements du transformateur, le conducteur neutre, les points de mise \u00e0 la terre, la commutation des sources et la prise en charge des charges monophas\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-09137886 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"09137886\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0c <strong>Faites correspondre l'arrangement des conducteurs :<\/strong> Les donn\u00e9es publiques ESSA, MEGA TS et ESSC indiquent 3W + N + PE sur l'interface hors r\u00e9seau ou r\u00e9seau concern\u00e9e ; v\u00e9rifiez le mod\u00e8le command\u00e9 et la topologie du site.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u2696\ufe0f <strong>Mesurez le d\u00e9s\u00e9quilibre de phases :<\/strong> Les charges monophas\u00e9es de process et de bureaux peuvent d\u00e9terminer le courant de neutre et la performance de secours.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddf1 <strong>D\u00e9finissez l'isolement galvanique :<\/strong> Consignez si l'isolement est int\u00e9gr\u00e9, externe ou non requis par la conception approuv\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udeab <strong>Emp\u00eachez les mises en parall\u00e8le involontaires de sources :<\/strong> La logique de commutation du r\u00e9seau, du groupe \u00e9lectrog\u00e8ne et du BESS doit avoir un \u00e9tat s\u00fbr document\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcdd <strong>Approuvez l'\u00e9tude de mise \u00e0 la terre :<\/strong> L'EPC ou l'ing\u00e9nieur \u00e9lectricien d\u00e9sign\u00e9 doit v\u00e9rifier la conformit\u00e9 pour la juridiction du projet.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5dd87319 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"5dd87319\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Placer les CT et compteurs \u00e0 la v\u00e9ritable fronti\u00e8re de commande<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-41970013 auto-p elementor-widget elementor-widget-heading\" data-id=\"41970013\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L\u2019EMS ne peut pas piloter ce que son compteur ne mesure pas. Un transformateur de courant plac\u00e9 uniquement sur le nouveau d\u00e9part BESS mesure la puissance de la batterie, pas le soutirage ni l\u2019injection du site. Pour l\u2019\u00e9cr\u00eatement des pointes ou le z\u00e9ro injection, le compteur de r\u00e9f\u00e9rence doit se trouver au point de mesure contractuel et englober chaque charge et source pertinente de l\u2019installation. Le sch\u00e9ma unifilaire et la liste des entr\u00e9es et sorties devraient employer les m\u00eames noms d\u2019\u00e9quipement et la m\u00eame convention de signe.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-db974032 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"db974032\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccd <strong>Lieu :<\/strong> Rep\u00e9rez pr\u00e9cis\u00e9ment le PCC, l'arriv\u00e9e principale ou la contrainte interne que la boucle de commande doit r\u00e9guler.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u27a1\ufe0f <strong>Polarit\u00e9 et rep\u00e9rage des phases :<\/strong> V\u00e9rifiez le sens des transformateurs de courant, l\u2019ordre des phases et la convention qui d\u00e9finit le signe positif en charge ou en d\u00e9charge lors de la mise en service.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccf <strong>Plage de mesure :<\/strong> Choisissez le rapport, la pr\u00e9cision et la fr\u00e9quence de mise \u00e0 jour pour l'enveloppe d'exploitation bidirectionnelle attendue.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\udde0 <strong>Qualit\u00e9 du signal :<\/strong> D\u00e9finissez le d\u00e9lai au-del\u00e0 duquel les donn\u00e9es sont jug\u00e9es p\u00e9rim\u00e9es, les indicateurs de mauvaise qualit\u00e9 des donn\u00e9es, la synchronisation horaire et l\u2019\u00e9tat de repli du contr\u00f4leur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd10 <strong>Responsabilit\u00e9 :<\/strong> Indiquez si le compteur, la passerelle, le commutateur r\u00e9seau et le mappage SCADA sont fournis par MegSolid, l'EPC, le distributeur ou un autre int\u00e9grateur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1ae47d40 auto-image elementor-widget elementor-widget-image\" data-id=\"1ae47d40\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-4603\" alt=\"Protection CA du BESS, comptage EMS et fronti\u00e8re de raccordement des charges critiques au tableau principal 400 V\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board.jpg 1200w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/08\/BESS-Connection-Boundary-at-the-400-V-Main-Board-600x450.jpg 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7cb39d06 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7cb39d06\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Choisir le point de raccordement sur preuves, pas par commodit\u00e9<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f1ea91da auto-table elementor-widget elementor-widget-text-editor\" data-id=\"f1ea91da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Point de raccordement candidat<\/th><th>Quand il peut \u00eatre praticable<\/th><th>Ce qui peut le faire rejeter<\/th><\/tr><\/thead><tbody><tr><td>D\u00e9part de r\u00e9serve disponible sur le tableau principal existant<\/td><td>D\u00e9part petit ou mod\u00e9r\u00e9 avec espace, capacit\u00e9 de jeu de barres et protection v\u00e9rifi\u00e9s<\/td><td>Marge de capacit\u00e9 des jeux de barres, tenue aux d\u00e9fauts, place pour le disjoncteur, acc\u00e8s des c\u00e2bles ou s\u00e9lectivit\u00e9 insuffisants<\/td><\/tr><tr><td>Nouvelle section de tableau ou tableau coupl\u00e9 par jeu de barres<\/td><td>Le tableau existant peut supporter une extension mais n'a pas de compartiment de d\u00e9part adapt\u00e9<\/td><td>Calibre du coupleur, logique de sectionnement ou responsabilit\u00e9 des modifications non v\u00e9rifi\u00e9s<\/td><\/tr><tr><td>Tableau BESS d\u00e9di\u00e9 de 400 V pr\u00e8s du transformateur<\/td><td>Plusieurs d\u00e9parts BESS ou une s\u00e9paration claire entre \u00e9quipements neufs et anciens est requise<\/td><td>Limite du transformateur, contraintes sur l\u2019arriv\u00e9e, espace, cheminement des c\u00e2bles ou comptage au PCC restant \u00e0 r\u00e9soudre<\/td><\/tr><tr><td>Tension diff\u00e9rente ou raccordement en moyenne tension<\/td><td>Le niveau de puissance rend le courant basse tension et le nombre de c\u00e2bles irr\u00e9alistes<\/td><td>Exige un nouveau transformateur, un concept de protection, une \u00e9tude d'interconnexion et un p\u00e9rim\u00e8tre de projet diff\u00e9rent<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e41a7f41 auto-p elementor-widget elementor-widget-heading\" data-id=\"e41a7f41\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La d\u00e9cision de raccordement doit figurer dans le sch\u00e9ma unifilaire, et non dans un e-mail qui dit simplement \u00ab raccorder au TGBT \u00bb. Avant d\u2019autoriser la mise \u00e0 disposition des \u00e9quipements, alignez le p\u00e9rim\u00e8tre \u00e9lectrique sur <strong><a href=\"https:\/\/www.solidess.com\/fr\/ingenierie-des-onduleurs-pcs\/\" target=\"_blank\" style=\"color:#61ce70\">l\u2019architecture de conversion de puissance du PCS<\/a><\/strong> et v\u00e9rifiez les interfaces entre le PCS et la batterie \u00e0 l\u2019aide de la <strong><a href=\"https:\/\/www.solidess.com\/fr\/pourquoi-lintegration-du-pcs-et-du-bms-echoue\/\" target=\"_blank\" style=\"color:#61ce70\">Revue d'int\u00e9gration PCS et BMS<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-53eaac4a auto-h2 elementor-widget elementor-widget-heading\" data-id=\"53eaac4a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Envoyer ce dossier de donn\u00e9es avant de demander un devis<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b219e01d auto-p elementor-widget elementor-widget-heading\" data-id=\"b219e01d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un devis utile exige assez de preuves pour s\u00e9parer la fourniture MegSolid des responsabilit\u00e9s de l'EPC, du site et du distributeur. Marquez les valeurs inconnues \u00ab \u00e0 confirmer \u00bb plut\u00f4t que de demander aux fournisseurs de deviner. Le dossier minimal de demande doit contenir :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-013dad08 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"013dad08\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccd <strong>Identit\u00e9 du projet :<\/strong> Pays, ville, type de site, emplacement int\u00e9rieur ou ext\u00e9rieur, altitude, temp\u00e9rature et date de livraison demand\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfaf <strong>Fonctions op\u00e9rationnelles :<\/strong> \u00c9cr\u00eatage de pointe, secours, z\u00e9ro export, coordination du groupe \u00e9lectrog\u00e8ne ou fonctionnement en \u00eelotage ; classez les priorit\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u26a1 <strong>Exigence de puissance :<\/strong> kW ou kVA requis en charge et d\u00e9charge, facteur de puissance et tout service de d\u00e9marrage de moteurs ou de courte dur\u00e9e.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udd0b <strong>Besoins \u00e9nerg\u00e9tiques :<\/strong> \u00c9nergie \u00e0 d\u00e9livrer en kWh ou en MWh, dur\u00e9e de secours, politique de r\u00e9serve et \u00e9nergie requise en fin de vie du syst\u00e8me.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udcc8 <strong>Donn\u00e9es du site :<\/strong> Profil de charge par intervalles, demande maximale, planning des charges critiques et informations sur les gros \u00e9chelons de charge.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udfed <strong>Syst\u00e8me \u00e9lectrique existant :<\/strong> Puissance nominale et imp\u00e9dance du transformateur, donn\u00e9es de d\u00e9faut du gestionnaire du r\u00e9seau, sch\u00e9ma unifilaire conforme \u00e0 l\u2019installation, marque et mod\u00e8le du tableau, courant assign\u00e9 des jeux de barres, caract\u00e9ristiques des disjoncteurs et r\u00e9glages des protections.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf10 <strong>Commandes :<\/strong> Compteurs PCC et BESS, donn\u00e9es de CT, protocoles SCADA ou EMS, responsabilit\u00e9 des E\/S, politique r\u00e9seau et contraintes d'acc\u00e8s \u00e0 distance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddef <strong>Conformit\u00e9 :<\/strong> Normes requises, p\u00e9rim\u00e8tre des certificats, strat\u00e9gie de protection contre l\u2019incendie, autorisations des autorit\u00e9s et exigences relatives aux essais auxquels des t\u00e9moins doivent assister.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udce6 <strong>P\u00e9rim\u00e8tre commercial :<\/strong> Incoterm, p\u00e9rim\u00e8tre d'installation sur site, c\u00e2bles et appareillage, mise en service, formation, pi\u00e8ces de rechange et livrables de garantie.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3aa2e631 auto-p elementor-widget elementor-widget-heading\" data-id=\"3aa2e631\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid fournit des \u00e9quipements de stockage d\u2019\u00e9nergie, des onduleurs et des PCS dans le p\u00e9rim\u00e8tre de projet convenu. L\u2019offre ne comprend ni les modules solaires, ni leurs structures de montage, ni les travaux photovolta\u00efques locaux. Si une installation photovolta\u00efque existe ou est pr\u00e9vue, l\u2019acheteur devrait se fournir localement et transmettre les donn\u00e9es d\u2019interface. La qualification des fournisseurs peut ensuite suivre la <strong><a href=\"https:\/\/www.solidess.com\/fr\/etre-agree-en-tant-que-fournisseur-de-systemes-de-stockage-denergie-par-batterie-a-usage-commercial\/\" target=\"_blank\" style=\"color:#61ce70\">liste de contr\u00f4le pour la demande de devis aupr\u00e8s d\u2019un fournisseur de BESS commercial<\/a><\/strong>, en alignant les essais avant exp\u00e9dition sur le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dessai-de-reception-en-usine-de-bess\/\" target=\"_blank\" style=\"color:#61ce70\">Guide des essais de r\u00e9ception en usine BESS<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ea6a8d54 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ea6a8d54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Traiter la configuration \u00e0 \u00e9lectrolyte solide et la s\u00e9curit\u00e9 thermique comme deux d\u00e9cisions distinctes<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-446e2ac7 auto-p elementor-widget elementor-widget-heading\" data-id=\"446e2ac7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour les acheteurs recherchant du stockage d'\u00e9nergie \u00e0 \u00e9lectrolyte solide, la plateforme ext\u00e9rieure ESSA C&amp;I de MegSolid peut \u00eatre configur\u00e9e avec des cellules de batterie \u00e0 \u00e9lectrolyte solide selon les exigences propres au projet. Cette option doit figurer dans le devis, la fiche technique sign\u00e9e et la BOM ; elle ne doit pas \u00eatre suppos\u00e9e \u00e0 partir du nom de la gamme. La s\u00e9curit\u00e9 thermique est une question de syst\u00e8me complet impliquant la cellule, le BMS, le PCS, le refroidissement, l'enveloppe, la d\u00e9tection, l'extinction, les limites d'exploitation et la conception du site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-653eaf81 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"653eaf81\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddec <strong>Identifiez la cellule command\u00e9e :<\/strong> Demandez le mod\u00e8le, la chimie de la cathode, l'architecture de l'\u00e9lectrolyte et les preuves de configuration.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83c\udf21\ufe0f <strong>V\u00e9rifiez la gestion thermique :<\/strong> L'ESSA est indiqu\u00e9e avec refroidissement par air intelligent ; le syst\u00e8me de 261,24 kWh est refroidi par liquide ; n'intervertissez pas ces descriptions.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83e\uddea <strong>Demandez des preuves au niveau du mod\u00e8le :<\/strong> Confirmez le rapport d'essai exact, le p\u00e9rim\u00e8tre du certificat et la fronti\u00e8re du syst\u00e8me plut\u00f4t que de transf\u00e9rer des all\u00e9gations d'un produit \u00e0 l'autre.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udeab <strong>\u00c9vitez les affirmations cat\u00e9goriques :<\/strong> Ne dites d\u2019aucune batterie qu\u2019elle est \u00e0 l\u2019\u00e9preuve du feu, s\u00fbre \u00e0 100 % ou incapable d\u2019emballement thermique.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\ud83d\udccb <strong>Int\u00e9grez la s\u00e9curit\u00e9 \u00e0 la r\u00e9ception :<\/strong> Incluez les alarmes, la logique d'arr\u00eat, les interfaces de ventilation ou d'extinction, la r\u00e9ponse aux d\u00e9fauts et les dossiers de remise.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f921dc54 auto-p elementor-widget elementor-widget-heading\" data-id=\"f921dc54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez le <strong><a href=\"https:\/\/www.solidess.com\/fr\/emportement-thermique-dune-batterie-a-semi-conducteurs-12-points-a-verifier-avant-de-valider-un-bess\/\" target=\"_blank\" style=\"color:#61ce70\">guide des v\u00e9rifications d\u2019emballement thermique avant l\u2019approbation d\u2019une batterie \u00e0 \u00e9lectrolyte solide<\/a><\/strong> pour v\u00e9rifier les justificatifs sans reprendre d\u2019all\u00e9gations commerciales non \u00e9tay\u00e9es du type \u00ab aucun emballement thermique \u00bb.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-00fa5b40 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"00fa5b40\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Donn\u00e9es dont MegSolid a besoin pour examiner votre sch\u00e9ma unifilaire \u00e0 400 V<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3c97ed36 auto-p elementor-widget elementor-widget-heading\" data-id=\"3c97ed36\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Envoyez le sch\u00e9ma unifilaire \u00e0 jour conforme \u00e0 l\u2019installation, les fiches du transformateur et du tableau, les donn\u00e9es de charge, les modes de fonctionnement requis, le point de raccordement propos\u00e9 et le cr\u00e9neau de livraison \u00e0 <strong>sfhq2008@gmail.com<\/strong>. MegSolid peut alors pr\u00e9s\u00e9lectionner une gamme de produits \u00e0 400 V adapt\u00e9e, relever les interfaces non r\u00e9solues et transmettre les questions techniques n\u00e9cessaires \u00e0 une proposition propre au projet. La modification d\u00e9finitive du tableau, les r\u00e9glages de protection et les autorisations applicables restent soumis aux exigences de l\u2019EPC et de l\u2019ing\u00e9nieur \u00e9lectricien d\u00e9sign\u00e9s, ainsi qu\u2019\u00e0 celles de l\u2019autorit\u00e9 comp\u00e9tente.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5dd6913c elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"5dd6913c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Envoyez votre SLD \u00e0 MegSolid<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aad04df7 auto-p elementor-widget elementor-widget-heading\" data-id=\"aad04df7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Cet article fournit un cadre de r\u00e9f\u00e9rence pour le raccordement d\u2019un BESS \u00e0 400 V. Pour recevoir la liste de contr\u00f4le modifiable pour l\u2019examen du tableau et la fiche de collecte des donn\u00e9es pour le sch\u00e9ma unifilaire, \u00e9crivez \u00e0 <strong>sfhq2008@gmail.com<\/strong> avec le pays du projet, l'application, la puissance et l'\u00e9nergie de BESS requises, les donn\u00e9es du transformateur, le calibre du tableau et le mode d'exploitation pr\u00e9vu.<\/p>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-ae306836 auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"ae306836\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2d2fdfa1 elementor-widget elementor-widget-heading\" data-id=\"2d2fdfa1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-01ff9df8 e-con-full e-flex e-con e-child\" data-id=\"01ff9df8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a6701324 elementor-widget elementor-widget-n-accordion\" data-id=\"a6701324\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2790\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2790\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Un BESS \u00e0 400 V peut-il se raccorder directement \u00e0 un tableau existant de 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2790\" class=\"elementor-element elementor-element-4c25289f e-con-full e-flex e-con e-child\" data-id=\"4c25289f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2790\" class=\"elementor-element elementor-element-cba06418 e-con-full e-flex e-con e-child\" data-id=\"cba06418\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-64c5fc6a elementor-widget elementor-widget-heading\" data-id=\"64c5fc6a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une tension identique ne suffit pas. Avant le raccordement, l\u2019ing\u00e9nieur du projet doit v\u00e9rifier la capacit\u00e9 des jeux de barres et des d\u00e9parts, les contraintes en cas de d\u00e9faut, les caract\u00e9ristiques assign\u00e9es des disjoncteurs, la s\u00e9lectivit\u00e9 des protections, la topologie du neutre et de la mise \u00e0 la terre, le comptage, le mode de fonctionnement et les exigences d\u2019approbation locales.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2791\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2791\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quels documents dois-je envoyer avant de demander un devis pour un BESS \u00e0 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2791\" class=\"elementor-element elementor-element-10b7526c e-con-full e-flex e-con e-child\" data-id=\"10b7526c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2791\" class=\"elementor-element elementor-element-b293ecae e-con-full e-flex e-con e-child\" data-id=\"b293ecae\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-448f7dec elementor-widget elementor-widget-heading\" data-id=\"448f7dec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Transmettez le sch\u00e9ma unifilaire conforme \u00e0 l\u2019installation, le profil de charge par intervalle, la puissance nominale et l\u2019imp\u00e9dance du transformateur, les fiches du tableau et des disjoncteurs, les donn\u00e9es de d\u00e9faut disponibles, les r\u00e9glages des protections, la liste des charges critiques, les caract\u00e9ristiques des transformateurs de courant et des compteurs, les exigences relatives aux modes de fonctionnement, les conditions du site et le p\u00e9rim\u00e8tre de livraison.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2792\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2792\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Comment estime-t-on le courant d\u2019un BESS triphas\u00e9 \u00e0 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2792\" class=\"elementor-element elementor-element-9c00bece e-con-full e-flex e-con e-child\" data-id=\"9c00bece\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2792\" class=\"elementor-element elementor-element-3f4b6f95 e-con-full e-flex e-con e-child\" data-id=\"3f4b6f95\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0a827164 elementor-widget elementor-widget-heading\" data-id=\"0a827164\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour un calcul pr\u00e9liminaire en triphas\u00e9 \u00e9quilibr\u00e9, divisez la puissance P par le produit de la racine carr\u00e9e de trois, de la tension entre phases et du facteur de puissance. Vous obtenez le courant I. Pour choisir le disjoncteur et le c\u00e2ble, il faut encore tenir compte de la puissance apparente, du cycle de fonctionnement, des r\u00e9ductions de capacit\u00e9, des harmoniques, du cheminement des c\u00e2bles et des \u00e9tudes de d\u00e9faut.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2793\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2793\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Un BESS C&amp;I a-t-il besoin d'un disjoncteur CA d\u00e9di\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2793\" class=\"elementor-element elementor-element-947ad7df e-con-full e-flex e-con e-child\" data-id=\"947ad7df\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2793\" class=\"elementor-element elementor-element-4b3f19d4 e-con-full e-flex e-con e-child\" data-id=\"4b3f19d4\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6ccb18a5 elementor-widget elementor-widget-heading\" data-id=\"6ccb18a5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le BESS n\u00e9cessite normalement un moyen d'isolement d\u00e9fini et une protection d\u00e9di\u00e9e \u00e0 sa fronti\u00e8re de raccordement. L'ing\u00e9nieur d\u00e9sign\u00e9 doit choisir le disjoncteur et les fonctions de relais \u00e0 partir des \u00e9tudes de courant, de d\u00e9faut, de s\u00e9lectivit\u00e9 et de mode d'exploitation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2794\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2794\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Un d\u00e9part de disjoncteur inutilis\u00e9 du tableau principal peut-il servir au BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2794\" class=\"elementor-element elementor-element-f60d7ef3 e-con-full e-flex e-con e-child\" data-id=\"f60d7ef3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2794\" class=\"elementor-element elementor-element-0c3163b8 e-con-full e-flex e-con e-child\" data-id=\"0c3163b8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c2b0f2c6 elementor-widget elementor-widget-heading\" data-id=\"c2b0f2c6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">N\u2019utilisez ce d\u00e9part qu\u2019apr\u00e8s avoir v\u00e9rifi\u00e9 son compartiment, son jeu de barres, son disjoncteur, le raccordement des c\u00e2bles, la capacit\u00e9 thermique, la tenue aux d\u00e9fauts et la coordination des protections. La place disponible \u00e0 elle seule ne prouve pas que ce d\u00e9part est adapt\u00e9 au fonctionnement bidirectionnel du BESS.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2795\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2795\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Chaque projet de BESS \u00e0 400 V a-t-il besoin d\u2019un transformateur d\u2019isolement ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2795\" class=\"elementor-element elementor-element-f342af4c e-con-full e-flex e-con e-child\" data-id=\"f342af4c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2795\" class=\"elementor-element elementor-element-27e09766 e-con-full e-flex e-con e-child\" data-id=\"27e09766\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cf0bb0b9 elementor-widget elementor-widget-heading\" data-id=\"cf0bb0b9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il n'existe pas de r\u00e9ponse universelle. La d\u00e9cision d\u00e9pend de l'interface PCS, de la mise \u00e0 la terre du site, de l'adaptation de tension, de l'exigence d'isolement galvanique, de l'\u00e9tude de d\u00e9faut et du mode d'exploitation. Certaines plateformes MegSolid indiquent des transformateurs d'isolement int\u00e9gr\u00e9s, tandis que l'int\u00e9gration du syst\u00e8me PMA est propre au projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2796\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2796\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Qu'est-ce qui change lorsque le BESS doit alimenter des charges de secours ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2796\" class=\"elementor-element elementor-element-e7ac9542 e-con-full e-flex e-con e-child\" data-id=\"e7ac9542\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2796\" class=\"elementor-element elementor-element-3f6fb37b e-con-full e-flex e-con e-child\" data-id=\"3f6fb37b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-45c8ed77 elementor-widget elementor-widget-heading\" data-id=\"45c8ed77\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le SLD doit identifier le jeu de barres des charges essentielles, l'arrangement de s\u00e9paration ou de transfert des sources, le comportement du neutre et des mises \u00e0 la terre, le d\u00e9lestage, l'interaction avec le groupe \u00e9lectrog\u00e8ne, la s\u00e9quence de r\u00e9tablissement et les essais de r\u00e9ception. Un d\u00e9part en parall\u00e8le r\u00e9seau pour l'\u00e9cr\u00eatage de pointe ne fournit pas automatiquement un service de secours.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2797\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2797\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelles informations de CT et de compteur faut-il pour la commande de l'EMS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2797\" class=\"elementor-element elementor-element-dbdd0a11 e-con-full e-flex e-con e-child\" data-id=\"dbdd0a11\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2797\" class=\"elementor-element elementor-element-ae200185 e-con-full e-flex e-con e-child\" data-id=\"ae200185\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d076615c elementor-widget elementor-widget-heading\" data-id=\"d076615c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Fournissez l'emplacement de l'appareil, le rapport et le sens du CT, le rep\u00e9rage des phases, la pr\u00e9cision, la plage de mesure, la convention de signe, le protocole de communication, la fr\u00e9quence de mise \u00e0 jour, la synchronisation horaire, les indicateurs de qualit\u00e9 des donn\u00e9es et la r\u00e9action face \u00e0 des mesures p\u00e9rim\u00e9es ou perdues.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2798\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2798\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> MegSolid fournit-il des panneaux solaires avec un BESS \u00e0 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2798\" class=\"elementor-element elementor-element-063cd689 e-con-full e-flex e-con e-child\" data-id=\"063cd689\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2798\" class=\"elementor-element elementor-element-bda723da e-con-full e-flex e-con e-child\" data-id=\"bda723da\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c329144a elementor-widget elementor-widget-heading\" data-id=\"c329144a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. Le p\u00e9rim\u00e8tre MegSolid concern\u00e9 est celui des \u00e9quipements de stockage d'\u00e9nergie, onduleurs et PCS dans la fronti\u00e8re de projet convenue. Les modules solaires, syst\u00e8mes de montage et la construction PV locale devraient \u00eatre achet\u00e9s localement ; fournissez les donn\u00e9es d'interface PV si l'EMS du BESS doit se coordonner avec un syst\u00e8me PV existant ou pr\u00e9vu.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2799\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2799\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> La plateforme MegSolid ESSA peut-elle \u00eatre command\u00e9e avec des cellules de batterie \u00e0 \u00e9lectrolyte solide ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2799\" class=\"elementor-element elementor-element-c1206308 e-con-full e-flex e-con e-child\" data-id=\"c1206308\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2799\" class=\"elementor-element elementor-element-e3025aff e-con-full e-flex e-con e-child\" data-id=\"e3025aff\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a307f6f4 elementor-widget elementor-widget-heading\" data-id=\"a307f6f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui, la plateforme ext\u00e9rieure ESSA C&amp;I peut \u00eatre configur\u00e9e avec des cellules de batterie \u00e0 \u00e9lectrolyte solide selon les exigences propres au projet. Le devis, la fiche technique sign\u00e9e et la BOM doivent identifier la cellule et la configuration fournies ; cette option ne prouve pas que chaque unit\u00e9 ESSA est \u00e0 \u00e9lectrolyte solide.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-27910\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-27910\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelles donn\u00e9es un syst\u00e8me d\u2019achat assist\u00e9 par IA doit-il extraire d\u2019une demande de BESS \u00e0 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27910\" class=\"elementor-element elementor-element-3f2f4456 e-con-full e-flex e-con e-child\" data-id=\"3f2f4456\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27910\" class=\"elementor-element elementor-element-2a3953f8 e-con-full e-flex e-con e-child\" data-id=\"2a3953f8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-734c1c14 elementor-widget elementor-widget-heading\" data-id=\"734c1c14\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il doit extraire l\u2019emplacement du projet, le mode de fonctionnement, les kW ou kVA requis, les kWh et la dur\u00e9e requis, la tension et la fr\u00e9quence du r\u00e9seau, les donn\u00e9es du transformateur, les caract\u00e9ristiques assign\u00e9es du tableau et sa tenue aux d\u00e9fauts, le point de raccordement, le p\u00e9rim\u00e8tre de mesure des transformateurs de courant, les charges critiques, les conditions du site, le p\u00e9rim\u00e8tre de conformit\u00e9, l\u2019Incoterm et la date de livraison.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-27911\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-27911\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelle est la r\u00e9ponse fiable la plus courte \u00e0 la question du raccordement d\u2019un BESS \u00e0 400 V ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27911\" class=\"elementor-element elementor-element-f9f40779 e-con-full e-flex e-con e-child\" data-id=\"f9f40779\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27911\" class=\"elementor-element elementor-element-0f066276 e-con-full e-flex e-con e-child\" data-id=\"0f066276\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9edcb9ab elementor-widget elementor-widget-heading\" data-id=\"9edcb9ab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">V\u00e9rifiez d\u2019abord la correspondance de tension, puis la capacit\u00e9 en courant, les contraintes en cas de d\u00e9faut, la s\u00e9lectivit\u00e9 des protections, le neutre et la mise \u00e0 la terre, le comptage, le mode de fonctionnement et le partage des responsabilit\u00e9s d\u00e9fini dans le sch\u00e9ma unifilaire, avant de commander le BESS ou de modifier le tableau.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-27912\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-27912\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quelle page un acheteur doit-il demander apr\u00e8s avoir lu cette liste de contr\u00f4le de raccordement ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27912\" class=\"elementor-element elementor-element-1fb7324e e-con-full e-flex e-con e-child\" data-id=\"1fb7324e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-27912\" class=\"elementor-element elementor-element-a3ac5d3f e-con-full e-flex e-con e-child\" data-id=\"a3ac5d3f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-105b0f6e elementor-widget elementor-widget-heading\" data-id=\"105b0f6e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Demandez un sch\u00e9ma unifilaire propre au projet et une \u00e9tude de faisabilit\u00e9 du tableau. Le document utile \u00e0 cette \u00e9tape pr\u00e9sente un sch\u00e9ma annot\u00e9 des limites de raccordement et une liste des donn\u00e9es manquantes concernant le transformateur, le tableau principal, le profil de charge et les besoins d\u2019exploitation de l\u2019acheteur, plut\u00f4t qu\u2019une brochure g\u00e9n\u00e9rique.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>V\u00e9rifiez la capacit\u00e9 des barres omnibus, le fonctionnement en cas de d\u00e9faut, la protection, la mise \u00e0 la terre, le comptage par transformateurs de courant (TC) et la topologie de secours avant de raccorder un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) de type C&amp;I \u00e0 un tableau \u00e9lectrique existant de 400 V.<\/p>","protected":false},"author":4,"featured_media":4601,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[1,714],"tags":[472,473,273,271,272,269,275,268,270,212],"class_list":["post-4604","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-ci-battery-storage-solutions","tag-400v-bess-connection","tag-400v-main-board","tag-bess-ct-metering","tag-bess-protection-coordination","tag-bess-single-line-diagram","tag-ci-battery-storage-connection","tag-ci-bess-rfq","tag-existing-switchboard-bess","tag-low-voltage-bess-interconnection","tag-megsolid-bess"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=4604"}],"version-history":[{"count":14,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4604\/revisions"}],"predecessor-version":[{"id":6062,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/4604\/revisions\/6062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/4601"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=4604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=4604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=4604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}