Inkqubo yokugcina amandla ebhetri yaseMalaysia: Umthamo we-261 kWh we-90 kW ye-TNB Peak

I-MegSolid Malaysia BESS yomlinganiselo ophezulu we-TNB we-90 kW, ithelekisa i-ESSA0100B-0215, i-Energon 261 kunye ne-ESSC0500B-1075 ngokwe-energy, indawo ethathwayo kunye nexesha lothengo lwe-TNB.

EMalaysia, i-80–100 kW yamandla aphezulu abhalisiweyo ahlala malunga neeyure ezimbini, yenza zombini amandla okukhupha kunye namandla anikezelweyo zibe yinto ebalulekileyo ekukhetheni ikhabhathi. MegSolid Energon 261 inika i-125 kVA ne-261.24 kWh kwindawo engange-1.76 m², iyibeka phakathi kwenye encinci kakhulu Iyunithi ye-215.04 kWh kunye nokwakhiwa okongeziweyo okuneekhabhathi ezimbini okuchazwe ngexesha Uyilo lwe-C&I BESS.

I-Energon 261 ilingana ne-block yemfuno yeeyure ezimbini eyi-80–100 kW.

Ukuhambisa i-90 kW kangangeeyure ezimbini kufuna i-180 kWh ye-AC phambi kokuba ilahleko yoguqulo kunye nendidi yokusebenza efihliweyo zingene kubalo. Isikrini samandla asetyenziswayo esingezantsi asivumeli i-ESSA0100B-0215 enye kulo msebenzi weeyure ezimbini.

I- Inkqubo ye-Energon 261.24 kWh Idibanisa i-125 kVA kunye ne-261.24 kWh kwikhabhathi enye ye-IP54. I-Energon ibonelela ngeenketho ze-400/480 V AC, ukupholisa okubanzi okukrelekrele, isilumkiso kwangethuba se-AI kunye nolawulo lomahluko wobushushu bebhetri olungaphakathi kwi-±5°C. Umthwalo womsebenzi wamandla awufuni ikhabhathi yesibini.

Ukhetho lweMegSolidUluhlu olupapashiweyoIsiphumo se-90 kW, isiqingatha sehora esiphezulu
ESSA0100B-0215100 kW / 215.04 kWhAmandla aneleke; amandla asisiseko ashiya indawo encinci kakhulu yokulahleka kunye ne-SOC ekhuselweyo.
I-Energon 261125 kVA / 261.24 kWhIkhabhathi enye igubungela isikrini sokuqala samandla namandla ombane.
2 × ESSA0100B-0215200 kW / 430.08 kWhYongeza i-202.8 kWh ngaphezulu kwesibalo se-227.3 kWh esilandelayo kwaye iphinda kabini ukudityaniswa kwinqanaba lekhabhathi.
ESSC0500B-1075500 kW / 1.0752 MWhIgcinelwe isicelo esikhulu kakhulu somthi okanye sekhampasi.

Thelekisa iifutprinti zekhabhathi ezifakiweyo

I-Energon ilinganisa i-1,300 × 1,350 × 2,200 mm, nto leyo eyenza indawo yezixhobo ibe yi-1.76 m² phambi kokuba kubekho izithuba zokufikelela kwinkonzo. I-ESSA0100B-0215 enye ithatha malunga ne-3.80 m² ukusuka kwisiseko sayo esiyi-2,450 × 1,550 mm, ngelixa ezimbini zithatha malunga ne-7.60 m².

Ukukhetha i-Energon enye endaweni yeekhabhathi ezimbini ze-ESSA kunciphisa indawo ethathwayo yikhabhathi malunga ne-76.9% kwaye kususwe isebe elinye elihamba ngokunxuseneyo kulwakhiwo lokuqala.

Iincopho ezimfutshane, ifactor yamandla ephantsi okanye imfuno yamandla engaphaya kwekhabhathi enye inokutshintsha ukhetho lwemveliso. Iifestile zokuhlawulisa ze-TNB kunye nedatha yezikhewu zasiza zibeka loo mida.

Jonga ukuba amatyala e-TNB angakhupha ibhetri na

Ugcino lwexesha elinobuzima obuphezulu luqala kudidi lwerhafu, kwinqanaba lombane kunye nexesha lephiko elirekhodiweyo. Okwangoku kwe-TNB Isakhiwo seetarif esisekelwe kuvoltheji Ihlukanisa ivoltheji ephantsi ukuya kutsho kwi-1 kV, ivoltheji ephakathi ngaphezulu kwe-1 kV ukuya kutsho kwi-50 kV, kunye nevholtheji ephezulu ngaphezulu kwe-50 kV ukuya kutsho kwi-230 kV. Sebenzisa udidi lwerhafu kwisatifikethi sentlawulo yendawo xa utolika idatha yemitha yayo.

Isiganeko esifanayo se-90 kW sinokuba nefuthe elahlukileyo lokubhatalisa phantsi kwerhafu ye-Time-of-Use. I-TNB ithi eyona mfuno iphezulu eyenzeka ngamaxesha angengowokuxinana ayibhatalisiwi kubathengi be-ToU abangekhaya abasemgangathweni ophakathi nowephezulu wovoltage. Ixesha eliphezulu ngeentsuku zokusebenza liqala ngo-14:00 ukuya ku-22:00. Ezinye iiyure zeentsuku zokusebenza kunye nempelaveki iphela zizamaxesha angengowephezulu.

Isikhundla setarifa yesizaIncopho ebalulekileyo ekuthengeniIsiphumo sokusebenza seBESS
Umrhumo jikelele ongengowasekhayaEyona mfuno iphezulu ifikelela kumgca womthamo-mkhulu ofakelwe itarifa.Ukukhupha ngokuchasene nexesha eliphindaphindiweyo lokubhalwa kwebhili
I-ToU yombane onamandla aphakathi okanye aphezuluIsiganeko esihlawulelwayo ngeeentsuku zeveki phakathi kweye-14:00 neye-22:00Gcina i-SOC eyaneleyo phambi kwe-14:00 uze ugqume isiganeko.
Ixesha eliphezulu lenzeka kuphela ngamaxesha angengawona axakekileyo e-ToU.Isiganeko asidali intlawulo efanayo yomthamo ophezulu.Phepha ukuthenga umthamo webhetri ukuze wonge i-tariff ongayidalanga.
Ukunyakaza okuphezulu phakathi kweentshukumo zemvelisoIziganeko ezahlukeneyo zinokumisela ityala elilandelayo.Lawula zonke iziganeko zokufaneleka kuyo yonke ixesha lokubiza.

Sebenzisa Iiblocks Zofuna Eziphindaphindwayo Zemizuzu Engama-30 Ukuchaza Umsebenzi

Malaysia TNB peak comparison showing 90 kW for 90 minutes against two hours, with ESSA0100B-0215 for shorter duty and Energon 261 for longer discharge requirements

Hlalutya ubuncinane iinyanga ezili-12 zedatha yemithwalo yokubiza. Iinkcukacha-zizonke ze-kWh zenyanga azinakubonisa ukuba umlinganiselo ophezulu we-390 kW uvele kwisithuba esinye, kwizithuba ezine ezilandelelanayo okanye kumjikelo wemveliso ophindaphindiweyo. Umlinganiselo ophezulu we-kW ongatshintshanga unokufuna umthamo webhetri owahlukileyo xa ixesha lawo lokuhlala lonyuka.

Isiganeko esirekhodiweyo ngaphezulu kwenjongo ye-300 kWAmandla e-BESS afunekayoAmandla e-AC okususa isiganekoUkhokelo lokuqala lweMegSolid
Isigaba esinye esiyi-390 kW90 kW45 kWhUluhlu lwamandla lwe-ESSA
Izihlandlo ezine nge-390 kW90 kW180 kWhEnergon 261 energy range
Eight intervals at 340 kW40 kW160 kWhLower PCS power with a longer energy window

The highest interval sets the monthly maximum. The intervals around it establish how many kWh the battery needs. Repeated events also establish how often the cabinet must cycle and how much time remains for recharge. The PCC peak-shaving controller must prevent charging from creating a new billed maximum after the original peak has been reduced.

Set the PCS Requirement from kW and Power Factor

The meter establishes the required kW reduction. Power factor then converts that duty into the apparent power seen by the PCS and switchboard. The calculation for a plant reducing its billed peak from 390 kW to 300 kW is:

Ukuncitshiswa kwamandla asebenzayo okufunekayo = 390 kW − 300 kW = 90 kW
Amandla abonakalayo afunekayo kwi-PF 0.90 = 90 kW ÷ 0.90 = 100 kVA

Energon’s published 125 kVA rating leaves 25 kVA between the calculated duty and the cabinet rating at this operating point. Lower power factor consumes that margin quickly:

Site power factorApparent power required for 90 kWMargin below 125 kVA
0.9594.7 kVA30.3 kVA
0.90100.0 kVA25.0 kVA
0.80112.5 kVA12.5 kVA
0.75120.0 kVA5.0 kVA

Apparent power is the scope of this comparison. The 125 kVA nameplate states apparent power. Final commissioning must still confirm active power, reactive-power behaviour and harmonic performance at the site operating point through commercial BESS power-quality testing.

CT direction can invalidate the dispatch calculation. Reversed CT polarity or a misplaced PCC measurement can command charging during a peak or discharging after the event has passed.

I- CT polarity commissioning test verifies that the controller sees import and export in the same direction as the revenue meter.

Size Battery Energy from Peak Duration and Protected SOC

Power determines how far the demand falls; duration determines whether the cabinet can hold the target until the event ends. Four consecutive 30-minute intervals at a 90 kW reduction require 180 kWh at the AC connection:

AC energy required = 90 kW × 2 hours = 180 kWh

Energon’s published maximum system efficiency is 90%. The worked case uses an 88% AC delivery factor and holds 10% of nominal energy outside the scheduled peak-shaving window. Required nameplate energy becomes:

Amandla adityelweyo afunekayo = 180 kWh ÷ 0.88 ÷ 0.90
= 227.3 kWh

One ESSA0100B-0215 is 12.3 kWh below the 227.3 kWh screen. Energon is 34.0 kWh above it. Applying the same delivery factor and SOC window to both cabinets gives:

ImvelisoAmandla anomlinganiseloEnergy after 10% SOC reserve and 88% delivery factorDuration at 90 kW
ESSA0100B-0215215.04 kWh170.3 kWh AC1.89 hours
I-Energon 261261.24 kWh206.9 kWh AC2.30 hours

With the stated reserve and delivery factors, Energon has approximately 26.9 kWh AC beyond the two-hour requirement. The extra energy covers a modest extension while keeping the defined SOC reserve.

Long-term sizing still needs the project degradation model and guaranteed-energy schedule. The Uvavanyo lomthamo we-BESS yorhwebo verifies delivered AC energy at the agreed power, SOC limits and ambient condition.

Shorter events favour the 215.04 kWh cabinet. Ninety minutes at 90 kW needs 135 kWh AC and 170.5 kWh of nameplate energy under the same factors, placing it inside the ESSA0100B-0215 range. Extending the measured event by only 30 minutes can move the purchase between the two products.

Match the Demand Block to ESSA, Energon or ESSC

MegSolid’s ESSA, Energon and ESSC classes give Malaysian factories different power and energy blocks for measured demand. The 215.04 kWh ESSA suits shorter peaks, Energon fills the two-hour single-cabinet gap, and ESSC0500B-1075 moves the project into a 500 kW container architecture.

Umthwalo olinganisiweyoMegSolid selectionPublished product advantageIsiphumo somthengi
Up to 100 kW with calculated nameplate energy at or below 215.04 kWhESSA0100B-0215100 kW, 215.04 kWh, 400 V, built-in isolation transformer, on-grid THDi <3%Avoids paying for the longer 261.24 kWh energy window
Approximately 80–100 kW for close to two hoursI-Energon 261125 kVA, 261.24 kWh, 400/480 V, liquid cooling, up to 10 units in parallelCovers the worked duty with one compact cabinet and preserves an expansion path
Several hundred kilowatts with an energy requirement approaching 1 MWhESSC0500B-1075500 kW, 1.0752 MWh, IP54, 6,058 × 2,438 × 2,896 mmReplaces a growing group of small cabinets with one container-level block

When the Container-Class Screen Applies

ESSC0500B-1075 enters the comparison when both required power and energy approach its class. Sustaining a 350 kW reduction for two hours requires 700 kWh AC. Using the same 88% delivery factor and 10% SOC reserve gives 883.8 kWh of required nameplate energy, which sits inside the 1.0752 MWh ESSC0500B-1075 rating.

Its 21,000 kg weight and container dimensions then become transformer, switchboard, foundation and delivery-route decisions.

Energon remains the strongest match for the 90 kW factory because ESSC would provide 410 kW more rated power and 814.0 kWh more nominal energy than the selected cabinet. Those unused ratings add infrastructure without improving the two-hour demand target.

Keep Energon Ready for the Chargeable TNB Window

The two-hour event can be controlled only if the required energy remains available when the chargeable window begins. Under the current TNB ToU schedule, a medium- or high-voltage factory can prepare the battery before 14:00, protect the required SOC through the weekday peak window and recharge after 22:00. Weekend operation can use the all-day off-peak period when production permits.

Control priority for the 90 kW site should follow this order:

At 90 kW, Energon’s calculated 26.9 kWh AC margin adds about 18 minutes. That time is useful when a production run ends later than planned; it is too small to justify uncontrolled discharge earlier in the day.

I- Ingqiqo yezinto eziphambili ye-BESS EMS must place tariff protection above optional solar shifting whenever both functions compete for the same SOC.

Daily dispatch puts thermal consistency into the operating specification. Energon’s intelligent liquid cooling and self-evolving control maintain the published battery temperature difference within ±5°C, while AI early warning adds a monitoring layer around the same cabinet. These features support the repeated duty. The modeled energy requirement already fits one Energon without dividing it between two ESSA cabinets.

Value the 90 kW Reduction from the Actual TNB Bill

Calculate peak-shaving savings from the demand-related charge applied to the verified reduction. Energy charges, fuel adjustment, solar self-consumption and other bill components remain separate calculations.

Ugcino lweyona mfuno iphezulu yenyanga
= ukuncitshiswa okungqiniweyo kwesidingo sokubiza umbane × intlawulo yesidingo esisebenzayo nge-RM/kW

Claiming a 90 kW bill reduction requires the recorded maximum to fall by the full 90 kW. Missing an event late in the month can replace the controlled peak and erase much of that month’s demand saving, making Energon’s two-hour coverage and protected SOC commercially important.

Keep the Published Market Case Separate

The following published Malaysian installation provides a separate market reference. Livoltek reports a 125 kW/261 kWh installation that reduced maximum demand by as much as 89.99 kW, with monthly savings near RM9,000 and annual savings above RM95,000.

Those figures describe Livoltek’s published project. The 90 kW MegSolid example is screened separately against Energon’s 125 kVA and 261.24 kWh ratings.

Net value still needs to account for charging energy, conversion losses, auxiliary consumption, maintenance and the cost of retained SOC. Full lifecycle treatment belongs in the existing cost analysis; this page keeps the decision on whether one Energon cabinet can physically remove the chargeable demand block.

Prove the Demand Reduction During FAT and SAT

MegSolid engineering infographic showing a 390 kW site peak reduced to 300 kW, 90 kW discharge, 180 kWh AC demand, 227.3 kWh nominal energy screen and FAT SAT checks

The cabinet, controller and site meter must reproduce the required result before site acceptance. Factory acceptance verifies the product configuration; site acceptance proves that the installed system controls the same point and interval used for billing.

Acceptance checkTest conditionPurchase decision protected
PCS apparent-power dutyRun at the agreed active power and site power factorConfirms that the 125 kVA boundary covers the 90 kW event
Amandla e-AC ahanjisiweyoDischarge at 90 kW across the defined SOC windowConfirms at least 180 kWh reaches the AC connection for the two-hour event
Ulawulo lwe-PCCRaise site load above 300 kW and record BESS responseConfirms the plant import target is held at the billing boundary
Interval alignmentCompare BESS logs, site meter and revenue-meter interval timestampsPrevents a control success in the wrong interval
Recharge controlRecharge after the event under the import ceilingPrevents the battery from creating the next billed peak
Thermal operationRecord battery temperature spread during the dutyVerifies operation against Energon’s published ±5°C temperature-difference control

IEC 62619 addresses safety requirements and tests for industrial secondary lithium cells and batteries. IEC 62933-5-2 covers safety requirements for grid-integrated electrochemical energy storage systems, while IEC 62477-1 addresses power electronic converter system safety.

These standards define evidence and test scope for the project; certification claims require the corresponding MegSolid certificate or report.

I- C&I BESS FAT, SAT and performance acceptance process ties those checks to witnessed records. The Isikhokelo sovavanyo lokwamkelwa kwemveliso yefektri yeBESS then connects PCS, BMS, EMS, thermal protection and communication evidence to the equipment released for shipment.

Select the Final MegSolid Configuration from the Measured Event

With a 390 kW factory peak, a 300 kW import target, 0.90 power factor and a two-hour event, the calculation yields 90 kW, 100 kVA and 227.3 kWh of screened nameplate energy. MegSolid Energon 261 is the strongest product match because one cabinet supplies 125 kVA and 261.24 kWh while preserving 34.0 kWh above the calculated nameplate requirement.

ESSA0100B-0215 becomes the better purchase when the same 90 kW event lasts about 90 minutes. ESSC0500B-1075 becomes the better architecture when the measured duty rises into several hundred kilowatts and the calculated energy approaches 1 MWh. Product class follows the measured demand event and its duration.

In this worked duty, Energon provides four specific benefits: one cabinet instead of two, approximately 76.9% less cabinet footprint than two ESSA units, about 18 minutes of calculated AC energy beyond the two-hour target, and an expansion path of up to 10 parallel units. Liquid cooling, ±5°C temperature-difference control and AI early warning support the repeated dispatch expected from daily maximum-demand management.

Imibuzo Ebuzwa Rhoqo

MegSolid Energon 261 is the best-fit single-cabinet option for the duty calculated here. Its 125 kVA and 261.24 kWh ratings cover the 100 kVA and 227.3 kWh screening results with defined margin.

Using the article’s 10% SOC reserve and 88% AC delivery factor, 261.24 kWh provides about 206.9 kWh AC. That equals approximately 2.30 hours at 90 kW.

No. kVA is apparent power, while kW is active power. Delivering 90 kW at 0.90 power factor requires 100 kVA, leaving 25 kVA below Energon’s published rating.

One ESSA provides enough rated power at 100 kW. Under the same reserve and delivery factors, its 215.04 kWh rating supplies about 170.3 kWh AC, covering roughly 1.89 hours at 90 kW.

ESSC0500B-1075 becomes relevant when the reduction reaches several hundred kilowatts and calculated energy approaches 1 MWh. The 500 kW, 1.0752 MWh, 21,000 kg container also requires suitable switchgear, transformer capacity, foundation and delivery access.

TNB states that off-peak maximum demand is not charged for non-domestic medium- and high-voltage ToU customers. The current weekday peak period is 14:00–22:00, with weekends treated as off-peak.

Twelve billing months reveal seasonal production, shutdowns and recurring chargeable peaks. Monthly kWh totals alone cannot show event duration or how often the battery must discharge.

Yes. Recharge power added to the facility load can establish a new peak. PCC control should cap charging so total grid import remains below the selected threshold.

No. The battery can recharge from the grid during a suitable low-load or off-peak window and discharge against the chargeable event. Solar can reduce charging cost when surplus generation is available.

Energon uses intelligent liquid cooling and published control of battery temperature difference within ±5°C. That thermal consistency supports the repeated cycling duty created by regular peak shaving.

Yes. MegSolid publishes parallel operation of up to 10 units. Transformer capacity, switchboard current, protection, controller architecture and available space still set the practical site limit.

The site acceptance test should discharge at 90 kW through the agreed SOC window and meter at least 180 kWh at the AC connection. Timestamps must align with the facility and revenue-meter intervals.

Multiply the verified billed-demand reduction by the applicable RM/kW charge on the site’s TNB bill. Charging energy, losses, auxiliary consumption and maintenance are then deducted from the gross demand saving.

IMegSolid (Hong Kong) Limited igxile kuphando nophuhliso, uyilo kunye nokubonelela ngeenkqubo zokugcina amandla ezikumgangatho ophezulu. Ngalo mava obuchwepheshe esinawo emva kweminyaka elishumi, sinikezela nge-ESS yekhabhathi yangaphandle eyenziwe ngokweemfuno zomthengi, ii-inverters zasekhaya kunye nezisombululo zamandla eziphathwayo kubathengi behlabathi jikelele.
WhatsApp/Wechat: +852 59811073

Fumana isisombululo sakho seMegSolid sokugcina amandla kwiiyure ezingama-24.

Ngqo kumvelisi weebhetri ze-solid-state. Fumana isiphakamiso se-ESS esenziwe ngokweemfuno zakho, uhlalutyo lwe-ROI, kunye nesindululo senkqubo kwiqela lethu lobunjineli.

Into Oza Kuyifumana

Ityelelwe ehlabathini lonke:

UL, IEC, UN38.3, China Classification Society, GB36276-2023, RoHS

Iimodeli ezishushu:

Izicelo:

Iifektri · Iifama zelanga · Ezemigodi · IiZiqithi · Iziko leDatha

Sixelele ngeprojekthi yakho — siza kukuyilela inkqubo.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.