تخزين البطاريات التجارية والصناعية: خزائن 55–261kWh وحاويات 1–5MWh
Explore C&I battery cabinets and containerized BESS for peak shaving, solar integration and backup power at commercial and industrial sites.
منتجات تخزين الطاقة
سكني، تجاري وصناعي، أنظمة تخزين الطاقة البطارية وأنظمة تحويل الطاقة
تخزين الطاقة السكنية
أنظمة تخزين الطاقة المنزلية بسعة 16–96 كيلوواط/ساعة
C&I BESS
أنظمة تخزين الطاقة القابلة للتوسع بسعة تتراوح بين 55 كيلوواط/ساعة و5 ميجاواط/ساعة
PCS والعاكسات الهجينة
أنظمة تحويل القدرة 3–500kW
Why Choose MegSolid for C&I Energy Storage
- Battery cabinets and containerized BESS for commercial and industrial sites
- Air-cooled and liquid-cooled models to suit your operating requirements
- Battery, PCS and EMS configuration support for your project
- Remote monitoring of battery status, energy flows and system alarms
- Model-specific datasheets and technical documents for purchase review
Discuss Your C&I BESS Project
Share your site location, application, required power and storage capacity so our team can review the system options with you.
تصفّح منتجات تخزين الطاقة لدينا
استعرض أنظمة البطاريات ومعدات تحويل القدرة المتاحة. افتح صفحة المنتج لمواصفات الطراز وتفاصيل التكوين والاستفسارات الفنية.
التكوين
1P260S
تصنيف IP
IP54
الطاقة المقدرة (كيلوواط ساعة)
261.24
تصنيف الحماية (IP)
آي بي ٥٥
الارتفاع (متر)
≤4000
الطاقة المقدرة (كيلوواط ساعة)
5015.9
الجهد المقنن (فولت)
400
درجة الحماية
IP54
دورة الحياة
≥ 5000
الجهد المقنن (فولت)
400
نطاق الجهد (فولت)
320~460
THDi
<3%
حماية الدخول
IP54
ارتفاع التشغيل
3,000 متر
انبعاث الضوضاء (ديسيبل)
<75
التكوين
1P260S
تصنيف IP
IP54
الطاقة المقدرة (كيلوواط ساعة)
261.24
حماية الدخول
IP54
ارتفاع التشغيل
3,000 متر
انبعاث الضوضاء (ديسيبل)
<75
تصنيف الحماية (IP)
آي بي ٥٥
الارتفاع (متر)
≤4000
الطاقة المقدرة (كيلوواط ساعة)
5015.9
الجهد المقنن (فولت)
400
درجة الحماية
IP54
دورة الحياة
≥ 5000
Peak-shaving explorer
See the power and energy above your chosen limit.
Choose an example, set a power limit, and see the peak power, energy and total time above it.
01 / Choose an example
Same 520 kW peak · compare energy & duration
02 / Set a power limit
Type a value or drag the green line or slider.
Lower limit
More load above the line
24-hour demand profile
Extended production
Higher limit
Less load above the line
Enter a whole number from 0 to 600 kW.
Loading sample chart…
Example demand
Power limit
B / Shaded energy (kWh)
03 / See what is above the limit
Above your 410 kW limit: 110 kW at peak, 442 kWh over 9.9 total hours.
A / Peak power above limit
110
كيلوواط
The largest power gap above your limit.
B / Energy above limit
442
كيلوواط/ساعة
The shaded area added up over the day.
C / Total time above limit
9.9
h
Hours added across all periods, not backup time.
Compare sustained production demand across the day.
Example curves, not site measurements. Changing the example keeps your power limit.
Times above the power limit
08:51–18:48
These results describe the example demand, not a recommended battery size or operating limit. Choosing a system requires your site data and a project review.
What else affects the final configuration?
Charging windows, usable battery energy, conversion losses, SOC reserves, solar generation, PCS limits and the site's connection requirements are reviewed together. This illustration does not simulate battery charging or dispatch.
Example points are joined by straight lines. Energy and time are calculated where the curve crosses the power limit. Displayed results are rounded.
Interval load data
Share timestamped readings, units, time zone and meter location. Include typical and peak-demand days.
Tariff & priorities
Share tariff periods, demand charges, operating hours and any backup requirement.
ظروف الموقع
Review solar generation, connection limits and the space available for installation.
Start with today. Plan for what’s next.
Plan for C&I Battery Storage Expansion
Plan your commercial and industrial battery energy storage system around today’s requirements and future growth. Explore the initial installation, site preparation and system checks involved in adding battery storage capacity.
Space for a future cabinet configuration
Initial battery cabinet configuration
01 / 03
Configure Your Initial Battery Storage System
Plan the first stage of your commercial and industrial battery storage system around your current load profile, required power and energy capacity. Define cabinet positions, electrical connection points and maintenance access to establish a clear starting point for future expansion.
Equipment
Initial cabinet configuration
Connections
Defined connection points
مخطط الموقع
Access and equipment positions
Prepare Your Site for Future Expansion
Consider future battery cabinet positions when planning the initial installation. Reserve maintenance access and cable routes, and review the electrical capacity available for additional equipment. Site space, connection limits and system compatibility help determine which battery storage expansion options are practical.
Space
Future cabinet positions
Access
Maintenance and cable routes
Infrastructure
Electrical provision
Review the Expanded Battery Storage System
When your requirements grow, assess additional battery cabinets alongside the existing installation. Review equipment compatibility, PCS capacity, BMS and EMS coordination, and electrical protection. Confirm the selected platform’s parallel-operation limits before finalizing the expanded BESS configuration.
Equipment fit
Compatible cabinet platform
System control
Coordinated operation
Electrical design
Protection and site connection
C&I BESS QUESTIONS
Choose the Right C&I Energy Storage System
1. Which commercial and industrial energy storage systems does MegSolid offer?
MegSolid supplies outdoor C&I battery cabinets, liquid-cooled cabinets and containerized BESS, with model selection based on your required AC power, usable energy, site voltage and installation space.
2. How do I size the power and capacity of a C&I BESS?
Use your site's load profile, electricity tariff and required discharge duration to size PCS power and battery capacity separately, checking kW, kVA, usable AC energy and charging time with our دليل تصميم نظام تخزين الطاقة بالبطاريات (BESS) C&I.
3. Should I choose air-cooled or liquid-cooled battery storage?
MegSolid's 215.04 kWh cabinet is air-cooled and its 261.24 kWh cabinet is liquid-cooled, so compare their temperature limits, operating duty and maintenance requirements against your site conditions before choosing.
4. What is the difference between a battery cabinet and a containerized BESS?
Battery cabinets allow layouts built around individual units, while MegSolid's أنظمة تخزين طاقة البطاريات في حاويات provide 500 kW/1.0752 MWh and 1 MW/2.1504 MWh configurations, with selection also depending on available space, transport access, foundations and electrical connections.
5. Can a C&I BESS work with solar panels and provide backup power?
Selected configurations can store solar energy and supply critical loads during outages, with backup operation requiring a suitable PCS, grid-isolation and switching equipment, protection settings and a control sequence designed for the loads being supported.
6. Can the system integrate with my existing PCS, EMS or SCADA?
Integration requires a model-specific review of battery voltage, communication protocols, firmware, control functions and protection interfaces, including how the proposed نظام التحكم في تخزين الطاقة (PCS) will exchange commands and operating limits with your existing equipment.
7. Which certifications and technical documents should I request?
Request the datasheet, applicable certificates and test reports for the exact model and configuration, together with installation requirements, warranty terms and an agreed BESS factory acceptance testing scope that reflects your project and destination market.
8. What information is needed for a C&I BESS quotation?
Send your project country, application, AC voltage, load profile, target power, required discharge duration and existing solar or generator details to request a C&I BESS quotation, including any delivery requirements or technical specifications already available.
من الاختيار إلى التسليم
Plan Your C&I BESS Project
01 / التحديد
Share Your Site Requirements
Project location, load profile, electricity tariff, AC voltage and operating objectives.
02 / CONFIGURE
Confirm the System Configuration
Battery capacity, PCS rating, cooling method, EMS functions and site interfaces.
03 / VERIFY
Agree on Testing and Documents
Model-specific documents, FAT/SAT criteria, protection checks and handover requirements.
04 / DELIVER
Confirm Delivery and Support
Equipment scope, delivery terms, commissioning responsibilities and warranty conditions.
ست مزايا لأنظمة تخزين الطاقة بالبطاريات الصلبة من MegSolid
الشهادات والمعايير العالمية






مشاريع تخزين الطاقة وخبرة التطبيقات
استعرض أمثلة المشاريع بحسب التطبيق وتكوين النظام ونطاق التوريد. استخدم متطلبات مماثلة لبدء النقاش حول موقعك.
مشروع تخزين بطاريات لمصنع محامل
Renhe Machinery Bearings. الموقع: شاوشينغ. التكوين: 900 kW / 1,940 kWh. الهدف: نقل حمل الذروة والاحتياط الطارئ.
مشروع تخزين بطاريات لمصنع كهربائي
Yongyao Electric. الموقع: شوانتشنغ. التكوين: 200 kW / 450 kWh. الهدف: خفض تكاليف الكهرباء في الذروة ودعم استقرار طاقة الإنتاج.
مشروع تخزين بطاريات للطلاء الكهربائي
Northgate Electroplating. الموقع: نينغبو. التكوين: 200 kW / 430 kWh. الهدف: خفض تكاليف الكهرباء في الذروة وتثبيت الجهد عند بدء تشغيل المعدات.
مشروع تخزين بطاريات لمصنع طلاء كهربائي
Beilun Electroplating. الموقع: نينغبو. التكوين: 500 kW / 1,140 kWh. الهدف: إدارة أحمال الإنتاج المفاجئة وخفض تكاليف الكهرباء في الذروة وتقليل التوقف الناتج عن تذبذب الشبكة.
مشروع تخزين بطاريات على جانب المصنع
Newroute Intelligence. الموقع: نينغبو. التكوين: 200 kW / 430 kWh. تخزين طاقة على جانب المصنع بوحدات خزائن متوازية.
مشروع تخزين بطاريات على جانب الشبكة
Longquan Phase I. الموقع: لونغتشيوان، ليشوي، تشجيانغ. التكوين: 100 MW / 200 MWh. الهدف: ضبط التردد وخفض الذروة ودمج الطاقة المتجددة.