{"id":5284,"date":"2026-09-08T17:36:49","date_gmt":"2026-09-08T09:36:49","guid":{"rendered":"https:\/\/www.solidess.com\/?p=5284"},"modified":"2026-10-13T21:05:46","modified_gmt":"2026-10-13T13:05:46","slug":"armoires-de-stockage-denergie-pour-sites-ci-neerlandais-a-espace-limite","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/energy-storage-cabinet-space-constrained-dutch-ci-sites\/","title":{"rendered":"Armoire de stockage d'\u00e9nergie pour les sites n\u00e9erlandais C&amp;I \u00e0 espace restreint : 215 kWh, 261 kWh ou BESS en conteneur ?"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5284\" class=\"elementor elementor-5284\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a24402a4 auto-p elementor-widget elementor-widget-heading\" data-id=\"a24402a4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">A cabinet that fits the drawing can still block the service door or consume the only usable loading area. MegSolid Energon puts 261.24 kWh nominal energy in a 1300 \u00d7 1350 mm equipment base, while <a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-en-armoire-exterieure\/\">ESSA0100B-0215<\/a> provides the 100 kW \/ 215.04 kWh air-cooled cabinet. The installed space must also allow access, cooling and the applicable safety separation. Share the marked site plan and AC duty to compare the actual cabinet layout before committing your scarce floor area.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1d63e8eb auto-p elementor-widget elementor-widget-heading\" data-id=\"1d63e8eb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ce n'est plus seulement la batterie qui co\u00fbte cher.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-efa5bc66 auto-p elementor-widget elementor-widget-heading\" data-id=\"efa5bc66\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Avant de comparer les mod\u00e8les d\u2019armoires, d\u00e9limitez l\u2019espace d\u2019installation utile qui reste une fois pris en compte l\u2019acc\u00e8s pour la maintenance, les mesures de s\u00e9curit\u00e9 incendie, les issues de secours, les contraintes structurelles et les contraintes logistiques d\u2019installation. Des produits qui correspondent aux dimensions de base peuvent tout de m\u00eame ne pas convenir au site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-600db4fe auto-p elementor-widget elementor-widget-heading\" data-id=\"600db4fe\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La question \u00e0 se poser lors de l'achat ne se r\u00e9sume pas simplement \u00e0 savoir combien de kWh l'appareil peut contenir.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-400b760f auto-p elementor-widget elementor-widget-heading\" data-id=\"400b760f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>Quel format physique du BESS reste-t-il valable une fois que les limites r\u00e9elles du site ont \u00e9t\u00e9 d\u00e9finies ?<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-204dd244 auto-image elementor-widget elementor-widget-image\" data-id=\"204dd244\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5281\" alt=\"Armoires de stockage d&#039;\u00e9nergie MegSolid ESSA et Energon sur un site commercial et industriel de Rotterdam o\u00f9 l&#039;espace est limit\u00e9\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites.jpg 1254w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-300x300.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-1024x1024.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-150x150.jpg 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-768x768.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-12x12.jpg 12w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-600x600.jpg 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Energy-Storage-for-Space-Constrained-Dutch-CI-Sites-100x100.jpg 100w\" sizes=\"(max-width: 1254px) 100vw, 1254px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ff78cdc1 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ff78cdc1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">La d\u00e9limitation du site est soumise au Conseil des ministres<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9642f02f auto-p elementor-widget elementor-widget-heading\" data-id=\"9642f02f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les plans techniques peuvent donner l'impression qu'un chantier exigu est plus facile \u00e0 g\u00e9rer qu'il ne l'est en r\u00e9alit\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-81a622d9 auto-p elementor-widget elementor-widget-heading\" data-id=\"81a622d9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La largeur \u00d7 la profondeur de l'armoire ne correspondent qu'\u00e0 la surface au sol de l'\u00e9quipement. L'emplacement doit \u00e9galement tenir compte de l'ouverture des portes, de l'acc\u00e8s des techniciens, des besoins en refroidissement, du passage des c\u00e2bles, des s\u00e9parations coupe-feu, des acc\u00e8s d'urgence et d'un \u00e9ventuel remplacement futur.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b220f0de auto-table elementor-widget elementor-widget-text-editor\" data-id=\"b220f0de\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>P\u00e9rim\u00e8tre d'am\u00e9nagement<\/th><th>Ce qu'il comprend<\/th><\/tr><\/thead><tbody><tr><td>Surface de la base du meuble<\/td><td>Largeur \u00d7 profondeur de l'appareil uniquement<\/td><\/tr><tr><td>Zone des armoires install\u00e9es<\/td><td>Armoire + portes + acc\u00e8s technique + exigences en mati\u00e8re de refroidissement<\/td><\/tr><tr><td>Am\u00e9nagement anti-incendie<\/td><td>Ajoute une s\u00e9paration sp\u00e9cifique au projet et un acc\u00e8s d'urgence<\/td><\/tr><tr><td>Empreinte du site<\/td><td>Zone qui ne peut plus \u00eatre utilis\u00e9e pour la production, le stationnement, la circulation ou la logistique<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-13e6fbc6 auto-p elementor-widget elementor-widget-heading\" data-id=\"13e6fbc6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les mod\u00e8les de s\u00e9lection utiles peuvent \u00eatre anonymes tout en restant mesurables. Prenons l'exemple d'un <strong>Site logistique de Rotterdam \u00e0 titre d'exemple, il ne s'agit pas d'une \u00e9tude de cas du projet MegSolid<\/strong>: la seule piste en plein air est <strong>2,4 m de large \u00d7 7,5 m de long<\/strong>, le tableau \u00e9lectrique existant de 400 V est <strong>\u00e0 18 m de l\u00e0, en suivant le trac\u00e9 pratique du c\u00e2ble<\/strong>, et le troisi\u00e8me emplacement d\u2019\u00e9quipement empi\u00e9terait sur la voie d\u2019acc\u00e8s pour les pompiers et les secours. Ces informations suffisent \u00e0 \u00e9carter toute comparaison bas\u00e9e uniquement sur le catalogue. Le nombre d\u00e9finitif d\u2019armoires d\u00e9pendra encore des d\u00e9gagements techniques et anti-incendie approuv\u00e9s, mais le projet peut d\u00e9sormais tenir compte de cette contrainte li\u00e9e au site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d37db6aa auto-p elementor-widget elementor-widget-heading\" data-id=\"d37db6aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'Energon 261 illustre clairement le probl\u00e8me li\u00e9 \u00e0 la surface de base. Le volume de son bo\u00eetier est d'environ <strong>1 300 \u00d7 1 350 \u00d7 2 200 mm<\/strong>, ce qui donne une surface de base du meuble d'environ <strong>1,76 m\u00b2<\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c96d86eb auto-p elementor-widget elementor-widget-heading\" data-id=\"c96d86eb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">C'est vrai que <strong>pas<\/strong> ce qui signifie que le projet n'occupe que 1,76 m\u00b2.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c5a0afaa auto-p elementor-widget elementor-widget-heading\" data-id=\"c5a0afaa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'acc\u00e8s pour la maintenance, le sens d'ouverture des portes, les interfaces de c\u00e2blage, le refroidissement, l'acc\u00e8s en cas d'urgence et les exigences applicables en mati\u00e8re de s\u00e9curit\u00e9 incendie augmentent la surface r\u00e9elle occup\u00e9e par l'installation. Chaque armoire et chaque conteneur est confront\u00e9 \u00e0 ce m\u00eame probl\u00e8me d'encombrement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d434ba1d auto-p elementor-widget elementor-widget-heading\" data-id=\"d434ba1d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les projets n\u00e9erlandais doivent \u00e9galement int\u00e9grer la s\u00e9curit\u00e9 incendie d\u00e8s la phase de conception, plut\u00f4t que de la consid\u00e9rer comme un \u00e9l\u00e9ment ajout\u00e9 apr\u00e8s coup. <a href=\"https:\/\/publicatiereeksgevaarlijkestoffen.nl\/publicaties\/online\/pgs-37-1\/2023\/1-1-april-2026\" target=\"_blank\" rel=\"noopener\">PGS 37-1:2023 version 1.1<\/a> a \u00e9t\u00e9 publi\u00e9 en avril 2026 et adopte une approche fond\u00e9e sur les risques concernant les syst\u00e8mes de stockage d'\u00e9nergie au lithium.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6caa528a auto-p elementor-widget elementor-widget-heading\" data-id=\"6caa528a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le crit\u00e8re d'achat pertinent est la surface utile commerciale perdue en raison de la configuration approuv\u00e9e du syst\u00e8me BESS, et non la largeur des armoires en soi.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-03aefc98 auto-image elementor-widget elementor-widget-image\" data-id=\"03aefc98\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5283\" alt=\"Sch\u00e9ma illustratif d&#039;un syst\u00e8me BESS \u00e0 Rotterdam pr\u00e9sentant la surface au sol de l&#039;armoire, la zone de desserte install\u00e9e, le trac\u00e9 des c\u00e2bles et le p\u00e9rim\u00e8tre d&#039;acc\u00e8s des pompiers\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Installed-Zone-Is-Bigger-Than-the-Cabinet-Base-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3c38784c auto-h2 elementor-widget elementor-widget-heading\" data-id=\"3c38784c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Le format du produit vient apr\u00e8s la limite<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3d76510b auto-p elementor-widget elementor-widget-heading\" data-id=\"3d76510b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une fois que l'on conna\u00eet la surface utile, le tableau des mod\u00e8les prend tout son sens.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-99596cd5 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"99596cd5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>\u00c9tat du site<\/th><th>Gamme de produits MegSolid<\/th><th>Note publi\u00e9e<\/th><th>Contr\u00f4le physique des achats<\/th><\/tr><\/thead><tbody><tr><td>Environ 200 kWh de charge utile et une zone de desserte suffisante reste disponible<\/td><td><strong>ESSA0100B-0215<\/strong><\/td><td>100 kW \/ 215,04 kWh<\/td><td>base d'armoire de 2 450 \u00d7 1 550 mm ; <strong>3 900 kg de poids net<\/strong>; v\u00e9rifier le service et la zone d'intervention en cas d'incendie<\/td><\/tr><tr><td>C'est un projet de grande envergure, mais chaque poste suppl\u00e9mentaire co\u00fbte cher<\/td><td><strong>Energon 261<\/strong><\/td><td>125 kVA \/ 261,24 kWh<\/td><td>Socle de 1 300 \u00d7 1 350 mm ; refroidissement par liquide ; <strong>le poids du mod\u00e8le indiqu\u00e9 doit \u00eatre v\u00e9rifi\u00e9 dans la fiche technique certifi\u00e9e<\/strong><\/td><\/tr><tr><td>Le projet a \u00e9volu\u00e9 vers environ 1 MWh et une zone d'installation de 6 m ; un acc\u00e8s par ascenseur et une capacit\u00e9 BT sont disponibles.<\/td><td><strong>ESSC0500B-1075<\/strong><\/td><td>500 kW \/ 1,0752 MWh<\/td><td>classe des 6 m, 21 t, 722 A<\/td><\/tr><tr><td>Le projet n\u00e9cessite environ 2 MWh et peut r\u00e9ellement s'adapter \u00e0 un cadre logistique plus large.<\/td><td><strong>ESSC1000B-2150<\/strong><\/td><td>1 MW \/ 2,1504 MWh<\/td><td>classe des 12 m, 38 t, 1 445 A<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6b17a9b1 auto-p elementor-widget elementor-widget-heading\" data-id=\"6b17a9b1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le premier crit\u00e8re est d'ordre physique : quels formats peuvent encore s'int\u00e9grer dans les limites du plan d'ensemble du site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-683760d2 auto-p elementor-widget elementor-widget-heading\" data-id=\"683760d2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les besoins d'environ 200 kWh peuvent rester avec <strong>ESSA0100B-0215<\/strong> lorsque l'espace technique et l'espace r\u00e9serv\u00e9 aux extincteurs sont encore disponibles. Les projets \u00e0 l'\u00e9chelle d'une armoire deviennent plus int\u00e9ressants pour <strong>Energon 261<\/strong> lorsque chaque nouvel emplacement d'\u00e9quipement commence \u00e0 empi\u00e9ter sur l'espace commercial utile. Les syst\u00e8mes de stockage d'\u00e9nergie (ESS) en conteneur ne deviennent pertinents que lorsque le projet dispose d'un espace suffisant pour l'enceinte, l'acc\u00e8s des grues, les voies d'entretien et la classe de courant \u00e9lectrique correspondante.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec2b66a9 auto-p elementor-widget elementor-widget-heading\" data-id=\"ec2b66a9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-choisir-entre-un-stockage-par-batterie-commercial-bess-de-215-kwh-et-de-261-kwh\/\" target=\"_blank\" style=\"color:#61ce70\">215 kWh contre 261 kWh (BESS)<\/a><\/strong> La comparaison ne prend tout son sens qu\u2019une fois que les limites de l\u2019agencement physique sont fix\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-57b247e8 auto-image elementor-widget elementor-widget-image\" data-id=\"57b247e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5282\" alt=\"Comparaison entre les solutions MegSolid ESSA0100B-0215, Energon 261 et les syst\u00e8mes de stockage d&#039;\u00e9nergie par batterie (BESS) en conteneur pour les sites n\u00e9erlandais C&amp;I \u00e0 espace restreint\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Which-Product-Path-Survives-the-Site-Boundary-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a851f457 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a851f457\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">L'ESSA s'adapte toujours aux espaces de service existants<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-47658d33 auto-p elementor-widget elementor-widget-heading\" data-id=\"47658d33\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le fait de disposer d'un espace limit\u00e9 ne signifie pas pour autant que le refroidissement par liquide soit automatiquement la meilleure option.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-32a39088 auto-p elementor-widget elementor-widget-heading\" data-id=\"32a39088\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les sites industriels n\u00e9erlandais disposant d'une bande ext\u00e9rieure utilisable pour l'\u00e9quipement, ayant des besoins de stockage mod\u00e9r\u00e9s et offrant un acc\u00e8s suffisant pour la maintenance pourraient \u00eatre mieux desservis par le <strong>ESSA0100B-0215<\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae2f54e6 auto-p elementor-widget elementor-widget-heading\" data-id=\"ae2f54e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ce produit offre :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5d335415 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"5d335415\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Puissance nominale de 100 kW<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>215,04 kWh d'\u00e9nergie nominale<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Bo\u00eetier IP54<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>refroidissement par air intelligent<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>EMS int\u00e9gr\u00e9<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>transformateur d'isolement int\u00e9gr\u00e9<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3158da0a auto-p elementor-widget elementor-widget-heading\" data-id=\"3158da0a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces sp\u00e9cifications sont importantes car, dans le cadre d'un approvisionnement soumis \u00e0 des contraintes d'espace, il ne s'agit pas d'une course \u00e0 la maximisation du nombre de kWh par armoire.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-54fba734 auto-p elementor-widget elementor-widget-heading\" data-id=\"54fba734\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les sites pouvant accueillir sans difficult\u00e9 une armoire de 215 kWh n\u2019ont pas besoin de cr\u00e9er un probl\u00e8me de densit\u00e9 l\u00e0 o\u00f9 il n\u2019en existe pas. Le mod\u00e8le ESSA0100B-0215 permet de maintenir le projet dans la cat\u00e9gorie des armoires d\u2019ext\u00e9rieur classiques tout en offrant une solution de stockage int\u00e9gr\u00e9e C&amp;I.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7f620583 auto-p elementor-widget elementor-widget-heading\" data-id=\"7f620583\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une seule installation sur un mur ext\u00e9rieur peut suffire pour une petite usine. Dans ce cas, l'utilisation d'armoires plus puissantes et d'un syst\u00e8me de refroidissement par liquide pourrait ajouter de la complexit\u00e9 sans pour autant am\u00e9liorer le r\u00e9sultat d'exploitation du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-49c2238e auto-p elementor-widget elementor-widget-heading\" data-id=\"49c2238e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'ESSA devient int\u00e9ressante lorsque le client accorde de l'importance \u00e0 :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d005d3ed elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d005d3ed\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">une charge \u00e9nerg\u00e9tique C&amp;I mod\u00e9r\u00e9e ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">un espace de service ext\u00e9rieur suffisant ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">une architecture de refroidissement plus simple ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">syst\u00e8me de gestion environnementale int\u00e9gr\u00e9 ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">transformateur d'isolement int\u00e9gr\u00e9 ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">\u00e9viter la mise en place d'une installation en conteneurs de plus grande envergure.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f745e335 auto-p elementor-widget elementor-widget-heading\" data-id=\"f745e335\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-selectionner-un-systeme-de-stockage-denergie-par-batterie-bess-exterieur-de-100-kw-215-kwh-pour-un-site-commercial-et-industriel-ci\/\" target=\"_blank\" style=\"color:#61ce70\">Syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) ext\u00e9rieur de 100 kW \/ 215 kWh<\/a><\/strong> reste une solution tout \u00e0 fait adapt\u00e9e lorsque l'espace disponible sur le site le permet et que les besoins ne justifient pas l'utilisation d'une armoire plus compacte.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-16a9a398 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"16a9a398\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Energon 261 s'impose alors que les postes minist\u00e9riels deviennent co\u00fbteux<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5f29f85e auto-p elementor-widget elementor-widget-heading\" data-id=\"5f29f85e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les arguments en faveur de <strong>Energon 261<\/strong> s'accentue lorsque chaque poste suppl\u00e9mentaire au sein du gouvernement prive le site de quelque chose qui lui tient \u00e0 c\u0153ur.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-23c4c1a7 auto-p elementor-widget elementor-widget-heading\" data-id=\"23c4c1a7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Revenons \u00e0 la bande de protection de Rotterdam, large de 2,4 m. Une armoire pourrait passer l'examen technique et l'\u00e9valuation des risques d'incendie, et une deuxi\u00e8me pourrait encore \u00eatre utilisable en fonction des distances de s\u00e9curit\u00e9 approuv\u00e9es. On sait d\u00e9j\u00e0 que la troisi\u00e8me position entre en conflit avec la limite d'acc\u00e8s d'urgence. \u00c0 ce stade, le nombre d'armoires a un co\u00fbt qui appara\u00eet clairement sur le plan de site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f8a11ae2 auto-p elementor-widget elementor-widget-heading\" data-id=\"f8a11ae2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Lorsque les places dans les armoires sont limit\u00e9es, comparez le nombre de places approuv\u00e9es que n\u00e9cessite l'objectif \u00e9nerg\u00e9tique fix\u00e9, plut\u00f4t que de vous limiter \u00e0 la comparaison entre 215,04 kWh et 261,24 kWh.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3d18e89 auto-p elementor-widget elementor-widget-heading\" data-id=\"c3d18e89\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon 261 offre :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9acdba78 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"9acdba78\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>261,24 kWh d'\u00e9nergie nominale<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>125 kVA<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>refroidissement liquide<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">published \u221220 to +55\u00b0C operating range, with derating above 45\u00b0C; obtain the available-power curve for the site<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">prise en charge de <strong>jusqu'\u00e0 10 unit\u00e9s en parall\u00e8le<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">enveloppe du meuble d'environ <strong>1 300 \u00d7 1 350 \u00d7 2 200 mm<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-06d52266 auto-p elementor-widget elementor-widget-heading\" data-id=\"06d52266\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Chaque emplacement Energon offre une capacit\u00e9 \u00e9nerg\u00e9tique nominale sup\u00e9rieure. Cela permet de limiter la n\u00e9cessit\u00e9 d'ajouter sans cesse de nouveaux emplacements d'\u00e9quipement pour r\u00e9pondre aux m\u00eames besoins globaux du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a91a3667 auto-p elementor-widget elementor-widget-heading\" data-id=\"a91a3667\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le refroidissement par liquide prend toute son importance lorsque l'espace disponible sur site est limit\u00e9 et que les contraintes thermiques sont \u00e9lev\u00e9es. Le refroidissement par air reste une solution pertinente pour les projets de moindre envergure ou moins exigeants sur le plan thermique, \u00e0 condition de disposer d'un d\u00e9bit d'air suffisant et d'un espace d'intervention ad\u00e9quat. Le refroidissement par liquide justifie sa complexit\u00e9 suppl\u00e9mentaire lorsque le nombre d'armoires, la gestion thermique et un taux d'utilisation \u00e9lev\u00e9 commencent \u00e0 influencer l'agencement du site.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-91653ce6 auto-p elementor-widget elementor-widget-heading\" data-id=\"91653ce6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il faut tout de m\u00eame comparer l'empreinte au sol en se basant sur les m\u00eames limites. L'Energon 261 ne devrait pas \u00eatre commercialis\u00e9 en donnant l'impression que la surface de base de son caisson, qui est de 1,76 m\u00b2, correspond \u00e0 l'empreinte au sol totale du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3045194a auto-p elementor-widget elementor-widget-heading\" data-id=\"3045194a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-des-rfq-pour-le-systeme-de-stockage-denergie-refroidi-par-liquide-de-261-kwh\/\" target=\"_blank\" style=\"color:#61ce70\">Syst\u00e8me de stockage d'\u00e9nergie \u00e0 refroidissement par liquide de 261 kWh<\/a><\/strong> devient un autre mode d'approvisionnement physique d\u00e8s lors que l'espace lui-m\u00eame rev\u00eat une valeur mon\u00e9taire.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb68be5e auto-p elementor-widget elementor-widget-heading\" data-id=\"bb68be5e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>Indiquez les limites du site sur trois lignes :<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a03903da elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"a03903da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Surface d'installation disponible :<\/strong> L \u00d7 l \u00d7 hauteur libre, int\u00e9rieur \/ toit \/ ext\u00e9rieur, ainsi que la charge admissible au sol ou sur le toit.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Fonctionnement \u00e9lectrique :<\/strong> distance par rapport au tableau \u00e9lectrique 400 V existant, courant nominal du tableau, puissance cible en kW et consommation \u00e9nerg\u00e9tique journali\u00e8re li\u00e9e aux cycles de fonctionnement.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Limites du p\u00e9rim\u00e8tre d'approbation :<\/strong> Qui est responsable de l'examen PGS\/incendie : la municipalit\u00e9\/le service de l'environnement, la r\u00e9gion de s\u00e9curit\u00e9, l'assureur ou l'EPC local ?.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a7739060 auto-p elementor-widget elementor-widget-heading\" data-id=\"a7739060\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Demandez la r\u00e9ponse sur le <strong>m\u00eame p\u00e9rim\u00e8tre d'empreinte<\/strong>: un ESSA, une ou deux armoires Energon, et s'il convient de supprimer l'ESSC avant la conception d\u00e9taill\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-642d3afb elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"642d3afb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Check My Cabinet Layout<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dfb73361 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"dfb73361\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Les contraintes li\u00e9es aux espaces int\u00e9rieurs, aux toits, aux h\u00f4tels et aux parkings sont diff\u00e9rentes<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-78ac83bc auto-p elementor-widget elementor-widget-heading\" data-id=\"78ac83bc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un m\u00eame meuble peut tr\u00e8s bien fonctionner \u00e0 un endroit et ne pas fonctionner du tout \u00e0 un autre.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-587629f0 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"587629f0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Salle des plantes d'int\u00e9rieur<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-331645a2 auto-p elementor-widget elementor-widget-heading\" data-id=\"331645a2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'espace d\u00e9di\u00e9 aux locaux techniques int\u00e9rieurs repr\u00e9sente souvent le co\u00fbt d'opportunit\u00e9 le plus \u00e9lev\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d4dc8939 auto-p elementor-widget elementor-widget-heading\" data-id=\"d4dc8939\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'espace de production transform\u00e9 en local de stockage des batteries n'est plus disponible pour la production, le stockage des stocks ou l'installation future d'\u00e9quipements. Les all\u00e9es de service et les cloisons coupe-feu \u00e9tendent cette perte au-del\u00e0 de la base des armoires.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-df52264c auto-p elementor-widget elementor-widget-heading\" data-id=\"df52264c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La capacit\u00e9 structurelle peut constituer une contrainte plus pr\u00e9coce que la superficie. Il convient de v\u00e9rifier les planchers existants au regard du poids des \u00e9quipements, des charges concentr\u00e9es, des exigences en mati\u00e8re d'armature et de l'acc\u00e8s pour le levage avant de consid\u00e9rer qu'un emplacement d'armoire est utilisable.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7d38a89d auto-p elementor-widget elementor-widget-heading\" data-id=\"7d38a89d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">For the ESSA0100B-0215, MegSolid publishes a <strong>3 900 kg de poids net<\/strong> et un gabarit d'enceinte de 2 450 \u00d7 1 550 mm. En divisant le poids par la surface totale de la base de l'enceinte, on obtient une moyenne de filtrage simple d'environ <strong>1 027 kg\/m\u00b2, soit 10,1 kN\/m\u00b2<\/strong>. C'est-\u00e0-dire <strong>pas<\/strong> une charge de calcul structurel : les pieds d'appui, les rails de base et les r\u00e9actions locales peuvent g\u00e9n\u00e9rer des charges concentr\u00e9es bien plus \u00e9lev\u00e9es ; l'ing\u00e9nieur en structure a donc toujours besoin de conna\u00eetre la disposition des points d'appui et les r\u00e9actions.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-12b76bfc auto-p elementor-widget elementor-widget-heading\" data-id=\"12b76bfc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les locaux techniques \u00e9troits ne peuvent favoriser l'installation d'une armoire \u00e0 plus forte consommation d'\u00e9nergie que si la structure, les voies d'acc\u00e8s pour la maintenance et la configuration en cas d'incendie sont \u00e9galement adapt\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0eb21389 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"0eb21389\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Toit-terrasse<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a8432b83 auto-p elementor-widget elementor-widget-heading\" data-id=\"a8432b83\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'espace sous les toits peut sembler libre jusqu'\u00e0 ce que les travaux de structure et d'acc\u00e8s commencent.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fcc05ee3 auto-p elementor-widget elementor-widget-heading\" data-id=\"fcc05ee3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le projet doit tenir compte des \u00e9l\u00e9ments suivants :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c6fd4e74 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"c6fd4e74\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">poids de la batterie ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">charge structurelle concentr\u00e9e ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">renfort ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">halt\u00e9rophilie ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">acc\u00e8s au toit ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">voies d'\u00e9vacuation en cas d'incendie ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">exposition aux intemp\u00e9ries ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">entretien et remplacement futurs.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a9979b0 auto-p elementor-widget elementor-widget-heading\" data-id=\"9a9979b0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le poids peut imposer des contraintes au toit avant m\u00eame que l'empreinte au sol ne le fasse.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f3ef4623 auto-p elementor-widget elementor-widget-heading\" data-id=\"f3ef4623\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le ESSA0100B-0215 peut \u00eatre s\u00e9lectionn\u00e9 \u00e0 l'aide de ses caract\u00e9ristiques techniques publi\u00e9es <strong>3 900 kg<\/strong> masse nette, mais l\u2019Energon 261 a besoin d\u2019un point de r\u00e9f\u00e9rence. La page publique actuelle d\u2019Energon sur MegSolid indique les dimensions de 1 300 \u00d7 1 350 \u00d7 2 200 mm, mais ne pr\u00e9cise pas la <strong>Poids (kg)<\/strong> champ sans valeur. Les donn\u00e9es g\u00e9n\u00e9riques de \u201c classe T 2,5 \u201d provenant d'une autre armoire de 261 kWh ne doivent pas \u00eatre reprises dans un calcul structurel.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-70d33036 auto-p elementor-widget elementor-widget-heading\" data-id=\"70d33036\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Avant la publication d'une offre Energon pour une installation sur toiture, le devis ou la fiche technique valid\u00e9e doit pr\u00e9ciser <strong>masse en service, masse de transport, centre de gravit\u00e9, points de levage, g\u00e9om\u00e9trie du ch\u00e2ssis de base\/des supports et r\u00e9actions d'appui<\/strong>. L'analyse de la toiture doit permettre de distinguer une simple valeur de v\u00e9rification sur une surface r\u00e9partie des charges concentr\u00e9es r\u00e9elles transmises aux poutres, aux lisses ou aux cadres de soutien.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-257500cc auto-h3 elementor-widget elementor-widget-heading\" data-id=\"257500cc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">H\u00f4tel<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-215b8064 auto-p elementor-widget elementor-widget-heading\" data-id=\"215b8064\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les h\u00f4tels peuvent refuser un poste au sein du gouvernement pour des raisons qui n'ont pratiquement aucune importance dans un entrep\u00f4t frigorifique. <strong>Mesures acoustiques nocturnes au niveau des fa\u00e7ades des chambres d'h\u00f4tel<\/strong> peut constituer une contrainte, tandis que les \u00e9quipements install\u00e9s sur le toit ou dans la cour peuvent \u00e9galement se trouver directement dans le champ de vision des clients. Il n'est pas possible d'ajouter \u00e0 la l\u00e9g\u00e8re des \u00e9crans acoustiques ou visuels s'ils entravent la circulation de l'air de refroidissement, l'acc\u00e8s pour l'entretien ou l'issue de secours convenue.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-370ad6ab auto-p elementor-widget elementor-widget-heading\" data-id=\"370ad6ab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les plans de l\u2019h\u00f4tel doivent indiquer la prise la plus proche de la chambre, le mode de fonctionnement nocturne pr\u00e9vu, le parcours de service et tout obstacle visuel avant que l\u2019emplacement de l\u2019armoire ne soit consid\u00e9r\u00e9 comme disponible.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3db46be auto-h3 elementor-widget elementor-widget-heading\" data-id=\"d3db46be\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Immeuble \u00e0 usage mixte ou parking souterrain<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ec2c42ae auto-p elementor-widget elementor-widget-heading\" data-id=\"ec2c42ae\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les sites \u00e0 usage mixte pr\u00e9sentent d'autres motifs de rejet. Un parking souterrain peut disposer d'une superficie suffisante, mais ne pas r\u00e9pondre aux crit\u00e8res requis en mati\u00e8re de <strong>hauteur libre, acc\u00e8s par rampe et par ascenseur, protection contre les chocs de v\u00e9hicules, voies d'\u00e9vacuation, circulation de la fum\u00e9e ou limites des compartiments coupe-feu<\/strong>. Les portes de placard qui s'ouvrent sur un couloir peuvent transformer un espace aux dimensions ad\u00e9quates en un espace inutilisable.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-390f00e3 auto-p elementor-widget elementor-widget-heading\" data-id=\"390f00e3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'\u00e9tude d'implantation devrait distinguer les contraintes li\u00e9es aux h\u00f4tels et aux projets \u00e0 usage mixte de celles relatives aux parcs logistiques, au lieu de consid\u00e9rer chaque site C&amp;I comme une seule et m\u00eame bande en plein air.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-09ab5393 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"09ab5393\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Parking ext\u00e9rieur ou aire de service<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65897af0 auto-p elementor-widget elementor-widget-heading\" data-id=\"65897af0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'installation en ext\u00e9rieur permet de gagner de la place dans l'usine, mais les terrains ext\u00e9rieurs sont rarement disponibles gratuitement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7ed1b710 auto-p elementor-widget elementor-widget-heading\" data-id=\"7ed1b710\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une armoire peut occuper le seul emplacement pratique \u00e0 proximit\u00e9 du tableau \u00e9lectrique. La pr\u00e9sence de plusieurs armoires peut g\u00eaner la circulation des camions de livraison, les obligations de stationnement ou l'acc\u00e8s aux issues de secours. Les syst\u00e8mes en conteneurs n\u00e9cessitent un espace de levage et de man\u0153uvre plus important que ne le laissent supposer leurs dimensions de base.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7218dbe5 auto-p elementor-widget elementor-widget-heading\" data-id=\"7218dbe5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La norme PGS 37-1 est l'une des raisons pour lesquelles cet examen doit intervenir d\u00e8s le d\u00e9but d'un projet n\u00e9erlandais : les dimensions de l'armoire ne suffisent pas \u00e0 elles seules \u00e0 d\u00e9finir une configuration acceptable pour le stockage du lithium.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6f85a661 auto-p elementor-widget elementor-widget-heading\" data-id=\"6f85a661\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le meilleur emplacement est celui qui permet de conserver le <strong>l'ensemble du projet<\/strong> \u00e9conomique, et non pas celui qui semble le moins cher au m\u00e8tre carr\u00e9 sur un plan.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4a3da4f1 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"4a3da4f1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Le processus d'homologation n\u00e9erlandais doit d\u00e9signer des responsables<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1530bbe9 auto-p elementor-widget elementor-widget-heading\" data-id=\"1530bbe9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le document PGS 37-1 constitue une r\u00e9f\u00e9rence importante en mati\u00e8re de conception, mais le fait de citer ce document ne revient pas \u00e0 d\u00e9finir la proc\u00e9dure d'homologation n\u00e9erlandaise. Les directives n\u00e9erlandaises actuelles provenant de <a href=\"https:\/\/iplo.nl\/thema\/externe-veiligheid\/publicatiereeks-gevaarlijke-stoffen-pgs\/pgs-37-1-37-2\/\" target=\"_blank\" rel=\"noopener\">IPLO<\/a> note que l'exploitation d'un EOS n'est pas encore class\u00e9e de mani\u00e8re autonome comme \u00ab activit\u00e9 ayant un impact sur l'environnement \u00bb dans le BAL ; jusqu'\u00e0 l'entr\u00e9e en vigueur de la modification pr\u00e9vue du BAL, la proc\u00e9dure d\u00e9pend en partie de l'activit\u00e9 concern\u00e9e et du plan d'am\u00e9nagement local.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ab63ace3 auto-p elementor-widget elementor-widget-heading\" data-id=\"ab63ace3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Dans le cadre d'un projet C&amp;I classique, veillez \u00e0 faire figurer ces parties sur la fiche de responsabilit\u00e9 avant que la mise en page ne soit valid\u00e9e :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d89725ba elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d89725ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Autorit\u00e9 comp\u00e9tente :<\/strong> <a href=\"https:\/\/iplo.nl\/regelgeving\/instrumenten\/vergunningverlening-toezicht-handhaving\/bevoegd-gezag-omgevingswet\/milieubelastende-activiteit\/\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">L'IPLO pr\u00e9cise que la commune est g\u00e9n\u00e9ralement l'autorit\u00e9 comp\u00e9tente<\/a> pour les activit\u00e9s environnementales relevant de la comp\u00e9tence de Bal, bien qu\u2019une province ou un ministre puisse \u00eatre l\u2019autorit\u00e9 comp\u00e9tente dans certains cas complexes sp\u00e9cifiques.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Service de l'environnement :<\/strong> peut se charger, pour le compte de l\u2019autorit\u00e9 comp\u00e9tente, des d\u00e9marches relatives aux autorisations et aux \u00e9tudes d\u2019impact environnemental ; il convient de v\u00e9rifier la proc\u00e9dure locale plut\u00f4t que de partir du principe que chaque commune traite le dossier directement.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>R\u00e9gion de s\u00e9curit\u00e9 \/ pompiers :<\/strong> peut conseiller la municipalit\u00e9 en mati\u00e8re de s\u00e9curit\u00e9 externe, de choix d'implantation et de gestion des incidents. Le NIPV d\u00e9crit ce r\u00f4le consultatif pour les projets EOS ; dans la r\u00e9gion de Rotterdam, l'acheteur doit v\u00e9rifier si <strong>R\u00e9gion de s\u00e9curit\u00e9 de Rotterdam-Rijnmond<\/strong> doit examiner l'emplacement propos\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Assureur :<\/strong> consultez l'assureur avant que l'empreinte ne soit fig\u00e9e. <a href=\"https:\/\/www.verzekeraars.nl\/verzekeringsthemas\/schade\/voorkom-schade-tips-tools-en-brochures\/energie-opslag-systemen-brochure\" target=\"_blank\" style=\"color:#61CE70\" rel=\"noopener\">L'Association n\u00e9erlandaise des assureurs<\/a> pr\u00e9cise que la norme PGS 37-1 peut \u00eatre rendue applicable par l'autorit\u00e9 comp\u00e9tente ou l'assureur, et souligne que les assureurs peuvent imposer des exigences plus strictes. Renseignez-vous sp\u00e9cifiquement sur l'implantation et l'espacement, le compartimentage coupe-feu, les plans d'urgence, la surveillance et la gestion des alarmes, ainsi que sur les conditions \u00e9ventuelles relatives \u00e0 une installation EOS en int\u00e9rieur.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Responsabilit\u00e9 relative \u00e0 l'installation \u00e9lectrique locale et \u00e0 l'entretien :<\/strong> Le devis doit pr\u00e9ciser qui se chargera de l'installation \u00e9lectrique aux Pays-Bas, des modifications des dispositifs de protection, de la mise en service, de la remise du plan d'urgence, de l'intervention en cas d'alarme et du d\u00e9pannage. Ne partez pas du principe que la fourniture du mat\u00e9riel inclut automatiquement l'installation sur place ou un service d'intervention sur site 24 heures sur 24, 7 jours sur 7.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69d48320 auto-p elementor-widget elementor-widget-heading\" data-id=\"69d48320\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le dossier d'appel d'offres doit d\u00e9finir clairement une cha\u00eene de responsabilit\u00e9 : <strong>qui valide l'approche relative \u00e0 la s\u00e9curit\u00e9 incendie\/PGS, qui est responsable des travaux \u00e9lectriques conformes \u00e0 la norme NEN 1010 et sur site, qui proc\u00e8de \u00e0 la mise en service du syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS), et qui intervient en cas de panne sur un site n\u00e9erlandais apr\u00e8s la remise des cl\u00e9s<\/strong>. Si ces champs sont vides, la mise en page n'est pas pr\u00eate \u00e0 \u00eatre publi\u00e9e.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f3c291c auto-h2 elementor-widget elementor-widget-heading\" data-id=\"2f3c291c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Les probl\u00e8mes li\u00e9s aux balances pour conteneurs peuvent provenir de la logistique avant m\u00eame la conception \u00e9lectrique<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3ed82b84 auto-p elementor-widget elementor-widget-heading\" data-id=\"3ed82b84\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les syst\u00e8mes de stockage d'\u00e9nergie par batterie (BESS) en conteneurs commencent \u00e0 pr\u00e9senter un int\u00e9r\u00eat \u00e0 l'\u00e9chelle du MWh, mais une usine urbaine peut rejeter ce format avant m\u00eame que l'on atteigne le rendement du syst\u00e8me de contr\u00f4le de puissance (PCS) ou que l'on \u00e9value la rentabilit\u00e9 sur le cycle de vie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-61218a7e auto-p elementor-widget elementor-widget-heading\" data-id=\"61218a7e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid <strong>ESSC0500B-1075<\/strong> est d'environ :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d164378b elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"d164378b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>6 058 \u00d7 2 438 \u00d7 2 896 mm<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>21 t<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Courant alternatif de 722 A nominal<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>500 kW \/ 1,0752 MWh<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4fe5ca86 auto-p elementor-widget elementor-widget-heading\" data-id=\"4fe5ca86\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid <strong>ESSC1000B-2150<\/strong> d\u00e9m\u00e9nage \u00e0 :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f04228c3 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"f04228c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>12 192 \u00d7 2 438 \u00d7 2 896 mm<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>38 t<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Courant alternatif nominal de 1 445 A<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>1 MW \/ 2,1504 MWh<\/strong><\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb102ff1 auto-p elementor-widget elementor-widget-heading\" data-id=\"bb102ff1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces sp\u00e9cifications soul\u00e8vent d'embl\u00e9e des questions d'ordre pratique :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b4bf2ec8 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"b4bf2ec8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Un camion peut-il acc\u00e9der \u00e0 la zone d'installation ?<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">La grue peut-elle fonctionner sans g\u00eaner le parc de chargement ?<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">La fondation est-elle capable de supporter le poids de l'\u00e9quipement ?<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Le tableau \u00e9lectrique de 400 V est-il capable de supporter le courant requis ?<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Les acc\u00e8s r\u00e9serv\u00e9s \u00e0 l'entretien et aux interventions d'urgence peuvent-ils rester ouverts autour d'une enceinte de 6 m ou 12 m ?<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-049072d7 auto-p elementor-widget elementor-widget-heading\" data-id=\"049072d7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une seule d\u00e9faillance au niveau de la logistique ou d'une interface peut entra\u00eener l'\u00e9limination du conteneur avant m\u00eame que la composition chimique de la batterie, son rendement ou le co\u00fbt par pouce carr\u00e9 (LCOS) n'entrent en ligne de compte.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-837a6423 auto-p elementor-widget elementor-widget-heading\" data-id=\"837a6423\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le conteneur de 2 MWh ne doit pas \u00eatre consid\u00e9r\u00e9 d'embl\u00e9e comme une mise \u00e0 niveau par rapport \u00e0 plusieurs armoires C&amp;I. Il appartient \u00e0 une autre cat\u00e9gorie de projet physique.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98a476dc auto-p elementor-widget elementor-widget-heading\" data-id=\"98a476dc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La capacit\u00e9 \u00e9lectrique est tout aussi importante que l'espace disponible. Le fait que la tension nominale corresponde ne signifie pas pour autant qu'un tableau \u00e9lectrique existant de 400 V puisse prendre en charge <strong>722 A ou 1 445 A<\/strong>. Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/connexion-de-batterie-400-v-au-tableau-electrique-existant\/\" target=\"_blank\" style=\"color:#61ce70\">Raccordement au syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) de 400 V<\/a><\/strong> doit prendre en charge la classe actuelle du produit s\u00e9lectionn\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0996dc62 auto-p elementor-widget elementor-widget-heading\" data-id=\"0996dc62\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Une fois que le format physique aura \u00e9t\u00e9 approuv\u00e9 lors de l'examen du plan d'am\u00e9nagement, le <strong><a href=\"https:\/\/www.solidess.com\/fr\/conception-de-systemes-de-stockage-denergie-par-batterie-sites-ci\/\" target=\"_blank\" style=\"color:#61ce70\">Conception du syst\u00e8me BESS C&amp;I<\/a><\/strong> doit n\u00e9anmoins garantir la puissance, l'\u00e9nergie et les performances de fonctionnement requises. <strong><a href=\"https:\/\/www.solidess.com\/fr\/aptitude-au-raccordement-dun-systeme-de-stockage-denergie-commercial\/\" target=\"_blank\" style=\"color:#61ce70\">\u00c9tat de pr\u00e9paration \u00e0 l'interconnexion des syst\u00e8mes de stockage d'\u00e9nergie par batterie (BESS) \u00e0 usage commercial<\/a><\/strong> doit \u00e9galement prendre en charge l'interface \u00e9lectrique s\u00e9lectionn\u00e9e avant que le conteneur ne soit consid\u00e9r\u00e9 comme une option d'approvisionnement viable.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-afa8f462 auto-p elementor-widget elementor-widget-heading\" data-id=\"afa8f462\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les clients dont le site prend r\u00e9ellement en charge l'\u00e9volutivit\u00e9 par conteneurs peuvent alors comparer les <strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-conteneurise\/\" target=\"_blank\" style=\"color:#61ce70\">Syst\u00e8me de stockage d'\u00e9nergie en conteneurs MegSolid<\/a><\/strong> compte tenu des moyens logistiques et de l'enveloppe budg\u00e9taire civile disponibles.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-391c5a10 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"391c5a10\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Le calcul en kWh par m\u00e8tre carr\u00e9 ne s'applique qu'aux limites communes<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b9fcc35c auto-p elementor-widget elementor-widget-heading\" data-id=\"b9fcc35c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">\u201cLa \u201d densit\u00e9 \u00e9nerg\u00e9tique \u00bb n'est plus comparable lorsque les fournisseurs utilisent des p\u00e9rim\u00e8tres de calcul diff\u00e9rents.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-46b59f45 auto-p elementor-widget elementor-widget-heading\" data-id=\"46b59f45\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un soumissionnaire peut diviser la puissance nominale par la surface de base de l'armoire. Un autre peut inclure une all\u00e9e de maintenance. Le troisi\u00e8me soumissionnaire peut proposer un devis pour l'ensemble de la zone d'installation.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f7334792 auto-p elementor-widget elementor-widget-heading\" data-id=\"f7334792\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces chiffres ne peuvent \u00eatre compar\u00e9s tant que les limites ne sont pas identiques.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-edcc8b04 auto-p elementor-widget elementor-widget-heading\" data-id=\"edcc8b04\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Appliquer un seul crit\u00e8re d'achat \u00e0 tous les soumissionnaires :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2474176a auto-p elementor-widget elementor-widget-heading\" data-id=\"2474176a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>Densit\u00e9 \u00e9nerg\u00e9tique de l'installation = kWh nominal \u00f7 surface totale occup\u00e9e par l'installation homologu\u00e9e<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-37b189a8 auto-p elementor-widget elementor-widget-heading\" data-id=\"37b189a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le d\u00e9nominateur doit inclure les parties du site qui ne peuvent plus \u00eatre utilis\u00e9es \u00e0 d\u2019autres fins en raison du BESS.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8f59d5fc auto-p elementor-widget elementor-widget-heading\" data-id=\"8f59d5fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Selon le projet, cela peut inclure :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ce444b09 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"ce444b09\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">socle d'armoire ou de conteneur ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">c\u00f4t\u00e9 serveur ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">ouverture de la porte ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">besoin de refroidissement ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">s\u00e9paration coupe-feu ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">itin\u00e9raire \u00e0 acc\u00e8s prot\u00e9g\u00e9.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-103dd096 auto-p elementor-widget elementor-widget-heading\" data-id=\"103dd096\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le choix d'une limite modifie la comparaison entre ESSA et Energon.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f6177d4 auto-p elementor-widget elementor-widget-heading\" data-id=\"2f6177d4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Plusieurs armoires refroidies par air peuvent pr\u00e9senter des surfaces au sol individuelles modestes, mais leur disposition combin\u00e9e peut occuper un espace important une fois prises en compte les exigences en mati\u00e8re d'entretien et de circulation d'air.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6a720034 auto-p elementor-widget elementor-widget-heading\" data-id=\"6a720034\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Un nombre r\u00e9duit d'armoires \u00e0 haute puissance peut permettre d'utiliser moins de surface de site \u00e0 forte valeur commerciale, m\u00eame si la taille de chaque armoire n'est pas nettement plus petite.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2b32d527 auto-p elementor-widget elementor-widget-heading\" data-id=\"2b32d527\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'agencement des conteneurs pose le m\u00eame probl\u00e8me, mais \u00e0 une autre \u00e9chelle. Les conteneurs de 6 m ou 12 m ont des dimensions de base simples, mais les op\u00e9rations de levage, d'entretien et d'acc\u00e8s d'urgence peuvent constituer les principales contraintes sur le terrain.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-23c289aa auto-p elementor-widget elementor-widget-heading\" data-id=\"23c289aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Appliquez une seule r\u00e8gle pour la comparaison :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6efe5db8 auto-p elementor-widget elementor-widget-heading\" data-id=\"6efe5db8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>Ne comparez jamais les valeurs en kWh\/m\u00b2 \u00e0 moins que tous les soumissionnaires n'utilisent la m\u00eame superficie de r\u00e9f\u00e9rence.<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-335c33f6 auto-p elementor-widget elementor-widget-heading\" data-id=\"335c33f6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/ci-bess-power-to-energy-ratio\/\" target=\"_blank\" style=\"color:#61ce70\">Ratio puissance\/\u00e9nergie du syst\u00e8me BESS<\/a><\/strong> Il convient toutefois de d\u00e9terminer au pr\u00e9alable la puissance et l'\u00e9nergie n\u00e9cessaires \u00e0 l'installation. L'optimisation de l'espace intervient une fois ces besoins d\u00e9finis ; le projet ne doit pas r\u00e9duire la consommation en kWh requise dans le seul but de faire rentrer une armoire.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-299c94f7 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"299c94f7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Le refroidissement par liquide est int\u00e9ressant lorsqu'il permet d'\u00e9viter des perturbations co\u00fbteuses sur site<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5646f3ce auto-p elementor-widget elementor-widget-heading\" data-id=\"5646f3ce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le prix des armoires \u00e0 lui seul ne suffit pas, car la superficie du terrain a sa propre valeur \u00e9conomique.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0405a781 auto-p elementor-widget elementor-widget-heading\" data-id=\"0405a781\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Consid\u00e9rons deux agencements techniquement r\u00e9alisables.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5cf29557 auto-p elementor-widget elementor-widget-heading\" data-id=\"5cf29557\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La premi\u00e8re solution n\u00e9cessite l'installation d'une armoire suppl\u00e9mentaire \u00e0 c\u00f4t\u00e9 d'un b\u00e2timent logistique. Cet emplacement supprime une place de stationnement utilis\u00e9e par les v\u00e9hicules de service.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-06aa7746 auto-p elementor-widget elementor-widget-heading\" data-id=\"06aa7746\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La seconde solution permet d'atteindre l'\u00e9nergie requise avec moins d'armoires, mais utilise un produit refroidi par liquide \u00e0 plus haute densit\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a67dc6cd auto-p elementor-widget elementor-widget-heading\" data-id=\"a67dc6cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La comparaison des prix propos\u00e9e par le gouvernement ne tient pas compte de la valeur de la place de stationnement qui dispara\u00eet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-045596f4 auto-p elementor-widget elementor-widget-heading\" data-id=\"045596f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les usines sont confront\u00e9es au m\u00eame probl\u00e8me :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-024e722f elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"024e722f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">l'ajout d'une armoire suppl\u00e9mentaire entra\u00eene la suppression d'un poste de travail de production ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">un agencement plus spacieux permet de d\u00e9placer une all\u00e9e de s\u00e9curit\u00e9 ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">une charge plus importante entra\u00eene un renforcement de la structure ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">il s'av\u00e8re n\u00e9cessaire de modifier un autre compartiment coupe-feu ou un acc\u00e8s ;<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">les longueurs de c\u00e2bles augmentent, car le syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) doit \u00eatre install\u00e9 plus loin du tableau de distribution.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a9581028 auto-p elementor-widget elementor-widget-heading\" data-id=\"a9581028\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Ces co\u00fbts ne sont pas inclus dans le prix de la carte SIM, mais ils d\u00e9coulent du format physique choisi.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bd5a2c1f auto-p elementor-widget elementor-widget-heading\" data-id=\"bd5a2c1f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon 261 devient int\u00e9ressant sur le plan commercial lorsque les \u00e9conomies r\u00e9alis\u00e9es en \u00e9vitant les travaux sur le site l'emportent sur le surco\u00fbt li\u00e9 \u00e0 une architecture plus dense.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d974e0c auto-p elementor-widget elementor-widget-heading\" data-id=\"4d974e0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il n'est pas n\u00e9cessaire d'utiliser un pourcentage de retour sur investissement (ROI) g\u00e9n\u00e9rique pour cette comparaison.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b643d45e auto-p elementor-widget elementor-widget-heading\" data-id=\"b643d45e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'acheteur peut comparer :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5f0ef41d auto-p elementor-widget elementor-widget-heading\" data-id=\"5f0ef41d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>co\u00fbt du mat\u00e9riel + travaux de gros \u0153uvre + d\u00e9placement des installations \u00e9lectriques + perte de surface commerciale + acc\u00e8s pour l'installation<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-16c562ba auto-p elementor-widget elementor-widget-heading\" data-id=\"16c562ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">pour l'ensemble des mises en page propos\u00e9es.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d30739fb auto-p elementor-widget elementor-widget-heading\" data-id=\"d30739fb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'espace fait d\u00e9sormais partie int\u00e9grante de l'\u00e9conomie des achats, et n'est plus un simple d\u00e9tail de conception v\u00e9rifi\u00e9 apr\u00e8s la passation de la commande.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f5d4413 auto-p elementor-widget elementor-widget-heading\" data-id=\"2f5d4413\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'ESSA peut encore s'imposer lorsque le site permet d'accueillir sans probl\u00e8me l'armoire \u00e0 refroidissement par air et que l'augmentation de la densit\u00e9 pr\u00e9sente peu d'int\u00e9r\u00eat commercial.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4db3d449 auto-p elementor-widget elementor-widget-heading\" data-id=\"4db3d449\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon gagne du terrain chaque fois qu'un nouveau poste minist\u00e9riel entra\u00eene des cons\u00e9quences co\u00fbteuses sur le plan administratif, op\u00e9rationnel ou immobilier.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-29f2f5ec auto-p elementor-widget elementor-widget-heading\" data-id=\"29f2f5ec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les syst\u00e8mes de stockage d'\u00e9nergie (ESS) en conteneurs ne sont avantageux que lorsque les besoins en MWh et les contraintes logistiques du site sont suffisamment importants pour justifier un autre format de projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-042fc706 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"042fc706\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Associez le produit aux options du site qui subsistent<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b23279dd auto-p elementor-widget elementor-widget-heading\" data-id=\"b23279dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Revenir \u00e0 la maquette de projection de Rotterdam au lieu de la consid\u00e9rer comme un projet achev\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-aec51e99 auto-p elementor-widget elementor-widget-heading\" data-id=\"aec51e99\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le meilleur produit n'est pas forc\u00e9ment celui qui affiche la puissance nominale la plus \u00e9lev\u00e9e en kWh.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-745d3223 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"745d3223\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>\u00c9tat d'avancement du projet<\/th><th>Direction MegSolid<\/th><th>Motif d'achat<\/th><\/tr><\/thead><tbody><tr><td>Une consommation d'environ 200 kWh, une zone de service suffisante et un syst\u00e8me de refroidissement plus simple sont pr\u00e9f\u00e9rables<\/td><td><strong>ESSA0100B-0215<\/strong><\/td><td>100 kW \/ 215,04 kWh r\u00e9pondent d\u00e9j\u00e0 aux exigences physiques et op\u00e9rationnelles<\/td><\/tr><tr><td>Un espace de stockage de la taille d'une armoire, mais chaque emplacement suppl\u00e9mentaire pour du mat\u00e9riel revient de plus en plus cher<\/td><td><strong>Energon 261<\/strong><\/td><td>Une puissance \u00e9nerg\u00e9tique plus \u00e9lev\u00e9e par emplacement d'armoire et le refroidissement par liquide font de l'espace un \u00e9l\u00e9ment de la proposition de valeur<\/td><\/tr><tr><td>~1 MWh de puissance nominale avec une zone d'installation r\u00e9elle de 6 m, une course de levage et une interface 400 V adapt\u00e9e<\/td><td><strong>ESSC0500B-1075<\/strong><\/td><td>Une balance pour conteneurs peut remplacer un vaste parc de cabines multiples<\/td><\/tr><tr><td>~2 MWh de puissance, avec la possibilit\u00e9 d'accueillir une installation de 12 m et 38 t ainsi que l'infrastructure \u00e9lectrique correspondante<\/td><td><strong>ESSC1000B-2150<\/strong><\/td><td>Les conditions sur site permettent d'opter pour une cat\u00e9gorie de syst\u00e8me plus grande<\/td><\/tr><tr><td>Les exigences \u00e9nerg\u00e9tiques sont respect\u00e9es, mais les espaces r\u00e9serv\u00e9s aux installations techniques, aux services ou \u00e0 la structure ne sont pas conformes<\/td><td><strong>Modifier le chemin d'acc\u00e8s physique du produit avant de r\u00e9duire le nombre de kWh requis<\/strong><\/td><td>Une batterie plus petite, m\u00eame si elle s'adapte physiquement, peut tout de m\u00eame ne pas r\u00e9pondre aux exigences de fonctionnement.<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5bb3226e auto-p elementor-widget elementor-widget-heading\" data-id=\"5bb3226e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid propose \u00e0 l'EPC plusieurs options d'enceintes pour un m\u00eame objectif commercial, laissant ainsi les contraintes du site d\u00e9terminer le format \u00e0 retenir.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4c931868 auto-p elementor-widget elementor-widget-heading\" data-id=\"4c931868\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Suivez la proc\u00e9dure suivante :<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-78cf45b6 auto-p elementor-widget elementor-widget-heading\" data-id=\"78cf45b6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>d\u00e9terminer les besoins en kW et en kWh \u2192 tracer l'empreinte r\u00e9elle de l'installation \u2192 v\u00e9rifier la structure et l'acc\u00e8s \u2192 \u00e9liminer les produits pr\u00e9sentant des d\u00e9fauts physiques \u2192 comparer la rentabilit\u00e9 des produits restants.<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d558908a auto-p elementor-widget elementor-widget-heading\" data-id=\"d558908a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">M\u00eame le cabinet le moins cher peut se voir confier le projet le plus co\u00fbteux lorsque les m\u00e8tres carr\u00e9s \u201c gratuits \u201d concernent la production, le stationnement ou les travaux de structure.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-28bb56cd auto-p elementor-widget elementor-widget-heading\" data-id=\"28bb56cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><strong>Permettez de r\u00e9pondre \u00e0 la comparaison \u00e0 partir d'un seul e-mail.<\/strong><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ad82c86f auto-p elementor-widget elementor-widget-heading\" data-id=\"ad82c86f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Joindre les informations suivantes : dimensions utiles (L \u00d7 l \u00d7 hauteur libre) de l'enceinte, charge structurelle admissible, distance entre les tableaux \u00e9lectriques de 400 V et courant nominal, puissance cible en kW \/ consommation quotidienne en kWh, ainsi que le nom de l'organisme charg\u00e9 de l'\u00e9valuation de la conformit\u00e9 aux normes n\u00e9erlandaises en mati\u00e8re d'incendie et de la certification PGS.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-79c5aa29 auto-p elementor-widget elementor-widget-heading\" data-id=\"79c5aa29\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Demander une r\u00e9ponse concernant la disposition \u00ab r\u00e9ussite\/\u00e9chec \u00bb en utilisant une limite commune : <strong>ESSA \u00d71, Energon \u00d71 ou \u00d72, et ESSC \u00e9limin\u00e9 ou conserv\u00e9<\/strong>. La r\u00e9ponse doit indiquer toute donn\u00e9e manquante concernant le poids, les d\u00e9gagements, la structure ou les homologations qui emp\u00eache la mise en service.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-90687c14 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"90687c14\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Contacter MegSolid au sujet de la configuration du BESS<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-561af9b0 auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"561af9b0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c2b2d4e6 elementor-widget elementor-widget-heading\" data-id=\"c2b2d4e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-fc08b535 e-con-full e-flex e-con e-child\" data-id=\"fc08b535\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7e36eb65 elementor-widget elementor-widget-n-accordion\" data-id=\"7e36eb65\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2110\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2110\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> De combien d'espace une armoire de stockage d'\u00e9nergie a-t-elle r\u00e9ellement besoin ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2110\" class=\"elementor-element elementor-element-2f319a3a e-con-full e-flex e-con e-child\" data-id=\"2f319a3a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2110\" class=\"elementor-element elementor-element-83212376 e-con-full e-flex e-con e-child\" data-id=\"83212376\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1e61e0ab elementor-widget elementor-widget-heading\" data-id=\"1e61e0ab\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Les dimensions de la base de l'armoire ne constituent qu'un point de d\u00e9part. L'espace d'installation doit \u00e9galement pr\u00e9voir un acc\u00e8s pour la maintenance, l'ouverture des portes, le passage des c\u00e2bles, un espace d\u00e9di\u00e9 \u00e0 la gestion thermique, des cloisons coupe-feu et un acc\u00e8s d'urgence, conform\u00e9ment aux exigences du projet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2111\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2111\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> La surface au sol de l'Energon 261 n'est-elle que de 1,76 m\u00b2 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2111\" class=\"elementor-element elementor-element-4be7abf5 e-con-full e-flex e-con e-child\" data-id=\"4be7abf5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2111\" class=\"elementor-element elementor-element-b36ee062 e-con-full e-flex e-con e-child\" data-id=\"b36ee062\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-31fe62fc elementor-widget elementor-widget-heading\" data-id=\"31fe62fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. La surface de base de l'armoire, calcul\u00e9e \u00e0 partir de ses dimensions hors tout de 1 300 \u00d7 1 350 mm, est d'environ 1,76 m\u00b2. L'empreinte au sol totale de l'installation est plus importante une fois prises en compte les exigences en mati\u00e8re d'entretien, de s\u00e9curit\u00e9 incendie, de c\u00e2blage et d'acc\u00e8s.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2112\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2112\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Dans quels cas l'ESSA0100B-0215 est-il pr\u00e9f\u00e9rable \u00e0 l'Energon 261 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2112\" class=\"elementor-element elementor-element-5b7fa413 e-con-full e-flex e-con e-child\" data-id=\"5b7fa413\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2112\" class=\"elementor-element elementor-element-0f590286 e-con-full e-flex e-con e-child\" data-id=\"0f590286\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-85edd432 elementor-widget elementor-widget-heading\" data-id=\"85edd432\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le ESSA0100B-0215 peut constituer le meilleur choix lorsque le site dispose d\u00e9j\u00e0 d'une surface d'installation suffisante, que la charge se situe autour de 215 kWh et que le client n'a pas besoin de la densit\u00e9 suppl\u00e9mentaire ni de l'architecture \u00e0 refroidissement liquide de l'Energon 261.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2113\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2113\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> \u00c0 partir de quand l'Energon 261 vaut-il la peine d'\u00eatre achet\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2113\" class=\"elementor-element elementor-element-60a9a26d e-con-full e-flex e-con e-child\" data-id=\"60a9a26d\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2113\" class=\"elementor-element elementor-element-28e15349 e-con-full e-flex e-con e-child\" data-id=\"28e15349\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ab6c34f7 elementor-widget elementor-widget-heading\" data-id=\"ab6c34f7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">L'Energon 261 devient plus int\u00e9ressant lorsque chaque emplacement suppl\u00e9mentaire dans l'armoire entra\u00eene un co\u00fbt r\u00e9el, tel que la perte d'espace de production, de stationnement, d'acc\u00e8s ou des travaux de g\u00e9nie civil suppl\u00e9mentaires. Sa puissance nominale de 261,24 kWh permet d'alimenter chaque emplacement de l'armoire avec davantage d'\u00e9nergie.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2114\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2114\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Le refroidissement par liquide n\u00e9cessite-t-il toujours moins d'espace que le refroidissement par air ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2114\" class=\"elementor-element elementor-element-76c86d87 e-con-full e-flex e-con e-child\" data-id=\"76c86d87\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2114\" class=\"elementor-element elementor-element-41d84e00 e-con-full e-flex e-con e-child\" data-id=\"41d84e00\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-72dc2473 elementor-widget elementor-widget-heading\" data-id=\"72dc2473\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Pas n\u00e9cessairement. Le r\u00e9sultat d\u00e9pend de la conception de l\u2019armoire, des espaces libres n\u00e9cessaires au fonctionnement, des exigences en mati\u00e8re de s\u00e9curit\u00e9 incendie et du nombre d\u2019unit\u00e9s requises. Il convient de comparer les syst\u00e8mes de refroidissement par liquide en se basant sur le sch\u00e9ma d\u2019installation complet, et non sur un pourcentage indicatif.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2115\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2115\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Un fabricant peut-il r\u00e9duire la capacit\u00e9 de batterie requise simplement pour que le bo\u00eetier s'adapte ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2115\" class=\"elementor-element elementor-element-e842138a e-con-full e-flex e-con e-child\" data-id=\"e842138a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2115\" class=\"elementor-element elementor-element-78809f14 e-con-full e-flex e-con e-child\" data-id=\"78809f14\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d4f450b4 elementor-widget elementor-widget-heading\" data-id=\"d4f450b4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">C'est g\u00e9n\u00e9ralement l'ordre inverse. Il convient tout d'abord de d\u00e9terminer les besoins en kW et en kWh en fonction des conditions d'exploitation. Le format et la configuration du produit doivent ensuite \u00eatre adapt\u00e9s au site sans compromettre les performances \u00e9nerg\u00e9tiques requises.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2116\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2116\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quand un client doit-il passer des armoires \u00e0 l'ESSC0500B-1075 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2116\" class=\"elementor-element elementor-element-264bf886 e-con-full e-flex e-con e-child\" data-id=\"264bf886\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2116\" class=\"elementor-element elementor-element-59bfca82 e-con-full e-flex e-con e-child\" data-id=\"59bfca82\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-dc65c36b elementor-widget elementor-widget-heading\" data-id=\"dc65c36b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">La balance pour conteneurs devient plus pertinente lorsque le projet atteint r\u00e9ellement environ 1 MWh et que le site peut accueillir un conteneur de 6 m et 21 t, un acc\u00e8s pour les engins de levage, un espace de maintenance et l'interface \u00e9lectrique correspondante de 722 A.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2117\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2117\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Un tableau \u00e9lectrique existant de 400 V peut-il accueillir un ESSC1000B-2150 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2117\" class=\"elementor-element elementor-element-e056682f e-con-full e-flex e-con e-child\" data-id=\"e056682f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2117\" class=\"elementor-element elementor-element-d6e7491e e-con-full e-flex e-con e-child\" data-id=\"d6e7491e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-19a170e7 elementor-widget elementor-widget-heading\" data-id=\"19a170e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Il ne suffit pas que la tension soit adapt\u00e9e. L'ESSC1000B-2150 pr\u00e9sente un courant nominal alternatif de 1 445 A ; par cons\u00e9quent, l'appareillage de commutation, les c\u00e2bles, la charge du transformateur, les dispositifs de protection et le raccordement sur site doivent \u00eatre adapt\u00e9s \u00e0 cette classe de courant.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2118\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2118\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Faut-il tenir compte des cloisons coupe-feu lors de la comparaison de l'empreinte au sol des syst\u00e8mes de stockage d'\u00e9nergie par batterie (BESS) ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2118\" class=\"elementor-element elementor-element-5b388fb9 e-con-full e-flex e-con e-child\" data-id=\"5b388fb9\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2118\" class=\"elementor-element elementor-element-6e346b56 e-con-full e-flex e-con e-child\" data-id=\"6e346b56\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cf371bc4 elementor-widget elementor-widget-heading\" data-id=\"cf371bc4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui. Les comparaisons en mati\u00e8re d'approvisionnement doivent se fonder sur le plan d'implantation approuv\u00e9, y compris les limites sp\u00e9cifiques au projet en mati\u00e8re de services et de s\u00e9curit\u00e9 incendie, plut\u00f4t que sur les seules dimensions de base des \u00e9quipements.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-2119\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-2119\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> L'espace sur le toit peut-il \u00eatre consid\u00e9r\u00e9 comme une zone libre destin\u00e9e \u00e0 un syst\u00e8me de stockage d'\u00e9nergie par batterie (BESS) ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2119\" class=\"elementor-element elementor-element-9a92e9dc e-con-full e-flex e-con e-child\" data-id=\"9a92e9dc\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-2119\" class=\"elementor-element elementor-element-1563944f e-con-full e-flex e-con e-child\" data-id=\"1563944f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6f786caa elementor-widget elementor-widget-heading\" data-id=\"6f786caa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le n\u00b0 ESSA0100B-0215 pr\u00e9sente un poids net publi\u00e9 de 3 900 kg, et m\u00eame sa simple moyenne de criblage sur toute la base est d\u2019environ 10,1 kN\/m\u00b2 avant de prendre en compte la concentration aux points d\u2019appui. L\u2019Energon 261 ne doit pas \u00eatre install\u00e9 sur une toiture tant que la masse exacte et les r\u00e9actions d\u2019appui du mod\u00e8le concern\u00e9 n\u2019ont pas \u00e9t\u00e9 fournies.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-21110\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-21110\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Quel produit MegSolid convient \u00e0 un entrep\u00f4t frigorifique de Rotterdam o\u00f9 l'espace est limit\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21110\" class=\"elementor-element elementor-element-c5c74910 e-con-full e-flex e-con e-child\" data-id=\"c5c74910\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21110\" class=\"elementor-element elementor-element-65e4eaf8 e-con-full e-flex e-con e-child\" data-id=\"65e4eaf8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-59af8aef elementor-widget elementor-widget-heading\" data-id=\"59af8aef\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le mod\u00e8le ESSA0100B-0215 peut r\u00e9pondre \u00e0 des besoins mod\u00e9r\u00e9s d'environ 200 kWh lorsque l'espace disponible dans l'armoire est suffisant. L'Energon 261 s'av\u00e8re plus avantageux lorsque l'espace dans l'armoire est un facteur co\u00fbteux. Les produits ESSC ne sont envisag\u00e9s que lorsque les besoins en MWh et la logistique du site justifient le recours \u00e0 des conteneurs.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-21111\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-21111\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> La norme PGS 37-1 a-t-elle une incidence sur l'agencement des armoires de stockage d'\u00e9nergie aux Pays-Bas ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21111\" class=\"elementor-element elementor-element-af4c1018 e-con-full e-flex e-con e-child\" data-id=\"af4c1018\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21111\" class=\"elementor-element elementor-element-54125471 e-con-full e-flex e-con e-child\" data-id=\"54125471\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-671ae6d6 elementor-widget elementor-widget-heading\" data-id=\"671ae6d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Oui. La norme PGS 37-1 constitue une r\u00e9f\u00e9rence n\u00e9erlandaise essentielle en mati\u00e8re de s\u00e9curit\u00e9 fond\u00e9e sur les risques, mais le projet doit encore identifier l\u2019autorit\u00e9 comp\u00e9tente, tout \u00ab omgevingsdienst \u00bb charg\u00e9 de la gestion du trac\u00e9, les recommandations de la \u00ab veiligheidsregio \u00bb (r\u00e9gion de s\u00e9curit\u00e9) ou des services d\u2019incendie, ainsi que les exigences de l\u2019assureur. Les dimensions de l\u2019armoire ne suffisent pas \u00e0 elles seules \u00e0 d\u00e9finir le p\u00e9rim\u00e8tre d\u2019installation final accept\u00e9.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-21112\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-21112\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> L'installation en ext\u00e9rieur est-elle toujours la meilleure solution pour les sites n\u00e9erlandais C&amp;I o\u00f9 l'espace est limit\u00e9 ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21112\" class=\"elementor-element elementor-element-da7729fe e-con-full e-flex e-con e-child\" data-id=\"da7729fe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-21112\" class=\"elementor-element elementor-element-395c2d41 e-con-full e-flex e-con e-child\" data-id=\"395c2d41\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1d2ce07e elementor-widget elementor-widget-heading\" data-id=\"1d2ce07e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Non. Une installation en ext\u00e9rieur permet certes de pr\u00e9server l'espace de production int\u00e9rieur, mais elle peut empi\u00e9ter sur les zones de stationnement, de chargement ou d'acc\u00e8s d'urgence. Le meilleur emplacement est celui qui pr\u00e9sente le co\u00fbt commercial et technique total le plus bas, une fois pris en compte les exigences en mati\u00e8re d'acc\u00e8s, de s\u00e9curit\u00e9 incendie et de g\u00e9nie civil.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Compare ESSA0100B-0215, Energon 261 and containerized BESS for space-constrained Dutch C&#038;I sites by installed footprint, service access, fire boundary, structure and logistics. <\/p>","protected":false},"author":4,"featured_media":5281,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[1,712],"tags":[601,185,599,598,469,596,184,600,602,597],"class_list":["post-5284","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bess","category-bess-product-comparisons","tag-bess-footprint","tag-commercial-battery-storage","tag-containerized-bess","tag-dutch-ci-energy-storage","tag-energon-261","tag-energy-storage-cabinet-netherlands","tag-essa0100b-0215","tag-pgs-37-1","tag-rotterdam-energy-storage","tag-space-constrained-bess"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5284","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=5284"}],"version-history":[{"count":8,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5284\/revisions"}],"predecessor-version":[{"id":6198,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5284\/revisions\/6198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/5281"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=5284"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=5284"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=5284"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}