Solid-State C&I Energy Storage: 55–261kWh Cabinets & 1–5MWh BESS
SolidESS manufactures C&I battery storage cabinets and containerized BESS for peak shaving, solar microgrids, and industrial backup power. Hybrid solid-state options are available in selected models, and UL9540A documentation can be confirmed for your exact model and configuration.
Hybrid Solid-State Full Lineup
16–96kWh 51.2V Home Backup
215kWh–5MWh Cabinets & Containers
3–500kW Hybrid & Modular PCS
Why Choose SolidESS C&I Energy Storage
- Battery cabinets and containerized BESS for commercial and industrial sites
- Air-cooled and liquid-cooled models to suit your operating requirements
- Battery, PCS and EMS configuration support for your project
- Remote monitoring of battery status, energy flows and system alarms
- Model-specific datasheets and technical documents for purchase review
Discuss Your C&I BESS Project
Share your site location, application, required power and storage capacity so our team can review the system options with you.
تصفّح منتجات تخزين الطاقة لدينا
استعرض أنظمة البطاريات ومعدات تحويل القدرة المتاحة. افتح صفحة المنتج لمواصفات الطراز وتفاصيل التكوين والاستفسارات الفنية.
التكوين
1P260S
تصنيف IP
IP54
الطاقة المقدرة (كيلوواط ساعة)
261.24
تصنيف الحماية (IP)
IP55
الارتفاع (متر)
≤4000
الطاقة المقدرة (كيلوواط ساعة)
5015.9
الجهد المقنن (فولت)
400
درجة الحماية
IP54
عمر البطارية بالدورات
≥ 5000
الجهد المقنن (فولت)
400
نطاق الجهد (فولت)
320~460
THDi
<3%
الحماية من دخول الأجسام الصلبة والسوائل
IP54
ارتفاع التشغيل
3,000 متر
انبعاث الضوضاء (ديسيبل)
<75
التكوين
1P260S
تصنيف IP
IP54
الطاقة المقدرة (كيلوواط ساعة)
261.24
الحماية من دخول الأجسام الصلبة والسوائل
IP54
ارتفاع التشغيل
3,000 متر
انبعاث الضوضاء (ديسيبل)
<75
تصنيف الحماية (IP)
IP55
الارتفاع (متر)
≤4000
الطاقة المقدرة (كيلوواط ساعة)
5015.9
الجهد المقنن (فولت)
400
درجة الحماية
IP54
عمر البطارية بالدورات
≥ 5000
Start with today. Plan for what’s next.
Plan for C&I Battery Storage Expansion
Plan your commercial and industrial battery energy storage system around today’s requirements and future growth. Explore the initial installation, site preparation and system checks involved in adding battery storage capacity.
Space for a future cabinet configuration
Initial battery cabinet configuration
01 / 03
Initial BESS Installation
Match your current power and energy needs
Prepare for BESS Expansion
Plan space, access and electrical infrastructure
Expanded BESS Configuration
Review additional capacity as one coordinated system
Commercial & Industrial (C&I) BESS Lineup: 215kWh Cabinets to 5MWh Containers
MegSolid delivers pre-integrated commercial and utility energy storage equipment engineered for factory peak shaving, solar microgrids, EV charging buffering, and diesel fuel reduction. Select the standardized outdoor cabinet or containerized BESS platform matching your site footprint, cooling duty, and grid voltage.
| Turnkey Model | القدرة / الطاقة المقدرة | Cooling & Architecture | Engineering & Selection Guides |
|---|---|---|---|
| ESSA0100B-0215 | 100 kW / 215.04 kWh (768V) | Smart Air-Cooled Outdoor Cabinet / Hybrid Solid-State Option | 215kWh C&I Selection Guide |
| Energon 261 | 125 kVA / 261.24 kWh (832V) | All-in-One Liquid-Cooled Cabinet (314Ah LFP) | 261kWh Liquid-Cooled Comparison |
| ESSC0500B-1075 | 500 كيلوواط / 1.0752 ميغاواط ساعة | Turnkey Air-Cooled Containerized BESS | 1MWh Grid Boundary Guide |
| ESSC1000B-2016 / 2150 | 1 MW / 2.016–2.1504 MWh | Integrated Hybrid Solid-State Container | 1MW / 2MWh System Specs |
| MegSolid 5000INTL | 2.7 MW AC / 5.0159 MWh (690V) | 20ft Liquid-Cooled Utility Container | 5MWh Utility BESS Comparison |
C&I BESS QUESTIONS
Choose the Right C&I Energy Storage System
1. Which commercial and industrial energy storage systems does MegSolid offer?
MegSolid supplies outdoor C&I battery cabinets, liquid-cooled cabinets and containerized BESS, with model selection based on your required AC power, usable energy, site voltage and installation space.
2. How do I size the power and capacity of a C&I BESS?
Use your site's load profile, electricity tariff and required discharge duration to size PCS power and battery capacity separately, checking kW, kVA, usable AC energy and charging time with our دليل تصميم نظام تخزين الطاقة بالبطاريات (BESS) C&I.
3. Should I choose air-cooled or liquid-cooled battery storage?
MegSolid ESSA0100B-0215 (100kW/215.04kWh) is air-cooled and MegSolid Energon 261 (125kVA/261.24kWh) is liquid-cooled, so compare their temperature limits, operating duty and maintenance requirements against your site conditions before choosing. If you already have a PowerStack quote, compare the Sungrow PowerStack 255CS and MegSolid Energon 261 on active power, usable capacity and site requirements.
4. What is the difference between a battery cabinet and a containerized BESS?
Battery cabinets allow layouts built around individual units, while MegSolid's أنظمة تخزين طاقة البطاريات في حاويات provide 500 kW/1.0752 MWh and 1 MW/2.1504 MWh configurations, with selection also depending on available space, transport access, foundations and electrical connections.
5. Can a C&I BESS work with solar panels and provide backup power?
Selected configurations can store solar energy and supply critical loads during outages, with backup operation requiring a suitable PCS, grid-isolation and switching equipment, protection settings and a control sequence designed for the loads being supported.
6. Can the system integrate with my existing PCS, EMS or SCADA?
Integration requires a model-specific review of battery voltage, communication protocols, firmware, control functions and protection interfaces, including how the proposed نظام التحكم في تخزين الطاقة (PCS) will exchange commands and operating limits with your existing equipment.
7. Which certifications and technical documents should I request?
Request the datasheet, applicable certificates and test reports for the exact model and configuration, together with installation requirements, warranty terms and an agreed BESS factory acceptance testing scope that reflects your project and destination market.
8. What information is needed for a C&I BESS quotation?
Send your project country, application, AC voltage, load profile, target power, required discharge duration and existing solar or generator details to request a C&I BESS quotation, including any delivery requirements or technical specifications already available.
من الاختيار إلى التسليم
Plan Your C&I BESS Project
01 / التحديد
Share Your Site Requirements
Project location, load profile, electricity tariff, AC voltage and operating objectives.
02 / الاختيار
Confirm the System Configuration
Battery capacity, PCS rating, cooling method, EMS functions and site interfaces.
03 / المراجعة
Agree on Testing and Documents
Model-specific documents, FAT/SAT criteria, protection checks and handover requirements.
04 / التأكيد
Confirm Delivery and Support
Equipment scope, delivery terms, commissioning responsibilities and warranty conditions.
ست مزايا لأنظمة تخزين الطاقة بالبطاريات الصلبة من MegSolid
تقارير اختبار البطاريات ووثائق السلامة
راجع تقارير اختبار البطاريات وتقييمات النقل ووثائق السلامة. يمكن لفريقنا تأكيد الملفات المنطبقة على طرازك المختار وسوق الوجهة.
تقييم تقني 2024: «رائد دوليًا»
حاز اعترافًا في تقييم تقني عام 2024 نظّمته رابطة صناعة البطاريات الصينية.
① أربعة ابتكارات تقنية أساسية:تصلّب الإلكتروليت في الموقع وأغشية موصلة للأيونات وطلاءات كاثود فائقة الرقة وإعادة الليثة المسبقة بطبقة إلكتروليت صلبة واقية.
② أداء بطارية رائد:كثافة طاقة عالية ونتائج متقدمة في اختبارات الاختراق بالمسمار والتسخين ودورات الشحن.
③ براءات اختراع وأبحاث وتحقق:84 براءة اختراع ممنوحة · 86 منشورًا في SCI/EI · 9 معايير 13 تقرير اختبار من جهات خارجية · 2 من تقارير البحث عن الحداثة · 9 مراجع تطبيقية






مشاريع تخزين الطاقة وخبرة التطبيقات
استعرض أمثلة المشاريع بحسب التطبيق وتكوين النظام ونطاق التوريد. استخدم متطلبات مماثلة لبدء النقاش حول موقعك.
مشروع تخزين بطاريات لمصنع محامل
Renhe Machinery Bearings. الموقع: شاوشينغ. التكوين: 900 kW / 1,940 kWh. الهدف: نقل حمل الذروة والاحتياط الطارئ.
مشروع تخزين بطاريات لمصنع كهربائي
Yongyao Electric. الموقع: شوانتشنغ. التكوين: 200 kW / 450 kWh. الهدف: خفض تكاليف الكهرباء في الذروة ودعم استقرار طاقة الإنتاج.
مشروع تخزين بطاريات للطلاء الكهربائي
Northgate Electroplating. الموقع: نينغبو. التكوين: 200 kW / 430 kWh. الهدف: خفض تكاليف الكهرباء في الذروة وتثبيت الجهد عند بدء تشغيل المعدات.
مشروع تخزين بطاريات لمصنع طلاء كهربائي
Beilun Electroplating. الموقع: نينغبو. التكوين: 500 kW / 1,140 kWh. الهدف: إدارة أحمال الإنتاج المفاجئة وخفض تكاليف الكهرباء في الذروة وتقليل التوقف الناتج عن تذبذب الشبكة.
مشروع تخزين بطاريات على جانب المصنع
Newroute Intelligence. الموقع: نينغبو. التكوين: 200 kW / 430 kWh. تخزين طاقة على جانب المصنع بوحدات خزائن متوازية.
مشروع تخزين بطاريات على جانب الشبكة
Longquan Phase I. الموقع: لونغتشيوان، ليشوي، تشجيانغ. التكوين: 100 MW / 200 MWh. الهدف: ضبط التردد وخفض الذروة ودمج الطاقة المتجددة.
Rotterdam, Netherlands. Illustrative configuration: Two MegSolid Energon 5000INTL units (10.03 MWh total rated energy). Objective: Cover shortfalls when multiple vessels draw shore power at the same time and recharge when terminal demand drops.