{"id":5159,"date":"2026-09-01T14:02:48","date_gmt":"2026-09-01T06:02:48","guid":{"rendered":"https:\/\/www.solidess.com\/?p=5159"},"modified":"2026-09-01T14:02:48","modified_gmt":"2026-09-01T06:02:48","slug":"owner-furnished-bess-epc-scope-warranty-gaps","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/owner-furnished-bess-epc-scope-warranty-gaps\/","title":{"rendered":"BESS fourni par le propri\u00e9taire : port\u00e9e de l\u2019EPC et lacunes en mati\u00e8re de garantie"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5159\" class=\"elementor elementor-5159\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8c36ebc1 auto-p elementor-widget elementor-widget-heading\" data-id=\"8c36ebc1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Lorsqu\u2019un ma\u00eetre d\u2019ouvrage ach\u00e8te directement le syst\u00e8me de batteries, mandate un EPC pour l\u2019installer et demande au fournisseur d\u2019\u00e9quipements de le mettre en service, le p\u00e9rim\u00e8tre de l\u2019EPC charg\u00e9 du BESS n\u2019est commercialement complet que lorsque chaque interface a un responsable d\u00e9sign\u00e9. MegSolid peut fournir le syst\u00e8me BESS int\u00e9gr\u00e9, les documents d\u2019interface contr\u00f4l\u00e9s ainsi que l\u2019assistance convenue pour la fabrication et la mise en service ; l\u2019EPC a toutefois besoin d\u2019une d\u00e9limitation sign\u00e9e pour les travaux de g\u00e9nie civil, l\u2019appareillage \u00e9lectrique, le c\u00e2blage, les commandes sur site et la mise sous tension. La responsabilit\u00e9 globale reste ancr\u00e9e dans le <strong><a href=\"https:\/\/www.solidess.com\/fr\/battery-energy-storage-system-design-ci-sites\/\" target=\"_blank\" style=\"color:#61ce70\">Conception d'un syst\u00e8me de stockage d'\u00e9nergie par batterie C&amp;I<\/a><\/strong>, tandis que la r\u00e9partition des paquets suit les sp\u00e9cificit\u00e9s du projet <strong><a href=\"https:\/\/www.solidess.com\/fr\/india-bess-dc-ac-package\/\" target=\"_blank\" style=\"color:#61ce70\">Limites des \u00e9quipements BESS et des installations annexes<\/a><\/strong> et les <strong><a href=\"https:\/\/www.solidess.com\/fr\/connexion-de-batterie-400-v-au-tableau-electrique-existant\/\" target=\"_blank\" style=\"color:#61ce70\">Raccordement au tableau \u00e9lectrique de 400 V<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4fcaf601 auto-p elementor-widget elementor-widget-heading\" data-id=\"4fcaf601\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le probl\u00e8me le plus courant r\u00e9side dans une petite t\u00e2che qui a \u00e9t\u00e9 omise des deux contrats. Une armoire est livr\u00e9e, mais le bon de commande ne pr\u00e9cise pas qui est charg\u00e9 du d\u00e9chargement. L\u2019EPC installe les c\u00e2bles d\u2019alimentation, mais aucun document n\u2019indique qui doit valider le couple de serrage des bornes avant la premi\u00e8re mise sous tension. Un essai sur site \u00e9choue alors, et l\u2019une des garanties couvre les d\u00e9fauts de l\u2019\u00e9quipement tandis que l\u2019autre couvre les vices de fabrication. Le ma\u00eetre d\u2019ouvrage se retrouve alors \u00e0 devoir coordonner la collecte des preuves, les travaux correctifs et un deuxi\u00e8me essai, tandis que la date de mise en service commerciale ne cesse d\u2019\u00eatre repouss\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9198e363 auto-p elementor-widget elementor-widget-heading\" data-id=\"9198e363\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Quatre documents permettent de combler la majeure partie de ce manque d'informations avant l'exp\u00e9dition :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d537451 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"4d537451\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">1. un cahier des charges d\u00e9taill\u00e9 li\u00e9 aux r\u00e9f\u00e9rences exactes des mod\u00e8les et aux versions des documents ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">2. un tableau de r\u00e9partition des responsabilit\u00e9s d\u00e9signant un responsable pour chaque t\u00e2che ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">3. une proc\u00e9dure de livraison, de garde et de conservation, depuis la sortie d'usine jusqu'\u00e0 la mise sous tension ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">4. un bar\u00e8me de garantie et de performance reprenant les m\u00eames crit\u00e8res de test, dates et exclusions dans chaque contrat.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8d1d4a21 auto-image elementor-widget elementor-widget-image\" data-id=\"8d1d4a21\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1120\" height=\"1120\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5156\" alt=\"Processus de conception du syst\u00e8me de stockage d&#039;\u00e9nergie par batterie MegSolid C&amp;I avec des armoires r\u00e9elles, la puissance du PCS, l&#039;\u00e9nergie de la batterie, le PCC, l&#039;EMS et les tests FAT\/SAT\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps.png 1120w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-300x300.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-1024x1024.png 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-150x150.png 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-768x768.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-12x12.png 12w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-600x600.png 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Owner-Furnished-BESS-EPC-Scope-and-Warranty-Gaps-100x100.png 100w\" sizes=\"(max-width: 1120px) 100vw, 1120px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a86e4eab auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a86e4eab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Les clauses BESS pr\u00e9voyant que le mobilier est fourni par le propri\u00e9taire modifient la r\u00e9partition du risque li\u00e9 \u00e0 l'interface<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c648beb7 auto-p elementor-widget elementor-widget-heading\" data-id=\"c648beb7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Dans le cas d\u2019une installation fournie par le propri\u00e9taire, ce dernier passe un contrat directement avec le fournisseur du syst\u00e8me de stockage d\u2019\u00e9nergie par batterie (BESS). L\u2019EPC se charge de l\u2019approvisionnement et de la construction des \u00e9quipements auxiliaires locaux, installe les \u00e9quipements fournis par le propri\u00e9taire et r\u00e9alise les travaux sur site n\u00e9cessaires \u00e0 la mise sous tension. Les sp\u00e9cialistes du fournisseur proc\u00e8dent ensuite \u00e0 la mise en service du BESS conform\u00e9ment au cahier des charges de fourniture et de service sign\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5c61359a auto-p elementor-widget elementor-widget-heading\" data-id=\"5c61359a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Cette structure permet au service des achats d'avoir un acc\u00e8s direct \u00e0 la source d'approvisionnement du mat\u00e9riel, \u00e0 la documentation et aux conditions commerciales. Elle place \u00e9galement le ma\u00eetre d'ouvrage entre deux contrats. Les \u00e9conomies r\u00e9alis\u00e9es sur la marge du mat\u00e9riel ne sont valables que si le contrat d'approvisionnement et le contrat EPC se rejoignent au niveau de la livraison, de l'installation, de la mise en service et de la garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0d055c1f auto-p elementor-widget elementor-widget-heading\" data-id=\"0d055c1f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <a href=\"https:\/\/restservice.epri.com\/publicdownload\/000000003002017242\/0\/Product\" target=\"_blank\" rel=\"noopener\">Guide de l'appel d'offres de l'EPRI et de l'ESIC concernant le stockage d'\u00e9nergie<\/a> recommande l'utilisation d'une matrice de r\u00e9partition des responsabilit\u00e9s lorsque le propri\u00e9taire, le fournisseur de syst\u00e8mes de stockage d'\u00e9nergie et l'entrepreneur charg\u00e9 de l'installation sont des entit\u00e9s distinctes. Son mod\u00e8le suit la structure \u00ab Responsable, Tenu de rendre compte, Consult\u00e9 et Inform\u00e9 \u00bb. Le champ qui importe est <strong>Responsable<\/strong>. Trois parties peuvent \u00eatre consult\u00e9es et la t\u00e2che reste sans responsable si personne ne la valide comme termin\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1d67ea81 auto-p elementor-widget elementor-widget-heading\" data-id=\"1d67ea81\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les conditions commerciales restent soumises aux contrats sign\u00e9s et \u00e0 la l\u00e9gislation applicable. L\u2019\u00e9quipe technique doit encore rendre chaque limite mesurable. La mention \u201c L\u2019EPC se chargera de la coordination \u201d ne constitue pas un livrable mesurable. En revanche, \u201c L\u2019EPC \u00e9mettra le proc\u00e8s-verbal d\u2019inspection de fin de chantier approuv\u00e9 avant l\u2019autorisation de mise sous tension par le fournisseur \u201d en est un.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df8a6b30 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"df8a6b30\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Figez le p\u00e9rim\u00e8tre du projet BESS EPC avant de comparer les prix<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c9764c46 auto-p elementor-widget elementor-widget-heading\" data-id=\"c9764c46\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Deux devis indiquant les m\u00eames valeurs en kW et en kWh peuvent n\u00e9anmoins porter sur des p\u00e9rim\u00e8tres diff\u00e9rents. L'un peut inclure un syst\u00e8me PCS int\u00e9gr\u00e9, un syst\u00e8me CVC interne, des interfaces incendie, des fonctions EMS et des essais en usine. L'autre peut traiter les compteurs, l'alimentation auxiliaire, le contr\u00f4leur de site, le transformateur, les communications \u00e0 distance ou la mise en service comme des \u00e9l\u00e9ments distincts.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2ae3493d auto-p elementor-widget elementor-widget-heading\" data-id=\"2ae3493d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Utilisez un tableau d\u00e9taill\u00e9. Une ligne unique \u201c BESS complet \u201d masque la ventilation. Pour chaque \u00e9l\u00e9ment, indiquez :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a4ba0c56 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"a4ba0c56\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">marque et mod\u00e8le ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">quantit\u00e9 et r\u00e9vision contr\u00f4l\u00e9e de la fiche technique ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">emplacement d'installation et p\u00e9rim\u00e8tre \u00e9lectrique ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">y compris les c\u00e2bles internes, les \u00e9quipements auxiliaires et les commandes ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">raccordements et services fournis par le site ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les plans, calculs, certificats et proc\u00e8s-verbaux d'essais requis ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">obligations relatives \u00e0 l'usine, au site et aux essais de performance ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">pi\u00e8ces de rechange, outillage sp\u00e9cialis\u00e9, formation et assistance technique ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">exclusions explicites.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a743d7fc auto-p elementor-widget elementor-widget-heading\" data-id=\"a743d7fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le cahier des charges des \u00e9quipements doit \u00eatre coh\u00e9rent avec le sch\u00e9ma unifilaire, le plan d'ensemble, le cahier des charges des c\u00e2bles, l'architecture de communication et le cahier des charges tarifaire. Si le PCS figure dans le prix des \u00e9quipements mais n'est pas inclus dans le p\u00e9rim\u00e8tre de mise en service du fournisseur, cette incoh\u00e9rence doit \u00eatre r\u00e9solue avant la validation de la commande.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-96be6e4f auto-p elementor-widget elementor-widget-heading\" data-id=\"96be6e4f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour un \u00e9cran ESSA0100B-0215, les sp\u00e9cifications techniques publi\u00e9es correspondent \u00e0 une armoire d'ext\u00e9rieur de 100 kW \/ 215,04 kWh, 400 V, dot\u00e9e d'un syst\u00e8me de refroidissement par air intelligent et d'un indice de protection IP54. Ces valeurs d\u00e9terminent la gamme d\u2019\u00e9quipements. Elles ne d\u00e9finissent pas l\u2019alimentation du site, le disjoncteur, le trac\u00e9 des c\u00e2bles, les fondations, le drainage, le comptage PCC ni l\u2019homologation locale. La configuration exacte fournie et les interfaces doivent correspondre au devis, \u00e0 la nomenclature et aux documents de projet approuv\u00e9s pour le <strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-en-armoire-exterieure\/\" target=\"_blank\" style=\"color:#61ce70\">Syst\u00e8me de stockage d'\u00e9nergie en armoire ext\u00e9rieure ESSA<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8b1fad9a auto-h2 elementor-widget elementor-widget-heading\" data-id=\"8b1fad9a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Utilisez une matrice DOR couvrant l'ensemble de la s\u00e9quence du site<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-27132926 auto-p elementor-widget elementor-widget-heading\" data-id=\"27132926\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un tableau de proposition succinct se limite souvent aux rubriques \u201c \u00e9quipement du fournisseur \u201d et \u201c installation EPC \u201d. Cette distinction est trop sommaire pour les travaux sur site. La matrice doit suivre l'\u00e9quipement tout au long des \u00e9tapes de validation de la conception, de transport, d'installation, de mise sous tension, d'essais et de garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2002d826 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"2002d826\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>T\u00e2che ou livrable<\/th><th>Fournisseur de mat\u00e9riel<\/th><th>EPC<\/th><th>Propri\u00e9taire<\/th><th>Registre des acceptations<\/th><\/tr><\/thead><tbody><tr><td>V\u00e9rifier les param\u00e8tres de conception et les conditions d'exploitation<\/td><td>Indiquer les limites de l'\u00e9quipement et les donn\u00e9es requises<\/td><td>V\u00e9rifier les donn\u00e9es relatives au site et la conception locale<\/td><td>Approuver les principes de conception<\/td><td>Registre d'entr\u00e9e sign\u00e9<\/td><\/tr><tr><td>G\u00e9n\u00e9rer les donn\u00e9es d'interface de l'\u00e9quipement<\/td><td>Dimensions, masse, bornes, \u00e9quipements auxiliaires et exigences en mati\u00e8re de communication<\/td><td>V\u00e9rification par rapport aux plans de g\u00e9nie civil et d'\u00e9lectricit\u00e9<\/td><td>Suivre les commentaires et les dates d'approbation<\/td><td>Ensemble d'interfaces approuv\u00e9<\/td><\/tr><tr><td>Fondations et acc\u00e8s complets<\/td><td>Saisir les donn\u00e9es relatives aux charges, aux ancrages et aux d\u00e9gagements<\/td><td>Concevoir et r\u00e9aliser des ouvrages locaux<\/td><td>Lieu de l\u00e2cher et contr\u00f4le par relev\u00e9<\/td><td>Proc\u00e8s-verbal de relev\u00e9 topographique et d'inspection des ouvrages de g\u00e9nie civil<\/td><\/tr><tr><td>Organiser le transport et la livraison<\/td><td>Exigences relatives \u00e0 l'emballage et \u00e0 la manutention dans le cadre des conditions d'approvisionnement<\/td><td>Assurer l'acc\u00e8s au chantier et la coordination des livraisons, selon les missions attribu\u00e9es<\/td><td>V\u00e9rifier les Incoterms, l'assurance et le transfert des risques<\/td><td>Rapport de livraison et d'\u00e9tat<\/td><\/tr><tr><td>D\u00e9charger et mettre en place le mat\u00e9riel<\/td><td>Indiquer les points de levage et les consignes de manutention<\/td><td>Fournir une grue, le mat\u00e9riel de levage et un \u00e9quipage qualifi\u00e9 sur les sites d\u00e9sign\u00e9s<\/td><td>V\u00e9rifier l'identit\u00e9 du responsable avant l'exp\u00e9dition<\/td><td>Plan de levage et proc\u00e8s-verbal de mise en place<\/td><\/tr><tr><td>Stockage et conservation avant la pose<\/td><td>Exigences de l'\u00c9tat en mati\u00e8re de stockage et de conservation<\/td><td>Effectuer les inspections et les travaux d'entretien qui lui sont confi\u00e9s<\/td><td>Mettre en place une zone s\u00e9curis\u00e9e et veiller au respect des r\u00e8gles<\/td><td>Journal de conservation<\/td><\/tr><tr><td>Installer les c\u00e2bles d'alimentation, auxiliaires et de communication<\/td><td>Indiquer les exigences relatives aux terminaux et aux protocoles<\/td><td>Fournir, installer, \u00e9tiqueter et tester les c\u00e2bles du site<\/td><td>Coordonner les coupures de courant et les acc\u00e8s<\/td><td>Dossier relatif aux essais et \u00e0 la terminaison des c\u00e2bles<\/td><\/tr><tr><td>Configurer le compteur de site et le syst\u00e8me SCADA<\/td><td>Indiquer les points pris en charge et les param\u00e8tres c\u00f4t\u00e9 \u00e9quipement<\/td><td>Installation du r\u00e9seau de terrain, des compteurs et du syst\u00e8me SCADA sur site<\/td><td>Approuver la propri\u00e9t\u00e9 et l'acc\u00e8s aux commandes<\/td><td>Rapport d'essai point \u00e0 point<\/td><\/tr><tr><td>Autoriser la premi\u00e8re mise sous tension<\/td><td>V\u00e9rifier que l'\u00e9quipement est pr\u00eat<\/td><td>V\u00e9rifier que le site est pr\u00eat et valider la mise en production de la protection<\/td><td>Coordonner l'autorisation avec l'autorit\u00e9 comp\u00e9tente en mati\u00e8re de changement de fournisseur ou de services publics d\u00e9sign\u00e9e<\/td><td>Certificat de pr\u00e9paration interarm\u00e9es<\/td><\/tr><tr><td>Confier la r\u00e9alisation du projet BESS<\/td><td>Proc\u00e9der \u00e0 la mise en service des fournisseurs dans le cadre du contrat<\/td><td>Prise en charge de la commutation, des tests sur site et de la correction des d\u00e9fauts<\/td><td>Prendre connaissance et accepter<\/td><td>Rapport de mise en service<\/td><\/tr><tr><td>D\u00e9montrer la performance du projet<\/td><td>D\u00e9montrer les valeurs garanties par le fournisseur \u00e0 la limite indiqu\u00e9e<\/td><td>Mettre en \u00e9vidence la contribution des installations annexes<\/td><td>G\u00e9rer la proc\u00e9dure de r\u00e9ception<\/td><td>Rapport d'essai sign\u00e9<\/td><\/tr><tr><td>Rechercher les d\u00e9fauts<\/td><td>Analyse des preuves mat\u00e9rielles<\/td><td>Analyse des \u00e9l\u00e9ments relatifs \u00e0 l'installation et au site<\/td><td>V\u00e9rifier les pi\u00e8ces justificatives et les dates de r\u00e9ponse<\/td><td>Registre commun des causes profondes<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f84548e auto-p elementor-widget elementor-widget-heading\" data-id=\"8f84548e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le projet peut r\u00e9partir ces r\u00f4les diff\u00e9remment. Chaque ligne doit d\u00e9signer une partie charg\u00e9e d'effectuer le travail et une autre charg\u00e9e de certifier qu'il est termin\u00e9. Si la m\u00eame activit\u00e9 figure dans les deux contrats, les documents doivent d\u00e9crire le transfert de responsabilit\u00e9 plut\u00f4t que de partir du principe que les deux parties s'en chargeront.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e072ecc1 auto-image elementor-widget elementor-widget-image\" data-id=\"e072ecc1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1254\" height=\"941\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5157\" alt=\"Graphique de dimensionnement MegSolid C&amp;I BESS distinguant les valeurs en kW et kVA des PCS de celles en kWh des batteries, les d\u00e9marrages de moteurs, la plage de SOC et la plage de charge\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility.png 1254w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility-300x225.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility-1024x768.png 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility-768x576.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility-16x12.png 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Division-of-Responsibility-600x450.png 600w\" sizes=\"(max-width: 1254px) 100vw, 1254px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a0bab768 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a0bab768\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">La livraison correspond \u00e0 une remise technique, et non \u00e0 l'arriv\u00e9e d'un camion<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae22b04a auto-p elementor-widget elementor-widget-heading\" data-id=\"ae22b04a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le transfert des risques intervient souvent \u00e0 un point de livraison d\u00e9sign\u00e9. La r\u00e9ception technique a g\u00e9n\u00e9ralement lieu par la suite. Un processus de livraison bien d\u00e9fini distingue la r\u00e9ception commerciale de la confirmation que le mat\u00e9riel reste apte \u00e0 \u00eatre install\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b7dc5246 auto-p elementor-widget elementor-widget-heading\" data-id=\"b7dc5246\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La proc\u00e9dure de livraison doit pr\u00e9ciser :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1191a2aa elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"1191a2aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Incoterm et lieu d\u00e9sign\u00e9 ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">le transfert de propri\u00e9t\u00e9 et du risque de perte ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">une entreprise charg\u00e9e de l'organisation du fret, de l'assurance, des formalit\u00e9s douani\u00e8res et du transport terrestre ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les contraintes li\u00e9es aux routes, aux portails, aux grues et aux aires de stockage ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">d\u00e9lai de pr\u00e9avis et documents de livraison requis ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">m\u00e9thode permettant de consigner les chocs, les inclinaisons, les dommages li\u00e9s \u00e0 l'emballage ou les dommages visibles ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">d\u00e9lai pr\u00e9vu pour signaler les dommages cach\u00e9s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">la responsabilit\u00e9 du d\u00e9chargement, du gr\u00e9ement et du positionnement final ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">v\u00e9rification des conditions de stockage et de conservation avant la mise sous tension.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4e360eb4 auto-p elementor-widget elementor-widget-heading\" data-id=\"4e360eb4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Prenons l'exemple d'une usine o\u00f9 l'armoire est livr\u00e9e six semaines avant la mise hors service du tableau de distribution. Le bon de livraison confirme que le camion est bien arriv\u00e9 sur le site. Il ne confirme toutefois pas que le mat\u00e9riel a \u00e9t\u00e9 stock\u00e9, que les entr\u00e9es de c\u00e2bles sont s\u00e8ches, que l'emballage est intact ni que le fabricant a effectu\u00e9 les contr\u00f4les de conservation n\u00e9cessaires au cours de ces six semaines. La d\u00e9signation d'un responsable de la conservation, la d\u00e9finition d'une fr\u00e9quence d'inspection et la tenue d'un registre sign\u00e9 fournissent des \u00e9l\u00e9ments de preuve exploitables pour l'examen ult\u00e9rieur de la garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2e018d29 auto-p elementor-widget elementor-widget-heading\" data-id=\"2e018d29\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La pr\u00e9paration des fondations s'inscrit dans la m\u00eame s\u00e9quence. Les dimensions des \u00e9quipements et les donn\u00e9es de charge sont fournies par le fournisseur ; la conception g\u00e9otechnique, le drainage, les tol\u00e9rances de construction et l'obtention des autorisations locales rel\u00e8vent g\u00e9n\u00e9ralement de la responsabilit\u00e9 de l'ing\u00e9nieur de projet et du contractant EPC. Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/les-epc-doivent-demander-les-donnees-dentree-pour-la-conception-des-fondations-du-bess-exterieur\/\" target=\"_blank\" style=\"color:#61ce70\">Donn\u00e9es d'entr\u00e9e pour la fondation BESS en ext\u00e9rieur<\/a><\/strong> doit \u00eatre r\u00e9gl\u00e9 avant que la date de livraison ne soit fix\u00e9e. La pr\u00e9sence d'une grue \u00e0 c\u00f4t\u00e9 d'un socle inachev\u00e9 constitue un manquement au cahier des charges, m\u00eame si l'armoire a \u00e9t\u00e9 livr\u00e9e dans les d\u00e9lais.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8a3c39a8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"8a3c39a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">La premi\u00e8re mise sous tension n\u00e9cessite deux certificats de conformit\u00e9<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f197c24d auto-p elementor-widget elementor-widget-heading\" data-id=\"f197c24d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le fournisseur peut confirmer que le syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) est pr\u00eat du point de vue des \u00e9quipements. Le ma\u00eetre d'\u0153uvre (EPC) peut confirmer que le site est pr\u00eat du point de vue des installations annexes. La premi\u00e8re mise sous tension n\u00e9cessite ces deux confirmations.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-33392464 auto-p elementor-widget elementor-widget-heading\" data-id=\"33392464\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le rapport sur l'\u00e9tat de pr\u00e9paration du fournisseur doit porter sur les \u00e9l\u00e9ments figurant dans le contrat d'approvisionnement, tels que :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-57c982be elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"57c982be\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">mod\u00e8le, num\u00e9ros de s\u00e9rie et version du micrologiciel v\u00e9rifi\u00e9s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u00e9l\u00e9ments de la liste des travaux \u00e0 terminer en usine ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">contr\u00f4le de l'\u00e9tat \u00e0 l'exp\u00e9dition ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les contr\u00f4les internes des \u00e9quipements requis par le manuel d'installation ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les param\u00e8tres d'\u00e9quipement et les fichiers de communication approuv\u00e9s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">pr\u00e9sence d'un sp\u00e9cialiste et conditions pr\u00e9alables \u00e0 la mise en service.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0711aef0 auto-p elementor-widget elementor-widget-heading\" data-id=\"0711aef0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le rapport sur l'\u00e9tat de pr\u00e9paration du c\u00f4t\u00e9 EPC doit porter sur les \u00e9l\u00e9ments suivants :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-561ceee7 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"561ceee7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">sch\u00e9ma unifilaire et param\u00e8tres de protection homologu\u00e9s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">fondations, d\u00e9gagements, drainage et voies d'acc\u00e8s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">R\u00e9sultats des essais sur les c\u00e2bles CA et auxiliaires ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">registres relatifs \u00e0 la mise \u00e0 la terre et \u00e0 la liaison ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">v\u00e9rification des disjoncteurs, des dispositifs de verrouillage et des arr\u00eats d'urgence ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">rapport de mesure, polarit\u00e9 du transformateur de courant et disponibilit\u00e9 de la communication ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">syst\u00e8me de lutte contre l'incendie et interfaces d'urgence du site ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">autorisation de mise sous tension, plan de commutation et contr\u00f4le de la s\u00e9curit\u00e9 sur le site.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c42b8306 auto-p elementor-widget elementor-widget-heading\" data-id=\"c42b8306\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Cette distinction permet d'\u00e9viter qu'un ing\u00e9nieur charg\u00e9 de la mise en service ne soit amen\u00e9 \u00e0 mettre sous tension un circuit d'alimentation non homologu\u00e9. Elle emp\u00eache \u00e9galement le ma\u00eetre d'\u0153uvre (EPC) de consid\u00e9rer la pr\u00e9sence du fournisseur comme une validation de la construction du site. En ce qui concerne les interfaces de contr\u00f4le, le <strong><a href=\"https:\/\/www.solidess.com\/fr\/liste-des-points-scada-bess-ce-que-votre-ems-doit-envoyer\/\" target=\"_blank\" style=\"color:#61ce70\">Liste des points SCADA BESS<\/a><\/strong> Il est indispensable de pr\u00e9ciser la source, la destination, l'unit\u00e9 technique, l'autorit\u00e9 d'\u00e9criture, le d\u00e9lai d'expiration et l'\u00e9tat de s\u00e9curit\u00e9 en cas de d\u00e9faillance avant le d\u00e9but des essais sur site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-647892fa auto-h2 elementor-widget elementor-widget-heading\" data-id=\"647892fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Distinction entre la garantie sur le mat\u00e9riel et la garantie sur la main-d'\u0153uvre<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b818b77f auto-p elementor-widget elementor-widget-heading\" data-id=\"b818b77f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une garantie sur le mat\u00e9riel et une garantie de conformit\u00e9 (EPC) sur la main-d'\u0153uvre couvrent diff\u00e9rents types de d\u00e9faillances. L'ensemble des contrats doit pr\u00e9voir une proc\u00e9dure d'enqu\u00eate pour les d\u00e9faillances survenant au niveau de l'interface.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6154c3d1 auto-p elementor-widget elementor-widget-heading\" data-id=\"6154c3d1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Parmi les \u00e9l\u00e9ments de preuve typiques li\u00e9s au mat\u00e9riel, on peut citer :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0bbe772b elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"0bbe772b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Journaux d'\u00e9v\u00e9nements du BMS, du PCS et du contr\u00f4leur ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">enregistrements des temp\u00e9ratures internes, de la tension et du courant ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">historique des alarmes et version du micrologiciel ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les r\u00e9sultats des essais en usine et la tra\u00e7abilit\u00e9 des num\u00e9ros de s\u00e9rie ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">r\u00e9sultats de l'inspection et du diagnostic des composants.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b5e3a2e7 auto-p elementor-widget elementor-widget-heading\" data-id=\"b5e3a2e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les \u00e9l\u00e9ments de preuve typiques recueillis sur place comprennent :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f7ddc7b8 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"f7ddc7b8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les donn\u00e9es relatives \u00e0 la tension et \u00e0 la fr\u00e9quence d'entr\u00e9e ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">r\u00e9sultats concernant l'isolation des c\u00e2bles, la continuit\u00e9 et la rotation des phases ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">enregistrements du couple terminal et des images thermiques ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les \u00e9v\u00e9nements des relais de protection et l'historique des disjoncteurs ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">le c\u00e2blage CT, l'\u00e9tat du r\u00e9seau et la qualit\u00e9 de l'alimentation auxiliaire ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">dossiers relatifs \u00e0 l'environnement et \u00e0 la maintenance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d277ceae auto-p elementor-widget elementor-widget-heading\" data-id=\"d277ceae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Supposons que le BESS se d\u00e9clenche lors d\u2019un essai de d\u00e9charge de 100 kW. Le sympt\u00f4me du d\u00e9clenchement ne permet pas \u00e0 lui seul d\u2019identifier la partie responsable. Le dossier d\u2019incident doit inclure la tension aux bornes du PCS, la tension au PCC, les relev\u00e9s des disjoncteurs et des relais, les donn\u00e9es relatives aux c\u00e2bles, les limites de la batterie et les alarmes synchronis\u00e9es dans le temps. Si le PCS a atteint une limite de protection interne, le fournisseur examine le circuit de l\u2019\u00e9quipement. Si un chute de tension excessive ou un r\u00e9glage incorrect du relais a provoqu\u00e9 le d\u00e9clenchement, l\u2019EPC examine le circuit du site. Si les \u00e9l\u00e9ments de preuve sont incomplets, les contrats doivent pr\u00e9voir un d\u00e9lai et des r\u00e8gles de co\u00fbts pour la r\u00e9alisation d\u2019essais conjoints, plut\u00f4t qu\u2019une discussion sans fin.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c95763e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"c95763e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il faut \u00e9galement harmoniser trois dates commerciales :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9586cb0d elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"9586cb0d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">1. d\u00e9but de la garantie de l'\u00e9quipement ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">2. D\u00e9but de la garantie sur la main-d'\u0153uvre ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">3. D\u00e9but et dur\u00e9e de la garantie de performance.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-23dc3fab auto-p elementor-widget elementor-widget-heading\" data-id=\"23dc3fab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La livraison, la premi\u00e8re mise sous tension, la r\u00e9ception provisoire et la mise en service commerciale constituent des \u00e9tapes cl\u00e9s distinctes. Le calendrier de garantie doit pr\u00e9ciser quelle \u00e9tape fait office de r\u00e9f\u00e9rence, dans quelle mesure les retards du ma\u00eetre d\u2019ouvrage ou du ma\u00eetre d\u2019\u0153uvre (EPC) influent sur la date, et si un stockage prolong\u00e9 n\u00e9cessite des conditions suppl\u00e9mentaires en mati\u00e8re de conservation ou de garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6dc506e2 auto-image elementor-widget elementor-widget-image\" data-id=\"6dc506e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1200\" height=\"900\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain.png\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5158\" alt=\"Parcours de mise en service de la conception du syst\u00e8me de stockage d&#039;\u00e9nergie MegSolid BESS, depuis le profil de charge jusqu&#039;aux valeurs en kW, kVA et kWh, en passant par la protection PCC, l&#039;EMS, les tests FAT et SAT et la remise au client\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain.png 1200w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain-300x225.png 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain-1024x768.png 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain-768x576.png 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain-16x12.png 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/BESS-Fault-Evidence-Chain-600x450.png 600w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f7b25748 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"f7b25748\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Attribuer une performance \u00e0 une limite de mesure<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7ddf711d auto-p elementor-widget elementor-widget-heading\" data-id=\"7ddf711d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une garantie produit peut s'appliquer au niveau des terminaux PCS, tandis que le test de r\u00e9ception du projet a lieu au PCC. Les pertes dans les transformateurs, les pertes dans les c\u00e2bles, la consommation auxiliaire, le facteur de puissance et les conditions d'exploitation du site constituent la diff\u00e9rence entre ces deux points. Les clauses contractuelles doivent r\u00e9partir cette diff\u00e9rence.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4aed9002 auto-p elementor-widget elementor-widget-heading\" data-id=\"4aed9002\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pour un test de performance, d\u00e9finissez :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ea380a74 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"ea380a74\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">point de mesure de la puissance active et de l'\u00e9nergie fournie ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">classe de compteurs, intervalle d'\u00e9chantillonnage et synchronisation temporelle ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">SOC de d\u00e9part et plage de SOC autoris\u00e9e ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">puissance d'essai, facteur de puissance et dur\u00e9e ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">conditions de temp\u00e9rature ambiante et de temp\u00e9rature des \u00e9quipements ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">l'inclusion ou l'exclusion des syst\u00e8mes de chauffage, de ventilation et de climatisation (CVC) et d'autres \u00e9quipements auxiliaires ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">m\u00e9thode de correction, tol\u00e9rance et exclusions de donn\u00e9es ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">conditions d'interruption, d\u00e9lai imparti pour les mesures correctives et proc\u00e9dure de r\u00e9examen ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">partie prenant en charge les frais li\u00e9s aux visites r\u00e9p\u00e9t\u00e9es sur le site, aux changements d'\u00e9quipement et au mat\u00e9riel de test.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a444ff6 auto-p elementor-widget elementor-widget-heading\" data-id=\"9a444ff6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les limites du test doivent correspondre aux dispositions de garantie figurant dans le contrat de fourniture et au test de mise en service pr\u00e9vu dans le contrat EPC. Si le ma\u00eetre d\u2019ouvrage pr\u00e9voit un export z\u00e9ro, le contractant EPC doit installer le compteur et les transformateurs de courant (TC) appropri\u00e9s au niveau de la limite r\u00e9glement\u00e9e, tandis que les dispositifs de contr\u00f4le c\u00f4t\u00e9 fournisseur doivent recevoir des donn\u00e9es fiables et fonctionner conform\u00e9ment \u00e0 la s\u00e9quence approuv\u00e9e. Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-specifier-un-controle-de-zero-injection-au-pcc-pour-un-systeme-de-stockage-denergie-par-batterie-bess\/\" target=\"_blank\" style=\"color:#61ce70\">Sp\u00e9cification de contr\u00f4le \u00ab z\u00e9ro exportation \u00bb BESS<\/a><\/strong> d\u00e9finit les limites du p\u00e9rim\u00e8tre de test du site ; cela n'implique pas le d\u00e9placement du compteur vers l'armoire d'alimentation, sauf si le contrat le pr\u00e9voit.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5947e3cb auto-p elementor-widget elementor-widget-heading\" data-id=\"5947e3cb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les essais de capacit\u00e9 exigent la m\u00eame rigueur. La valeur nominale en courant continu, le r\u00e9sultat en courant alternatif mesur\u00e9 au niveau des bornes du PCS et l'\u00e9nergie fournie par le PCC constituent des mesures distinctes. Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/pourquoi-un-bess-echoue-a-son-test-de-capacite-sans-declencher-dalarme\/\" target=\"_blank\" style=\"color:#61ce70\">Limite du test de capacit\u00e9 BESS<\/a><\/strong> doit \u00eatre convenu avant que les p\u00e9nalit\u00e9s forfaitaires, les recours au titre de la garantie ou le refus de la marchandise ne soient subordonn\u00e9s \u00e0 ce r\u00e9sultat.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6571f710 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"6571f710\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">V\u00e9rifier les interfaces du contrat avant l'exp\u00e9dition<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9cedd67a auto-p elementor-widget elementor-widget-heading\" data-id=\"9cedd67a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Veuillez envoyer le calendrier de mise \u00e0 disposition du mat\u00e9riel, les exclusions EPC, les conditions de livraison, le sch\u00e9ma unifilaire, le calendrier du projet et la matrice DOR actuelle. Cette v\u00e9rification permet de rep\u00e9rer les t\u00e2ches non attribu\u00e9es, les jalons incompatibles et les proc\u00e8s-verbaux de r\u00e9ception manquants avant que l'armoire n'arrive sur le chantier.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f1776474 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"f1776474\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Examen des interfaces contractuelles du syst\u00e8me BESS<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-236b2f13 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"236b2f13\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Ma\u00eetriser les retards de mise en service et les co\u00fbts li\u00e9s aux nouveaux essais<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cbbdf36c auto-p elementor-widget elementor-widget-heading\" data-id=\"cbbdf36c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les dates de mise en service d\u00e9pendent souvent de facteurs \u00e9chappant au contr\u00f4le du fournisseur : alimentation auxiliaire permanente, autorisation en cas de coupure du r\u00e9seau, r\u00e9glages des dispositifs de protection, acc\u00e8s au r\u00e9seau, ach\u00e8vement de l'installation du syst\u00e8me anti-incendie et autorisation de commutation en toute s\u00e9curit\u00e9. Le calendrier doit consid\u00e9rer ces \u00e9l\u00e9ments comme des conditions pr\u00e9alables clairement identifi\u00e9es, assorties de dates butoirs et de justificatifs.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1c39800f auto-p elementor-widget elementor-widget-heading\" data-id=\"1c39800f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un calendrier de mise en service concret pr\u00e9cise :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e6be1159 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"e6be1159\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">dates de d\u00e9p\u00f4t et d'examen des documents ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">date de l'inspection de pr\u00e9paration du chantier ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">avis obligatoire concernant la pr\u00e9sence des fournisseurs ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les cat\u00e9gories \u00ab \u00e9quipement \u00bb et \u00ab liste des travaux \u00e0 achever \u00bb (EPC) ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">s\u00e9quence de test et plages horaires d'interruption de service ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">propri\u00e9taire, t\u00e9moin et personne habilit\u00e9e \u00e0 proc\u00e9der \u00e0 la r\u00e9ception ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">crit\u00e8res de d\u00e9mobilisation ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">taux de retour et responsabilit\u00e9 en cas d'absence d'un pr\u00e9requis ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">date limite pour la remise des registres, des rapports et des dossiers de r\u00e9ception.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c72aae4 auto-p elementor-widget elementor-widget-heading\" data-id=\"2c72aae4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les essais en usine r\u00e9duisent l'incertitude sur le chantier lorsque la configuration approuv\u00e9e est utilis\u00e9e. A <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dessai-de-reception-en-usine-de-bess\/\" target=\"_blank\" style=\"color:#61ce70\">Essai de r\u00e9ception en usine du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) sp\u00e9cifique au projet<\/a><\/strong> Il convient de valider d\u00e9finitivement le micrologiciel, les sch\u00e9mas, la logique d'alarme et la cartographie des communications avant l'exp\u00e9dition. La r\u00e9ception sur site porte alors principalement sur les interfaces install\u00e9es que l'usine ne peut pas reproduire.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c620c8f9 auto-p elementor-widget elementor-widget-heading\" data-id=\"c620c8f9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les projets raccord\u00e9s \u00e0 un groupe \u00e9lectrog\u00e8ne n\u00e9cessitent une autre r\u00e9partition claire des responsabilit\u00e9s. Le fournisseur peut mettre en \u0153uvre les fonctions de contr\u00f4le du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) convenues ; le ma\u00eetre d'\u0153uvre (EPC) et le sp\u00e9cialiste des groupes \u00e9lectrog\u00e8nes restent responsables des emplacements r\u00e9els des transformateurs de courant (CT), de l'\u00e9tat des disjoncteurs, des r\u00e9glages des groupes \u00e9lectrog\u00e8nes et de la protection du site, conform\u00e9ment au contrat. Le projet approuv\u00e9 <strong><a href=\"https:\/\/www.solidess.com\/fr\/controle-de-bess-et-de-groupe-electrogene-diesel-sans-declenchements-sur-puissance-inverse\/\" target=\"_blank\" style=\"color:#61ce70\">S\u00e9quence de commande du BESS et du g\u00e9n\u00e9rateur<\/a><\/strong> doit permettre d'identifier la source de formation de fr\u00e9quence, la charge minimale du g\u00e9n\u00e9rateur, la limite de puissance inverse et la r\u00e9action en cas de perte de communication.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3b0a8e4 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"c3b0a8e4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Liste de contr\u00f4le pour la validation des bons de commande<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-30c0aee4 auto-p elementor-widget elementor-widget-heading\" data-id=\"30c0aee4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le service des achats peut utiliser cette liste de contr\u00f4le avant de valider la mise en service d'\u00e9quipements BESS fournis par le propri\u00e9taire :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-78119c30 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"78119c30\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Mat\u00e9riel :<\/strong> Les mod\u00e8les, quantit\u00e9s, puissances nominales, compositions chimiques, syst\u00e8mes de refroidissement et sous-syst\u00e8mes inclus correspondent exactement au cahier des charges technique.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Interfaces :<\/strong> Les limites des installations \u00e9lectriques, des travaux de g\u00e9nie civil, des r\u00e9seaux de communication, des syst\u00e8mes de protection contre l'incendie et des installations auxiliaires correspondent aux plans approuv\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Livraison :<\/strong> Les r\u00e8gles relatives aux Incoterms, au lieu de livraison, \u00e0 l'assurance, au d\u00e9chargement, \u00e0 l'inspection et \u00e0 la notification des dommages ont \u00e9t\u00e9 sign\u00e9es.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Conservation :<\/strong> Les conditions de stockage, la fr\u00e9quence des contr\u00f4les et le responsable sont indiqu\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Installation :<\/strong> Les travaux sur le chantier, la supervision, les proc\u00e8s-verbaux d'inspection et l'autorisation de r\u00e9ception sont attribu\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Mise sous tension :<\/strong> Des certificats de conformit\u00e9 \u00e9mis par les fournisseurs et les entreprises EPC sont exig\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Mise en service :<\/strong> Les pr\u00e9requis, la pr\u00e9sence, les autorisations de changement et les livrables sont planifi\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Performances :<\/strong> Les limites de mesure, les m\u00e9thodes d'essai, les facteurs de correction, les tol\u00e9rances et les mesures correctives sont harmonis\u00e9es d'un contrat \u00e0 l'autre.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Garantie :<\/strong> Les dates de d\u00e9but, les exclusions, les justificatifs, les d\u00e9lais de r\u00e9ponse et l'analyse de l'interface sont harmonis\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Remise :<\/strong> Les plans conformes \u00e0 l'ex\u00e9cution, les param\u00e8tres, les sauvegardes logicielles, les formations, les pi\u00e8ces de rechange et les rapports finaux sont r\u00e9pertori\u00e9s.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d648e3ae auto-p elementor-widget elementor-widget-heading\" data-id=\"d648e3ae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un \u00e9l\u00e9ment de liste de contr\u00f4le vide peut tout de m\u00eame correspondre \u00e0 un poste budg\u00e9taire. Il doit bloquer la validation de la commande lorsque cela modifie le transfert de risque, l'\u00e9tat de pr\u00e9paration du site, la couverture de garantie ou la r\u00e9ception.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6a7fe8cc auto-h2 elementor-widget elementor-widget-heading\" data-id=\"6a7fe8cc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Assurer une cha\u00eene de tra\u00e7abilit\u00e9 unique, de l'usine \u00e0 la remise au client<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-19467260 auto-p elementor-widget elementor-widget-heading\" data-id=\"19467260\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'approvisionnement par le ma\u00eetre d'ouvrage fonctionne lorsque les \u00e9conomies r\u00e9alis\u00e9es s'appuient sur une cha\u00eene de preuves bien ma\u00eetris\u00e9e. Le fournisseur d'\u00e9quipements justifie le syst\u00e8me fourni et ses limites de performance d\u00e9clar\u00e9es. Le contractant EPC prend en charge la conception locale, l'installation et les \u00e9quipements auxiliaires. Le ma\u00eetre d'ouvrage ou l'ing\u00e9nieur d\u00e9sign\u00e9 supervise les homologations et veille \u00e0 ce que les deux contrats se rejoignent \u00e0 chaque \u00e9tape de transfert.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65d676d3 auto-p elementor-widget elementor-widget-heading\" data-id=\"65d676d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La valeur ajout\u00e9e de MegSolid dans cette structure r\u00e9side dans un ensemble d\u2019\u00e9quipements tra\u00e7able : donn\u00e9es de mod\u00e9lisation contr\u00f4l\u00e9es, exigences d\u2019interface, dossiers d\u2019usine, informations de contr\u00f4le c\u00f4t\u00e9 \u00e9quipement et assistance \u00e0 la mise en service incluse dans le p\u00e9rim\u00e8tre sign\u00e9. Les activit\u00e9s locales d\u2019ing\u00e9nierie et de construction restent clairement identifi\u00e9es. Elles ne doivent pas se fondre dans une vague notion de \u201c syst\u00e8me complet \u201d. Cette clart\u00e9 permet au service des achats de comparer le p\u00e9rim\u00e8tre r\u00e9el, \u00e0 l\u2019EPC de planifier ses travaux et aux \u00e9quipes charg\u00e9es des garanties de disposer des documents n\u00e9cessaires pour r\u00e9soudre un dysfonctionnement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d806ad47 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"d806ad47\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Cr\u00e9er une matrice DOR sp\u00e9cifique au projet<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ce9d5931 auto-p elementor-widget elementor-widget-heading\" data-id=\"ce9d5931\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Veuillez indiquer la gamme d'\u00e9quipements MegSolid propos\u00e9e, le point de livraison, le p\u00e9rim\u00e8tre du contrat EPC, la tension sur site, le calendrier de construction et les \u00e9tapes cl\u00e9s de r\u00e9ception. Le premier examen peut d\u00e9boucher sur une cartographie des responsabilit\u00e9s mettant en \u00e9vidence les interfaces ouvertes qui doivent \u00eatre r\u00e9solues avant la mise \u00e0 disposition des \u00e9quipements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-871784c5 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"871784c5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Consultez la matrice BESS DOR<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9944f6c3 auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"9944f6c3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f6efd160 elementor-widget elementor-widget-heading\" data-id=\"f6efd160\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4d081ee0 e-con-full e-flex e-con e-child\" data-id=\"4d081ee0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2339486a elementor-widget elementor-widget-n-accordion\" data-id=\"2339486a\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5900\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5900\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 1. Que signifie \u00ab BESS avec mobilier fourni par le propri\u00e9taire \u00bb ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5900\" class=\"elementor-element elementor-element-acb9a295 e-con-full e-flex e-con e-child\" data-id=\"acb9a295\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5900\" class=\"elementor-element elementor-element-426692a0 e-con-full e-flex e-con e-child\" data-id=\"426692a0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c85af22d elementor-widget elementor-widget-heading\" data-id=\"c85af22d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le ma\u00eetre d'ouvrage ach\u00e8te le mat\u00e9riel du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) directement aupr\u00e8s du fournisseur et le remet \u00e0 l'EPC en vue de son installation. Les contrats sign\u00e9s d\u00e9finissent pr\u00e9cis\u00e9ment le p\u00e9rim\u00e8tre des prestations, notamment le transport, le d\u00e9chargement, le stockage, la mise en service et la garantie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5901\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5901\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 2. Un contrat BESS avec mobilier fourni par le propri\u00e9taire correspond-il \u00e0 un contrat EPC \u00ab cl\u00e9 en main \u00bb ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5901\" class=\"elementor-element elementor-element-c363a857 e-con-full e-flex e-con e-child\" data-id=\"c363a857\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5901\" class=\"elementor-element elementor-element-621313d5 e-con-full e-flex e-con e-child\" data-id=\"621313d5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-96b2caf6 elementor-widget elementor-widget-heading\" data-id=\"96b2caf6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. Dans le cadre d'un contrat EPC \u00ab cl\u00e9 en main \u00bb, la fourniture des \u00e9quipements et les travaux de construction sont g\u00e9n\u00e9ralement regroup\u00e9s dans un seul contrat principal. Dans le cadre d'un contrat o\u00f9 le ma\u00eetre d'ouvrage fournit ses propres \u00e9quipements, la fourniture des \u00e9quipements et les travaux de construction font l'objet de contrats distincts ; le ma\u00eetre d'ouvrage assume donc une plus grande responsabilit\u00e9 en mati\u00e8re de coordination des interfaces.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5902\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5902\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 3. Qu'est-ce qu'une matrice de r\u00e9partition des responsabilit\u00e9s BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5902\" class=\"elementor-element elementor-element-be9870fc e-con-full e-flex e-con e-child\" data-id=\"be9870fc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5902\" class=\"elementor-element elementor-element-2cf6318c e-con-full e-flex e-con e-child\" data-id=\"2cf6318c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ba848c9c elementor-widget elementor-widget-heading\" data-id=\"ba848c9c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une matrice DOR r\u00e9partit chaque t\u00e2che du projet entre le ma\u00eetre d'ouvrage, le fournisseur du syst\u00e8me BESS, le ma\u00eetre d'\u0153uvre (EPC) et les autres sous-traitants. Le format RACI permet de d\u00e9terminer qui ex\u00e9cute la t\u00e2che, qui l'approuve, qui apporte son expertise technique et qui en est inform\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5903\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5903\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 4. Qui se charge g\u00e9n\u00e9ralement de d\u00e9charger un BESS fourni par le propri\u00e9taire ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5903\" class=\"elementor-element elementor-element-f0ddd31c e-con-full e-flex e-con e-child\" data-id=\"f0ddd31c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5903\" class=\"elementor-element elementor-element-8e75d455 e-con-full e-flex e-con e-child\" data-id=\"8e75d455\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-78bd901d elementor-widget elementor-widget-heading\" data-id=\"78bd901d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le contrat doit pr\u00e9voir explicitement les modalit\u00e9s de d\u00e9chargement. Le fournisseur fournit les informations approuv\u00e9es relatives au levage et \u00e0 la manutention. La partie charg\u00e9e de la logistique sur site fournit la grue, le mat\u00e9riel de levage, le personnel qualifi\u00e9 et le plan de levage, puis consigne l'\u00e9tat du mat\u00e9riel apr\u00e8s sa mise en place.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5904\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5904\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 5. Qui est charg\u00e9 de stocker le syst\u00e8me BESS avant son installation ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5904\" class=\"elementor-element elementor-element-d2ca44f8 e-con-full e-flex e-con e-child\" data-id=\"d2ca44f8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5904\" class=\"elementor-element elementor-element-899d3a91 e-con-full e-flex e-con e-child\" data-id=\"899d3a91\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c05cd47d elementor-widget elementor-widget-heading\" data-id=\"c05cd47d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le calendrier de livraison et de conservation attribue cette responsabilit\u00e9. Le fournisseur pr\u00e9cise les conditions de stockage et les contr\u00f4les requis ; le responsable du site d\u00e9sign\u00e9 les effectue et les consigne. Un simple bon de livraison ne suffit pas \u00e0 prouver que la conservation a \u00e9t\u00e9 effectu\u00e9e conform\u00e9ment aux exigences.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5905\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5905\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 6. Qui autorise la premi\u00e8re mise sous tension ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5905\" class=\"elementor-element elementor-element-a131c113 e-con-full e-flex e-con e-child\" data-id=\"a131c113\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5905\" class=\"elementor-element elementor-element-820a7492 e-con-full e-flex e-con e-child\" data-id=\"820a7492\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2540135a elementor-widget elementor-widget-heading\" data-id=\"2540135a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le fournisseur confirme que les \u00e9quipements relevant de sa responsabilit\u00e9 sont pr\u00eats, et le ma\u00eetre d'\u0153uvre (EPC) confirme que les installations \u00e9lectriques et les dispositifs de s\u00e9curit\u00e9 sur site sont pr\u00eats. Le ma\u00eetre d'ouvrage ou l'autorit\u00e9 d\u00e9sign\u00e9e d\u00e9livre l'autorisation finale de mise sous tension conform\u00e9ment \u00e0 la proc\u00e9dure de mise en service du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5906\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5906\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 7. La mise en service par le fournisseur rend-elle ce dernier responsable du c\u00e2blage EPC ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5906\" class=\"elementor-element elementor-element-7d7c0551 e-con-full e-flex e-con e-child\" data-id=\"7d7c0551\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5906\" class=\"elementor-element elementor-element-bd0a07a0 e-con-full e-flex e-con e-child\" data-id=\"bd0a07a0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-950f9df8 elementor-widget elementor-widget-heading\" data-id=\"950f9df8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. La pr\u00e9sence du fournisseur n'implique pas le transfert de la responsabilit\u00e9 du c\u00e2blage, de la protection, de la mise \u00e0 la terre ou des appareillages de commutation sur site, sauf indication contraire dans le cahier des charges sign\u00e9. La mise en service consiste \u00e0 v\u00e9rifier les \u00e9quipements d\u00e9finis et les interfaces fonctionnelles \u00e0 l'aide des justificatifs fournis par chaque partie responsable.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5907\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5907\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 8. Qui prend en charge un dysfonctionnement du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) d\u00fb \u00e0 une terminaison de c\u00e2ble incorrecte ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5907\" class=\"elementor-element elementor-element-396726d5 e-con-full e-flex e-con e-child\" data-id=\"396726d5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5907\" class=\"elementor-element elementor-element-88225ffe e-con-full e-flex e-con e-child\" data-id=\"88225ffe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-96e2eec0 elementor-widget elementor-widget-heading\" data-id=\"96e2eec0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le processus de contr\u00f4le de la qualit\u00e9 mis en place par l'EPC permet g\u00e9n\u00e9ralement de traiter les d\u00e9fauts de raccordement sur site. L'enqu\u00eate conjointe doit s'appuyer sur les relev\u00e9s de couple, les essais de c\u00e2bles, les journaux d'\u00e9v\u00e9nements et les preuves issues des inspections avant que la responsabilit\u00e9 ne soit attribu\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5908\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5908\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 9. \u00c0 quelle date la garantie des \u00e9quipements BESS doit-elle prendre effet ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5908\" class=\"elementor-element elementor-element-9ea4cad1 e-con-full e-flex e-con e-child\" data-id=\"9ea4cad1\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5908\" class=\"elementor-element elementor-element-719c78a7 e-con-full e-flex e-con e-child\" data-id=\"719c78a7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-58b9265c elementor-widget elementor-widget-heading\" data-id=\"58b9265c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le contrat de fourniture doit pr\u00e9ciser l'\u00e9tape d\u00e9terminante, telle que l'exp\u00e9dition, la livraison, la premi\u00e8re mise sous tension, la r\u00e9ception provisoire ou la mise en service commerciale. Il doit \u00e9galement traiter des retards imputables au ma\u00eetre d'ouvrage ou au contractant EPC, ainsi que du stockage prolong\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-5909\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-5909\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 10. Que se passe-t-il lorsqu\u2019un test d\u2019acceptation sur site \u00e9choue ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5909\" class=\"elementor-element elementor-element-7b6dcb4c e-con-full e-flex e-con e-child\" data-id=\"7b6dcb4c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-5909\" class=\"elementor-element elementor-element-253ae5c7 e-con-full e-flex e-con e-child\" data-id=\"253ae5c7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-10765296 elementor-widget elementor-widget-heading\" data-id=\"10765296\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La proc\u00e9dure approuv\u00e9e doit d\u00e9finir les modalit\u00e9s de collecte des preuves, la classification des d\u00e9fauts, les d\u00e9lais pour la mise en \u0153uvre des mesures correctives, les conditions de nouveaux essais et la r\u00e9partition des co\u00fbts. Le r\u00e9sultat doit \u00eatre \u00e9valu\u00e9 au niveau de la limite de mesure contractuelle et dans les conditions d'exploitation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-59010\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-59010\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 11. \u00c0 qui revient la garantie de performance PCC ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59010\" class=\"elementor-element elementor-element-c25cc46a e-con-full e-flex e-con e-child\" data-id=\"c25cc46a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59010\" class=\"elementor-element elementor-element-cfba8bc3 e-con-full e-flex e-con e-child\" data-id=\"cfba8bc3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4d83666e elementor-widget elementor-widget-heading\" data-id=\"4d83666e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les contrats doivent d\u00e9signer une partie responsable ou pr\u00e9voir un ensemble coordonn\u00e9 d'obligations r\u00e9ciproques. Les \u00e9quipements, les transformateurs, les c\u00e2bles, les installations auxiliaires et les syst\u00e8mes de contr\u00f4le du site ont tous une incidence sur les performances mesur\u00e9es au PCC.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-59011\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-59011\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 12. Quels documents doivent \u00eatre pr\u00eats avant l'exp\u00e9dition du BESS ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59011\" class=\"elementor-element elementor-element-aab6759f e-con-full e-flex e-con e-child\" data-id=\"aab6759f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59011\" class=\"elementor-element elementor-element-b02bc39a e-con-full e-flex e-con e-child\" data-id=\"b02bc39a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6476469e elementor-widget elementor-widget-heading\" data-id=\"6476469e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Vous devez au minimum remplir le tableau des \u00e9quipements approuv\u00e9s, les plans d'interface, la matrice DOR, la proc\u00e9dure de livraison, le programme de pr\u00e9paration du site, les conditions pr\u00e9alables \u00e0 la mise en service, le tableau des garanties et le p\u00e9rim\u00e8tre des essais de r\u00e9ception.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-59012\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-59012\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> 13. En quoi l'approvisionnement direct aupr\u00e8s du fabricant permet-il de lever les ambigu\u00eft\u00e9s li\u00e9es \u00e0 la garantie ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59012\" class=\"elementor-element elementor-element-f9bfaaf9 e-con-full e-flex e-con e-child\" data-id=\"f9bfaaf9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-59012\" class=\"elementor-element elementor-element-7a2c805c e-con-full e-flex e-con e-child\" data-id=\"7a2c805c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fc9e8723 elementor-widget elementor-widget-heading\" data-id=\"fc9e8723\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Dans le cadre d'un bon de commande contr\u00f4l\u00e9, l'approvisionnement direct aupr\u00e8s du fabricant garantit une configuration d'\u00e9quipement bien d\u00e9finie, des num\u00e9ros de s\u00e9rie tra\u00e7ables, des documents d'interface correspondants et un parcours de diagnostic c\u00f4t\u00e9 \u00e9quipement. Les dossiers de construction de l'EPC restent indispensables en cas de d\u00e9faillances au niveau de l'interface du site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Une m\u00e9thode, d\u00e9finie au niveau du contrat, visant \u00e0 r\u00e9partir les responsabilit\u00e9s en mati\u00e8re de livraison, de stockage, d'installation, de mise sous tension, de mise en service, d'essais de performance et de garantie du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) entre le propri\u00e9taire, le fournisseur d'\u00e9quipements et le ma\u00eetre d'\u0153uvre (EPC).<\/p>","protected":false},"author":4,"featured_media":5156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[27,1],"tags":[224,519,520,523,526,524,522,525],"class_list":["post-5159","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-bess","tag-bess-commissioning","tag-bess-epc","tag-bess-installation","tag-bess-warranty","tag-dor","tag-epc-scope","tag-owner-furnished-bess","tag-responsibility-matrix"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=5159"}],"version-history":[{"count":6,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5159\/revisions"}],"predecessor-version":[{"id":5174,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5159\/revisions\/5174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/5156"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=5159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=5159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=5159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}