{"id":5467,"date":"2026-09-20T09:39:38","date_gmt":"2026-09-20T01:39:38","guid":{"rendered":"https:\/\/www.solidess.com\/?p=5467"},"modified":"2026-09-20T09:39:38","modified_gmt":"2026-09-20T01:39:38","slug":"battery-energy-storage-system-malaysia-261kwh-bess","status":"publish","type":"post","link":"https:\/\/www.solidess.com\/fr\/battery-energy-storage-system-malaysia-261kwh-bess\/","title":{"rendered":"Battery Energy Storage System Malaysia: Size 261 kWh for a 90 kW TNB Peak"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5467\" class=\"elementor elementor-5467\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-bf4793c e-con-full auto-article-root e-flex e-con e-parent\" data-id=\"bf4793c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-697efd8b auto-image elementor-widget elementor-widget-image\" data-id=\"697efd8b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1254\" height=\"1254\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5464\" alt=\"MegSolid Malaysia BESS for a 90 kW TNB maximum-demand peak, comparing ESSA0100B-0215, Energon 261 and ESSC0500B-1075 by energy, footprint and TNB tariff timing\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover.jpg 1254w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-300x300.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-1024x1024.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-150x150.jpg 150w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-768x768.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-12x12.jpg 12w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-600x600.jpg 600w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-kW-TNB-Peak-Cover-100x100.jpg 100w\" sizes=\"(max-width: 1254px) 100vw, 1254px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-acca220f auto-p elementor-widget elementor-widget-heading\" data-id=\"acca220f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">In Malaysia, an 80\u2013100 kW billed peak lasting about two hours makes both discharge power and delivered energy relevant to the cabinet choice. <strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/stockage-denergie-solide-liquide-megasolide\/\" target=\"_blank\" style=\"color:#61ce70\">MegSolid Energon 261<\/a><\/strong> supplies 125 kVA and 261.24 kWh in a 1.76 m\u00b2 footprint, placing it between one undersized <strong><a href=\"https:\/\/www.solidess.com\/fr\/comment-choisir-entre-un-stockage-par-batterie-commercial-bess-de-215-kwh-et-de-261-kwh\/\" target=\"_blank\" style=\"color:#61ce70\">215.04 kWh unit<\/a><\/strong> and a two-cabinet overbuild defined during <strong><a href=\"https:\/\/www.solidess.com\/fr\/conception-de-systemes-de-stockage-denergie-par-batterie-sites-ci\/\" target=\"_blank\" style=\"color:#61ce70\">C&amp;I BESS design<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-52607dcf auto-h2 elementor-widget elementor-widget-heading\" data-id=\"52607dcf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Energon 261 Fits an 80\u2013100 kW Two-Hour Demand Block<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98631bd7 auto-p elementor-widget elementor-widget-heading\" data-id=\"98631bd7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Delivering 90 kW for two hours requires 180 kWh AC before conversion losses and operating reserve enter the calculation. The usable-energy screen below rejects one ESSA0100B-0215 for this two-hour duty.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb224f8e auto-p elementor-widget elementor-widget-heading\" data-id=\"cb224f8e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/stockage-denergie-solide-liquide-megasolide\/\" target=\"_blank\" style=\"color:#61ce70\">Energon 261.24 kWh system<\/a><\/strong> combines 125 kVA and 261.24 kWh in one IP54 cabinet. Energon provides 400\/480 V AC options, intelligent liquid cooling, AI early warning and battery temperature-difference control within \u00b15\u00b0C. The worked energy duty does not require a second cabinet.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cbddb2d6 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"cbddb2d6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>MegSolid option<\/th><th>Note publi\u00e9e<\/th><th>Result for a 90 kW, two-hour peak<\/th><\/tr><\/thead><tbody><tr><td>ESSA0100B-0215<\/td><td>100 kW \/ 215,04 kWh<\/td><td>Power is adequate; nominal energy leaves too little room for losses and protected SOC<\/td><\/tr><tr><td>Energon 261<\/td><td>125 kVA \/ 261,24 kWh<\/td><td>One cabinet covers the preliminary power and energy screen<\/td><\/tr><tr><td>2 \u00d7 ESSA0100B-0215<\/td><td>200 kW \/ 430.08 kWh<\/td><td>Adds 202.8 kWh above the later 227.3 kWh calculation and doubles cabinet-level integration<\/td><\/tr><tr><td>ESSC0500B-1075<\/td><td>500 kW \/ 1,0752 MWh<\/td><td>Reserved for a much larger plant or campus demand block<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-65ba27ca auto-h3 elementor-widget elementor-widget-heading\" data-id=\"65ba27ca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Compare the Installed Cabinet Footprints<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc6648de auto-p elementor-widget elementor-widget-heading\" data-id=\"cc6648de\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon measures 1,300 \u00d7 1,350 \u00d7 2,200 mm, giving a 1.76 m\u00b2 equipment footprint before service clearances. One ESSA0100B-0215 occupies about 3.80 m\u00b2 from its 2,450 \u00d7 1,550 mm base, while two occupy about 7.60 m\u00b2.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6a31f169 auto-p elementor-widget elementor-widget-heading\" data-id=\"6a31f169\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Choosing one Energon instead of two ESSA cabinets reduces cabinet footprint by approximately 76.9% and removes one parallel branch from the preliminary layout.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17a804db auto-p elementor-widget elementor-widget-heading\" data-id=\"17a804db\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Shorter peaks, lower power factor or an energy requirement beyond one cabinet can change the product selection. TNB billing windows and site interval data establish those boundaries.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cc73af8f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"cc73af8f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Check Whether TNB Bills the Peak the Battery Will Remove<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a80246e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"a80246e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Maximum-demand savings begin with the tariff category, voltage level and time of the recorded peak. TNB\u2019s current <a href=\"https:\/\/www.mytnb.com.my\/tariff\/index.html\" target=\"_blank\" rel=\"noopener\">voltage-based tariff structure<\/a> classifies low voltage up to 1 kV, medium voltage above 1 kV and up to 50 kV, and high voltage above 50 kV and up to 230 kV. Use the tariff category on the site invoice when interpreting its meter data.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3f202cda auto-p elementor-widget elementor-widget-heading\" data-id=\"3f202cda\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The same 90 kW event can have a different billing effect under a Time-of-Use tariff. TNB states that maximum demand occurring during off-peak periods is not charged for non-domestic medium- and high-voltage ToU customers. The weekday peak window runs from 14:00 to 22:00. Other weekday hours and the entire weekend are off-peak.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a6c90add auto-table elementor-widget elementor-widget-text-editor\" data-id=\"a6c90add\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Site tariff position<\/th><th>Peak that matters to the purchase<\/th><th>BESS operating result<\/th><\/tr><\/thead><tbody><tr><td>Non-domestic general tariff<\/td><td>Highest demand that reaches the billed maximum-demand line<\/td><td>Discharge against the recurring billed interval<\/td><\/tr><tr><td>Medium- or high-voltage ToU<\/td><td>Chargeable weekday event between 14:00 and 22:00<\/td><td>Hold sufficient SOC before 14:00 and cover the event<\/td><\/tr><tr><td>Peak occurs only during ToU off-peak hours<\/td><td>Event does not create the same maximum-demand charge<\/td><td>Avoid buying battery capacity for a saving the tariff does not create<\/td><\/tr><tr><td>Peak moves between production shifts<\/td><td>Different event may set the next bill<\/td><td>Control every qualifying event across the billing period<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3c1635a auto-h2 elementor-widget elementor-widget-heading\" data-id=\"d3c1635a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Use Repeated 30-Minute Demand Blocks to Define the Duty<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fca49b9c auto-image elementor-widget elementor-widget-image\" data-id=\"fca49b9c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5465\" alt=\"Malaysia TNB peak comparison showing 90 kW for 90 minutes against two hours, with ESSA0100B-0215 for shorter duty and Energon 261 for longer discharge requirements\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-90-Min-vs-Two-Hour-Cabinet-Decision-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-865b3482 auto-p elementor-widget elementor-widget-heading\" data-id=\"865b3482\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Review at least 12 billing months of load data. Monthly kWh totals cannot show whether a 390 kW maximum came from one interval, four consecutive intervals or a repeated production cycle. An unchanged kW peak can require a different battery capacity when its duration increases.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cb2a57af auto-table elementor-widget elementor-widget-text-editor\" data-id=\"cb2a57af\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Recorded event above a 300 kW target<\/th><th>Required BESS power<\/th><th>AC energy to remove the event<\/th><th>Orientation initiale de MegSolid<\/th><\/tr><\/thead><tbody><tr><td>One interval at 390 kW<\/td><td>90 kW<\/td><td>45 kWh<\/td><td>ESSA energy range<\/td><\/tr><tr><td>Four intervals at 390 kW<\/td><td>90 kW<\/td><td>180 kWh<\/td><td>Energon 261 energy range<\/td><\/tr><tr><td>Eight intervals at 340 kW<\/td><td>40 kW<\/td><td>160 kWh<\/td><td>Lower PCS power with a longer energy window<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9041b4df auto-p elementor-widget elementor-widget-heading\" data-id=\"9041b4df\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The highest interval sets the monthly maximum. The intervals around it establish how many kWh the battery needs. Repeated events also establish how often the cabinet must cycle and how much time remains for recharge. The <strong><a href=\"https:\/\/www.solidess.com\/fr\/controle-de-lecretement-des-pics-de-charge-de-la-batterie-pcc\/\" target=\"_blank\" style=\"color:#61ce70\">PCC peak-shaving controller<\/a><\/strong> must prevent charging from creating a new billed maximum after the original peak has been reduced.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ddc70537 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ddc70537\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Set the PCS Requirement from kW and Power Factor<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0c6bd8ff auto-p elementor-widget elementor-widget-heading\" data-id=\"0c6bd8ff\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The meter establishes the required kW reduction. Power factor then converts that duty into the apparent power seen by the PCS and switchboard. The calculation for a plant reducing its billed peak from 390 kW to 300 kW is:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9edd38bb auto-p elementor-widget elementor-widget-heading\" data-id=\"9edd38bb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Required active-power reduction = 390 kW \u2212 300 kW = 90 kW<br>Required apparent power at PF 0.90 = 90 kW \u00f7 0.90 = 100 kVA<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-25add748 auto-p elementor-widget elementor-widget-heading\" data-id=\"25add748\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon\u2019s published 125 kVA rating leaves 25 kVA between the calculated duty and the cabinet rating at this operating point. Lower power factor consumes that margin quickly:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a580f099 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"a580f099\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Site power factor<\/th><th>Apparent power required for 90 kW<\/th><th>Margin below 125 kVA<\/th><\/tr><\/thead><tbody><tr><td>0.95<\/td><td>94.7 kVA<\/td><td>30.3 kVA<\/td><\/tr><tr><td>0.90<\/td><td>100.0 kVA<\/td><td>25.0 kVA<\/td><\/tr><tr><td>0.80<\/td><td>112.5 kVA<\/td><td>12.5 kVA<\/td><\/tr><tr><td>0.75<\/td><td>120.0 kVA<\/td><td>5.0 kVA<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-282c4aa0 auto-p elementor-widget elementor-widget-heading\" data-id=\"282c4aa0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Apparent power is the scope of this comparison. The 125 kVA nameplate states apparent power. Final commissioning must still confirm active power, reactive-power behaviour and harmonic performance at the site operating point through <strong><a href=\"https:\/\/www.solidess.com\/fr\/tests-de-qualite-de-lenergie-pour-la-reception-commerciale-des-systemes-de-stockage-denergie-par-batterie\/\" target=\"_blank\" style=\"color:#61ce70\">commercial BESS power-quality testing<\/a><\/strong>.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-db885aad auto-p elementor-widget elementor-widget-heading\" data-id=\"db885aad\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">CT direction can invalidate the dispatch calculation. Reversed CT polarity or a misplaced PCC measurement can command charging during a peak or discharging after the event has passed.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c3df3262 auto-p elementor-widget elementor-widget-heading\" data-id=\"c3df3262\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/bess-ct-mesure-de-la-polarite-mise-en-service\/\" target=\"_blank\" style=\"color:#61ce70\">CT polarity commissioning test<\/a><\/strong> verifies that the controller sees import and export in the same direction as the revenue meter.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7f1e7ca0 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"7f1e7ca0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Size Battery Energy from Peak Duration and Protected SOC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9b6619ba auto-p elementor-widget elementor-widget-heading\" data-id=\"9b6619ba\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Power determines how far the demand falls; duration determines whether the cabinet can hold the target until the event ends. Four consecutive 30-minute intervals at a 90 kW reduction require 180 kWh at the AC connection:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fbde21cd auto-p elementor-widget elementor-widget-heading\" data-id=\"fbde21cd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>AC energy required = 90 kW \u00d7 2 hours = 180 kWh<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4c8bbc63 auto-p elementor-widget elementor-widget-heading\" data-id=\"4c8bbc63\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon\u2019s published maximum system efficiency is 90%. The worked case uses an 88% AC delivery factor and holds 10% of nominal energy outside the scheduled peak-shaving window. Required nameplate energy becomes:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a4700252 auto-p elementor-widget elementor-widget-heading\" data-id=\"a4700252\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Required nominal energy = 180 kWh \u00f7 0.88 \u00f7 0.90<br>                        = 227.3 kWh<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e9b41ed4 auto-p elementor-widget elementor-widget-heading\" data-id=\"e9b41ed4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">One ESSA0100B-0215 is 12.3 kWh below the 227.3 kWh screen. Energon is 34.0 kWh above it. Applying the same delivery factor and SOC window to both cabinets gives:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-066afdd8 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"066afdd8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Produit<\/th><th>\u00c9nergie nominale<\/th><th>Energy after 10% SOC reserve and 88% delivery factor<\/th><th>Duration at 90 kW<\/th><\/tr><\/thead><tbody><tr><td>ESSA0100B-0215<\/td><td>215,04 kWh<\/td><td>170.3 kWh AC<\/td><td>1.89 hours<\/td><\/tr><tr><td>Energon 261<\/td><td>261,24 kWh<\/td><td>206.9 kWh AC<\/td><td>2.30 hours<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-af8ca193 auto-p elementor-widget elementor-widget-heading\" data-id=\"af8ca193\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">With the stated reserve and delivery factors, Energon has approximately 26.9 kWh AC beyond the two-hour requirement. The extra energy covers a modest extension while keeping the defined SOC reserve.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-93bd9c54 auto-p elementor-widget elementor-widget-heading\" data-id=\"93bd9c54\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Long-term sizing still needs the project degradation model and guaranteed-energy schedule. The <strong><a href=\"https:\/\/www.solidess.com\/fr\/test-de-capacite-du-bess-commercial-pour-verifier-les-kwh-utilisables\/\" target=\"_blank\" style=\"color:#61ce70\">test de capacit\u00e9 des syst\u00e8mes de stockage d'\u00e9nergie par batterie (BESS) \u00e0 usage commercial<\/a><\/strong> verifies delivered AC energy at the agreed power, SOC limits and ambient condition.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cddcdde0 auto-p elementor-widget elementor-widget-heading\" data-id=\"cddcdde0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Shorter events favour the 215.04 kWh cabinet. Ninety minutes at 90 kW needs 135 kWh AC and 170.5 kWh of nameplate energy under the same factors, placing it inside the ESSA0100B-0215 range. Extending the measured event by only 30 minutes can move the purchase between the two products.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-855e18a8 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"855e18a8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Match the Demand Block to ESSA, Energon or ESSC<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5101a42c auto-p elementor-widget elementor-widget-heading\" data-id=\"5101a42c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid\u2019s ESSA, Energon and ESSC classes give Malaysian factories different power and energy blocks for measured demand. The 215.04 kWh ESSA suits shorter peaks, Energon fills the two-hour single-cabinet gap, and ESSC0500B-1075 moves the project into a 500 kW container architecture.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e0adfd9c auto-table elementor-widget elementor-widget-text-editor\" data-id=\"e0adfd9c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Droit mesur\u00e9<\/th><th>MegSolid selection<\/th><th>Published product advantage<\/th><th>Customer result<\/th><\/tr><\/thead><tbody><tr><td>Up to 100 kW with calculated nameplate energy at or below 215.04 kWh<\/td><td><strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-en-armoire-exterieure\/\" target=\"_blank\" style=\"color:#61ce70\">ESSA0100B-0215<\/a><\/strong><\/td><td>100 kW, 215.04 kWh, 400 V, built-in isolation transformer, on-grid THDi &lt;3%<\/td><td>Avoids paying for the longer 261.24 kWh energy window<\/td><\/tr><tr><td>Approximately 80\u2013100 kW for close to two hours<\/td><td><strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/stockage-denergie-solide-liquide-megasolide\/\" target=\"_blank\" style=\"color:#61ce70\">Energon 261<\/a><\/strong><\/td><td>125 kVA, 261.24 kWh, 400\/480 V, liquid cooling, up to 10 units in parallel<\/td><td>Covers the worked duty with one compact cabinet and preserves an expansion path<\/td><\/tr><tr><td>Several hundred kilowatts with an energy requirement approaching 1 MWh<\/td><td><strong><a href=\"https:\/\/www.solidess.com\/fr\/product\/systeme-de-stockage-denergie-conteneurise\/\" target=\"_blank\" style=\"color:#61ce70\">ESSC0500B-1075<\/a><\/strong><\/td><td>500 kW, 1.0752 MWh, IP54, 6,058 \u00d7 2,438 \u00d7 2,896 mm<\/td><td>Replaces a growing group of small cabinets with one container-level block<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be4157e7 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"be4157e7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">When the Container-Class Screen Applies<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ad4a59c8 auto-p elementor-widget elementor-widget-heading\" data-id=\"ad4a59c8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">ESSC0500B-1075 enters the comparison when both required power and energy approach its class. Sustaining a 350 kW reduction for two hours requires 700 kWh AC. Using the same 88% delivery factor and 10% SOC reserve gives 883.8 kWh of required nameplate energy, which sits inside the 1.0752 MWh ESSC0500B-1075 rating.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2966e3aa auto-p elementor-widget elementor-widget-heading\" data-id=\"2966e3aa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Its 21,000 kg weight and container dimensions then become transformer, switchboard, foundation and delivery-route decisions.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4d89731c auto-p elementor-widget elementor-widget-heading\" data-id=\"4d89731c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon remains the strongest match for the 90 kW factory because ESSC would provide 410 kW more rated power and 814.0 kWh more nominal energy than the selected cabinet. Those unused ratings add infrastructure without improving the two-hour demand target.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0de618f3 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"0de618f3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Receive a 215 kWh vs 261 kWh Duty-Matched Sizing Comparison<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac8bb080 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"ac8bb080\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Keep Energon Ready for the Chargeable TNB Window<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-07d033f4 auto-p elementor-widget elementor-widget-heading\" data-id=\"07d033f4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The two-hour event can be controlled only if the required energy remains available when the chargeable window begins. Under the current TNB ToU schedule, a medium- or high-voltage factory can prepare the battery before 14:00, protect the required SOC through the weekday peak window and recharge after 22:00. Weekend operation can use the all-day off-peak period when production permits.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cae9344d auto-p elementor-widget elementor-widget-heading\" data-id=\"cae9344d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Control priority for the 90 kW site should follow this order:<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7c786422 elementor-widget-mobile__width-inherit auto-list elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"7c786422\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Charge to the scheduled SOC target without lifting facility import above its control ceiling.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Preserve 180 kWh AC for the four consecutive 30-minute demand intervals.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Discharge as PCC import approaches 300 kW, then modulate output to hold that target.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Retain the remaining calculated margin for a late or extended event.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-circle\" viewbox=\"0 0 512 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M256 8C119 8 8 119 8 256s111 248 248 248 248-111 248-248S393 8 256 8z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\">Recharge after the chargeable window at a power level that stays below the next demand threshold.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-07cb360e auto-p elementor-widget elementor-widget-heading\" data-id=\"07cb360e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">At 90 kW, Energon\u2019s calculated 26.9 kWh AC margin adds about 18 minutes. That time is useful when a production run ends later than planned; it is too small to justify uncontrolled discharge earlier in the day.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d55ec60b auto-p elementor-widget elementor-widget-heading\" data-id=\"d55ec60b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/logique-de-priorite-bess-ems\/\" target=\"_blank\" style=\"color:#61ce70\">Logique de priorit\u00e9 du syst\u00e8me EMS de BESS<\/a><\/strong> must place tariff protection above optional solar shifting whenever both functions compete for the same SOC.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5ad65e28 auto-p elementor-widget elementor-widget-heading\" data-id=\"5ad65e28\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Daily dispatch puts thermal consistency into the operating specification. Energon\u2019s intelligent liquid cooling and self-evolving control maintain the published battery temperature difference within \u00b15\u00b0C, while AI early warning adds a monitoring layer around the same cabinet. These features support the repeated duty. The modeled energy requirement already fits one Energon without dividing it between two ESSA cabinets.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a72fe4c3 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"a72fe4c3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Value the 90 kW Reduction from the Actual TNB Bill<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3d10be7 auto-p elementor-widget elementor-widget-heading\" data-id=\"d3d10be7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Calculate peak-shaving savings from the demand-related charge applied to the verified reduction. Energy charges, fuel adjustment, solar self-consumption and other bill components remain separate calculations.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-535850d3 auto-p elementor-widget elementor-widget-heading\" data-id=\"535850d3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\"><code>Monthly maximum-demand saving<br>= verified billed-demand reduction \u00d7 applicable demand charge in RM\/kW<\/code><\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-930dbe57 auto-p elementor-widget elementor-widget-heading\" data-id=\"930dbe57\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Claiming a 90 kW bill reduction requires the recorded maximum to fall by the full 90 kW. Missing an event late in the month can replace the controlled peak and erase much of that month\u2019s demand saving, making Energon\u2019s two-hour coverage and protected SOC commercially important.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98d6fb94 auto-h3 elementor-widget elementor-widget-heading\" data-id=\"98d6fb94\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Keep the Published Market Case Separate<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bb0db10e auto-p elementor-widget elementor-widget-heading\" data-id=\"bb0db10e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The following published Malaysian installation provides a separate market reference. <a href=\"https:\/\/www.livoltek.com\/livoltek-maximum-demand-management-in-malaysia-for-ci-energy-storage\/\" target=\"_blank\" rel=\"noopener\">Livoltek reports<\/a> a 125 kW\/261 kWh installation that reduced maximum demand by as much as 89.99 kW, with monthly savings near RM9,000 and annual savings above RM95,000.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-217f39e2 auto-p elementor-widget elementor-widget-heading\" data-id=\"217f39e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Those figures describe Livoltek\u2019s published project. The 90 kW MegSolid example is screened separately against Energon\u2019s 125 kVA and 261.24 kWh ratings.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2ac177e9 auto-p elementor-widget elementor-widget-heading\" data-id=\"2ac177e9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Net value still needs to account for charging energy, conversion losses, auxiliary consumption, maintenance and the cost of retained SOC. Full lifecycle treatment belongs in the existing cost analysis; this page keeps the decision on whether one Energon cabinet can physically remove the chargeable demand block.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5490705f auto-h2 elementor-widget elementor-widget-heading\" data-id=\"5490705f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Prove the Demand Reduction During FAT and SAT<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d77f1553 auto-image elementor-widget elementor-widget-image\" data-id=\"d77f1553\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1448\" height=\"1086\" src=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof.jpg\" class=\"attachment-1536x1536 size-1536x1536 wp-image-5466\" alt=\"MegSolid engineering infographic showing a 390 kW site peak reduced to 300 kW, 90 kW discharge, 180 kWh AC demand, 227.3 kWh nominal energy screen and FAT SAT checks\" srcset=\"https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof.jpg 1448w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-300x225.jpg 300w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-1024x768.jpg 1024w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-768x576.jpg 768w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-16x12.jpg 16w, https:\/\/www.solidess.com\/wp-content\/uploads\/2026\/09\/Malaysia-BESS-PCS-SOC-and-TNB-Demand-Proof-600x450.jpg 600w\" sizes=\"(max-width: 1448px) 100vw, 1448px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d7f50fc4 auto-p elementor-widget elementor-widget-heading\" data-id=\"d7f50fc4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The cabinet, controller and site meter must reproduce the required result before site acceptance. Factory acceptance verifies the product configuration; site acceptance proves that the installed system controls the same point and interval used for billing.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b5b0f865 auto-table elementor-widget elementor-widget-text-editor\" data-id=\"b5b0f865\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<div class=\"cea-table-wrap\"><table><thead><tr><th>Acceptance check<\/th><th>Test condition<\/th><th>Purchase decision protected<\/th><\/tr><\/thead><tbody><tr><td>PCS apparent-power duty<\/td><td>Run at the agreed active power and site power factor<\/td><td>Confirms that the 125 kVA boundary covers the 90 kW event<\/td><\/tr><tr><td>\u00c9nergie fournie en courant alternatif<\/td><td>Discharge at 90 kW across the defined SOC window<\/td><td>Confirms at least 180 kWh reaches the AC connection for the two-hour event<\/td><\/tr><tr><td>Commande PCC<\/td><td>Raise site load above 300 kW and record BESS response<\/td><td>Confirms the plant import target is held at the billing boundary<\/td><\/tr><tr><td>Interval alignment<\/td><td>Compare BESS logs, site meter and revenue-meter interval timestamps<\/td><td>Prevents a control success in the wrong interval<\/td><\/tr><tr><td>Recharge control<\/td><td>Recharge after the event under the import ceiling<\/td><td>Prevents the battery from creating the next billed peak<\/td><\/tr><tr><td>Thermal operation<\/td><td>Record battery temperature spread during the duty<\/td><td>Verifies operation against Energon\u2019s published \u00b15\u00b0C temperature-difference control<\/td><\/tr><\/tbody><\/table><\/div>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bc0cd1bf auto-p elementor-widget elementor-widget-heading\" data-id=\"bc0cd1bf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">IEC 62619 addresses safety requirements and tests for industrial secondary lithium cells and batteries. IEC 62933-5-2 covers safety requirements for grid-integrated electrochemical energy storage systems, while IEC 62477-1 addresses power electronic converter system safety.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-27583e78 auto-p elementor-widget elementor-widget-heading\" data-id=\"27583e78\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">These standards define evidence and test scope for the project; certification claims require the corresponding MegSolid certificate or report.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-89b7464a auto-p elementor-widget elementor-widget-heading\" data-id=\"89b7464a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Le <strong><a href=\"https:\/\/www.solidess.com\/fr\/test-de-performance-des-graisses-saturees-ci-bess-acceptation\/\" target=\"_blank\" style=\"color:#61ce70\">C&amp;I BESS FAT, SAT and performance acceptance process<\/a><\/strong> ties those checks to witnessed records. The <strong><a href=\"https:\/\/www.solidess.com\/fr\/guide-dessai-de-reception-en-usine-de-bess\/\" target=\"_blank\" style=\"color:#61ce70\">Guide des essais de r\u00e9ception en usine BESS<\/a><\/strong> then connects PCS, BMS, EMS, thermal protection and communication evidence to the equipment released for shipment.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17086e95 auto-h2 elementor-widget elementor-widget-heading\" data-id=\"17086e95\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Select the Final MegSolid Configuration from the Measured Event<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bbc133e8 auto-p elementor-widget elementor-widget-heading\" data-id=\"bbc133e8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">With a 390 kW factory peak, a 300 kW import target, 0.90 power factor and a two-hour event, the calculation yields 90 kW, 100 kVA and 227.3 kWh of screened nameplate energy. MegSolid Energon 261 is the strongest product match because one cabinet supplies 125 kVA and 261.24 kWh while preserving 34.0 kWh above the calculated nameplate requirement.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-46693e22 auto-p elementor-widget elementor-widget-heading\" data-id=\"46693e22\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">ESSA0100B-0215 becomes the better purchase when the same 90 kW event lasts about 90 minutes. ESSC0500B-1075 becomes the better architecture when the measured duty rises into several hundred kilowatts and the calculated energy approaches 1 MWh. Product class follows the measured demand event and its duration.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f10c94c8 auto-p elementor-widget elementor-widget-heading\" data-id=\"f10c94c8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">In this worked duty, Energon provides four specific benefits: one cabinet instead of two, approximately 76.9% less cabinet footprint than two ESSA units, about 18 minutes of calculated AC energy beyond the two-hour target, and an expansion path of up to 10 parallel units. Liquid cooling, \u00b15\u00b0C temperature-difference control and AI early warning support the repeated dispatch expected from daily maximum-demand management.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-58846592 elementor-tablet-align-center elementor-align-center auto-cta elementor-widget elementor-widget-button\" data-id=\"58846592\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t\t\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6Ijk0OCIsInRvZ2dsZSI6ZmFsc2V9\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Confirm the Energon 261 Configuration With a PCS, SOC and SAT Review<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-e6ef50ad auto-faq e-flex e-con-boxed e-con e-child\" data-id=\"e6ef50ad\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0b3c2bce elementor-widget elementor-widget-heading\" data-id=\"0b3c2bce\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0864b4ed e-con-full e-flex e-con e-child\" data-id=\"0864b4ed\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d4d33acb elementor-widget elementor-widget-n-accordion\" data-id=\"d4d33acb\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;default_state&quot;:&quot;all_collapsed&quot;,&quot;max_items_expended&quot;:&quot;one&quot;,&quot;n_accordion_animation_duration&quot;:{&quot;unit&quot;:&quot;ms&quot;,&quot;size&quot;:400,&quot;sizes&quot;:[]}}\" data-widget_type=\"nested-accordion.default\">\n\t\t\t\t\t\t\t<div class=\"e-n-accordion\" aria-label=\"Accord\u00e9on. Ouvrez les liens \u00e0 l&#039;aide de la touche Entr\u00e9e ou de la barre d&#039;espace, fermez-les avec la touche \u00c9chap et naviguez \u00e0 l&#039;aide des touches fl\u00e9ch\u00e9es.\">\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3570\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3570\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What is the best battery energy storage system for a 90 kW, two-hour peak in Malaysia? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3570\" class=\"elementor-element elementor-element-7d68e787 e-con-full e-flex e-con e-child\" data-id=\"7d68e787\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3570\" class=\"elementor-element elementor-element-e7ea7e9a e-con-full e-flex e-con e-child\" data-id=\"e7ea7e9a\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-15023848 elementor-widget elementor-widget-heading\" data-id=\"15023848\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">MegSolid Energon 261 is the best-fit single-cabinet option for the duty calculated here. Its 125 kVA and 261.24 kWh ratings cover the 100 kVA and 227.3 kWh screening results with defined margin.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3571\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3571\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How long can Energon 261 support a 90 kW reduction? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3571\" class=\"elementor-element elementor-element-d6237ce7 e-con-full e-flex e-con e-child\" data-id=\"d6237ce7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3571\" class=\"elementor-element elementor-element-4e2601f7 e-con-full e-flex e-con e-child\" data-id=\"4e2601f7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-75412b68 elementor-widget elementor-widget-heading\" data-id=\"75412b68\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Using the article\u2019s 10% SOC reserve and 88% AC delivery factor, 261.24 kWh provides about 206.9 kWh AC. That equals approximately 2.30 hours at 90 kW.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3572\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3572\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Est-ce que 125 kVA, c'est la m\u00eame chose que 125 kW ? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3572\" class=\"elementor-element elementor-element-8bcdafde e-con-full e-flex e-con e-child\" data-id=\"8bcdafde\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3572\" class=\"elementor-element elementor-element-b7e07189 e-con-full e-flex e-con e-child\" data-id=\"b7e07189\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-8d390fa2 elementor-widget elementor-widget-heading\" data-id=\"8d390fa2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">No. kVA is apparent power, while kW is active power. Delivering 90 kW at 0.90 power factor requires 100 kVA, leaving 25 kVA below Energon\u2019s published rating.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3573\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3573\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can one ESSA0100B-0215 handle the same peak? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3573\" class=\"elementor-element elementor-element-626411f2 e-con-full e-flex e-con e-child\" data-id=\"626411f2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3573\" class=\"elementor-element elementor-element-b15a6757 e-con-full e-flex e-con e-child\" data-id=\"b15a6757\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9c8558fa elementor-widget elementor-widget-heading\" data-id=\"9c8558fa\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">One ESSA provides enough rated power at 100 kW. Under the same reserve and delivery factors, its 215.04 kWh rating supplies about 170.3 kWh AC, covering roughly 1.89 hours at 90 kW.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3574\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3574\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> When should a Malaysian factory choose ESSC0500B-1075? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3574\" class=\"elementor-element elementor-element-6be3a54c e-con-full e-flex e-con e-child\" data-id=\"6be3a54c\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3574\" class=\"elementor-element elementor-element-0701f586 e-con-full e-flex e-con e-child\" data-id=\"0701f586\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9218ae6b elementor-widget elementor-widget-heading\" data-id=\"9218ae6b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">ESSC0500B-1075 becomes relevant when the reduction reaches several hundred kilowatts and calculated energy approaches 1 MWh. The 500 kW, 1.0752 MWh, 21,000 kg container also requires suitable switchgear, transformer capacity, foundation and delivery access.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3575\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"6\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3575\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does TNB charge maximum demand during off-peak ToU hours? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3575\" class=\"elementor-element elementor-element-8ed8cb0b e-con-full e-flex e-con e-child\" data-id=\"8ed8cb0b\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3575\" class=\"elementor-element elementor-element-77847c38 e-con-full e-flex e-con e-child\" data-id=\"77847c38\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-eedb1a14 elementor-widget elementor-widget-heading\" data-id=\"eedb1a14\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">TNB states that off-peak maximum demand is not charged for non-domestic medium- and high-voltage ToU customers. The current weekday peak period is 14:00\u201322:00, with weekends treated as off-peak.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3576\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"7\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3576\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How much interval data should be checked before buying a BESS? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3576\" class=\"elementor-element elementor-element-0cc75cc7 e-con-full e-flex e-con e-child\" data-id=\"0cc75cc7\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3576\" class=\"elementor-element elementor-element-89a67828 e-con-full e-flex e-con e-child\" data-id=\"89a67828\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9de4c070 elementor-widget elementor-widget-heading\" data-id=\"9de4c070\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Twelve billing months reveal seasonal production, shutdowns and recurring chargeable peaks. Monthly kWh totals alone cannot show event duration or how often the battery must discharge.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3577\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"8\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3577\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can BESS charging create a new maximum-demand charge? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3577\" class=\"elementor-element elementor-element-efc19285 e-con-full e-flex e-con e-child\" data-id=\"efc19285\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3577\" class=\"elementor-element elementor-element-cb1b0688 e-con-full e-flex e-con e-child\" data-id=\"cb1b0688\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1019ed0c elementor-widget elementor-widget-heading\" data-id=\"1019ed0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Yes. Recharge power added to the facility load can establish a new peak. PCC control should cap charging so total grid import remains below the selected threshold.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3578\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"9\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3578\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Does maximum-demand management require rooftop solar? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3578\" class=\"elementor-element elementor-element-4ccc8fcd e-con-full e-flex e-con e-child\" data-id=\"4ccc8fcd\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3578\" class=\"elementor-element elementor-element-f85cff59 e-con-full e-flex e-con e-child\" data-id=\"f85cff59\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4a8f3c81 elementor-widget elementor-widget-heading\" data-id=\"4a8f3c81\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">No. The battery can recharge from the grid during a suitable low-load or off-peak window and discharge against the chargeable event. Solar can reduce charging cost when surplus generation is available.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-3579\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"10\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-3579\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> What does liquid cooling add to the Energon 261 purchase? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3579\" class=\"elementor-element elementor-element-eb06d5ac e-con-full e-flex e-con e-child\" data-id=\"eb06d5ac\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-3579\" class=\"elementor-element elementor-element-28872481 e-con-full e-flex e-con e-child\" data-id=\"28872481\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-854c6734 elementor-widget elementor-widget-heading\" data-id=\"854c6734\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Energon uses intelligent liquid cooling and published control of battery temperature difference within \u00b15\u00b0C. That thermal consistency supports the repeated cycling duty created by regular peak shaving.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35710\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"11\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35710\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> Can Energon 261 cabinets be expanded later? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35710\" class=\"elementor-element elementor-element-807ea498 e-con-full e-flex e-con e-child\" data-id=\"807ea498\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35710\" class=\"elementor-element elementor-element-7dec9fb3 e-con-full e-flex e-con e-child\" data-id=\"7dec9fb3\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1141c1fc elementor-widget elementor-widget-heading\" data-id=\"1141c1fc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Yes. MegSolid publishes parallel operation of up to 10 units. Transformer capacity, switchboard current, protection, controller architecture and available space still set the practical site limit.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35711\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"12\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35711\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How should the 180 kWh delivery target be verified? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35711\" class=\"elementor-element elementor-element-eebe55ab e-con-full e-flex e-con e-child\" data-id=\"eebe55ab\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35711\" class=\"elementor-element elementor-element-24886f89 e-con-full e-flex e-con e-child\" data-id=\"24886f89\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-cd37ad0c elementor-widget elementor-widget-heading\" data-id=\"cd37ad0c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">The site acceptance test should discharge at 90 kW through the agreed SOC window and meter at least 180 kWh at the AC connection. Timestamps must align with the facility and revenue-meter intervals.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t\t<details id=\"e-n-accordion-item-35712\" class=\"e-n-accordion-item\" >\n\t\t\t\t<summary class=\"e-n-accordion-item-title\" data-accordion-index=\"13\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-35712\" >\n\t\t\t\t\t<span class='e-n-accordion-item-title-header'><div class=\"e-n-accordion-item-title-text\"> How are monthly savings calculated for a Malaysian factory? <\/div><\/span>\n\t\t\t\t\t\t\t<span class='e-n-accordion-item-title-icon'>\n\t\t\t<span class='e-opened' ><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-up\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M240.971 130.524l194.343 194.343c9.373 9.373 9.373 24.569 0 33.941l-22.667 22.667c-9.357 9.357-24.522 9.375-33.901.04L224 227.495 69.255 381.516c-9.379 9.335-24.544 9.317-33.901-.04l-22.667-22.667c-9.373-9.373-9.373-24.569 0-33.941L207.03 130.525c9.372-9.373 24.568-9.373 33.941-.001z\"><\/path><\/svg><\/span>\n\t\t\t<span class='e-closed'><svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-down\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M207.029 381.476L12.686 187.132c-9.373-9.373-9.373-24.569 0-33.941l22.667-22.667c9.357-9.357 24.522-9.375 33.901-.04L224 284.505l154.745-154.021c9.379-9.335 24.544-9.317 33.901.04l22.667 22.667c9.373 9.373 9.373 24.569 0 33.941L240.971 381.476c-9.373 9.372-24.569 9.372-33.942 0z\"><\/path><\/svg><\/span>\n\t\t<\/span>\n\n\t\t\t\t\t\t<\/summary>\n\t\t\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35712\" class=\"elementor-element elementor-element-dfa8ad43 e-con-full e-flex e-con e-child\" data-id=\"dfa8ad43\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div role=\"region\" aria-labelledby=\"e-n-accordion-item-35712\" class=\"elementor-element elementor-element-7129d2fe e-con-full e-flex e-con e-child\" data-id=\"7129d2fe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fe08d8e1 elementor-widget elementor-widget-heading\" data-id=\"fe08d8e1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<p class=\"elementor-heading-title elementor-size-default\">Multiply the verified billed-demand reduction by the applicable RM\/kW charge on the site\u2019s TNB bill. Charging energy, losses, auxiliary consumption and maintenance are then deducted from the gross demand saving.<\/p>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/details>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Cut TNB maximum demand with MegSolid 215 kWh, 261 kWh or 1.075 MWh BESS. Compare kW, kVA, SOC headroom, footprint and cabinet count.<\/p>","protected":false},"author":4,"featured_media":5464,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[27,1],"tags":[663,662,665,469,666,664],"class_list":["post-5467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-bess","tag-261-kwh-bess","tag-battery-energy-storage-system-malaysia","tag-commercial-bess-malaysia","tag-energon-261","tag-peak-shaving-malaysia","tag-tnb-maximum-demand"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/comments?post=5467"}],"version-history":[{"count":3,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5467\/revisions"}],"predecessor-version":[{"id":5476,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/posts\/5467\/revisions\/5476"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media\/5464"}],"wp:attachment":[{"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/media?parent=5467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/categories?post=5467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.solidess.com\/fr\/wp-json\/wp\/v2\/tags?post=5467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}