Solid-State C&I Energy Storage: 55–261kWh Cabinets & 1–5MWh BESS
SolidESS manufactures C&I battery storage cabinets and containerized BESS for peak shaving, solar microgrids, and industrial backup power. Hybrid solid-state options are available in selected models, and UL9540A documentation can be confirmed for your exact model and configuration.
Hybrid Solid-State Full Lineup
16–96kWh 51.2V Home Backup
215kWh–5MWh Cabinets & Containers
3–500kW Hybrid & Modular PCS
Why Choose SolidESS C&I Energy Storage
- Battery cabinets and containerized BESS for commercial and industrial sites
- Air-cooled and liquid-cooled models to suit your operating requirements
- Battery, PCS and EMS configuration support for your project
- Remote monitoring of battery status, energy flows and system alarms
- Model-specific datasheets and technical documents for purchase review
Discuss Your C&I BESS Project
Share your site location, application, required power and storage capacity so our team can review the system options with you.
Parcourir nos produits de stockage d'énergie
Parcourez les systèmes de batteries et équipements de conversion disponibles. Ouvrez une fiche produit pour les spécifications du modèle, les détails de configuration et les demandes techniques.
Configuration
1P260S
Indice IP
IP54
Énergie nominale (kWh)
261.24
Classement IP
IP55
Altitude (m)
≤ 4 000
Énergie nominale (kWh)
5015.9
Tension nominale (V)
400
Indice de protection
IP54
Durée de vie
≥ 5 000
Tension nominale (V)
400
Plage de tension (V)
320~460
THDi
<3%
Indice de protection contre la pénétration
IP54
Altitude d'exploitation
3 000 m
Émission sonore (dB)
<75
Configuration
1P260S
Indice IP
IP54
Énergie nominale (kWh)
261.24
Indice de protection contre la pénétration
IP54
Altitude d'exploitation
3 000 m
Émission sonore (dB)
<75
Classement IP
IP55
Altitude (m)
≤ 4 000
Énergie nominale (kWh)
5015.9
Tension nominale (V)
400
Indice de protection
IP54
Durée de vie
≥ 5 000
Start with today. Plan for what’s next.
Plan for C&I Battery Storage Expansion
Plan your commercial and industrial battery energy storage system around today’s requirements and future growth. Explore the initial installation, site preparation and system checks involved in adding battery storage capacity.
Space for a future cabinet configuration
Initial battery cabinet configuration
01 / 03
Initial BESS Installation
Match your current power and energy needs
Prepare for BESS Expansion
Plan space, access and electrical infrastructure
Expanded BESS Configuration
Review additional capacity as one coordinated system
Commercial & Industrial (C&I) BESS Lineup: 215kWh Cabinets to 5MWh Containers
MegSolid delivers pre-integrated commercial and utility energy storage equipment engineered for factory peak shaving, solar microgrids, EV charging buffering, and diesel fuel reduction. Select the standardized outdoor cabinet or containerized BESS platform matching your site footprint, cooling duty, and grid voltage.
| Turnkey Model | Puissance / Énergie nominale | Cooling & Architecture | Engineering & Selection Guides |
|---|---|---|---|
| ESSA0100B-0215 | 100 kW / 215.04 kWh (768V) | Smart Air-Cooled Outdoor Cabinet / Hybrid Solid-State Option | 215kWh C&I Selection Guide |
| Energon 261 | 125 kVA / 261.24 kWh (832V) | All-in-One Liquid-Cooled Cabinet (314Ah LFP) | 261kWh Liquid-Cooled Comparison |
| ESSC0500B-1075 | 500 kW / 1,0752 MWh | Turnkey Air-Cooled Containerized BESS | 1MWh Grid Boundary Guide |
| ESSC1000B-2016 / 2150 | 1 MW / 2.016–2.1504 MWh | Integrated Hybrid Solid-State Container | 1MW / 2MWh System Specs |
| MegSolid 5000INTL | 2.7 MW AC / 5.0159 MWh (690V) | 20ft Liquid-Cooled Utility Container | 5MWh Utility BESS Comparison |
C&I BESS QUESTIONS
Choose the Right C&I Energy Storage System
1. Which commercial and industrial energy storage systems does MegSolid offer?
MegSolid supplies outdoor C&I battery cabinets, liquid-cooled cabinets and containerized BESS, with model selection based on your required AC power, usable energy, site voltage and installation space.
2. How do I size the power and capacity of a C&I BESS?
Use your site's load profile, electricity tariff and required discharge duration to size PCS power and battery capacity separately, checking kW, kVA, usable AC energy and charging time with our Guide de conception du système BESS C&I.
3. Should I choose air-cooled or liquid-cooled battery storage?
MegSolid ESSA0100B-0215 (100kW/215.04kWh) is air-cooled and MegSolid Energon 261 (125kVA/261.24kWh) is liquid-cooled, so compare their temperature limits, operating duty and maintenance requirements against your site conditions before choosing. If you already have a PowerStack quote, compare the Sungrow PowerStack 255CS and MegSolid Energon 261 on active power, usable capacity and site requirements.
4. What is the difference between a battery cabinet and a containerized BESS?
Battery cabinets allow layouts built around individual units, while MegSolid's containerized battery energy storage systems provide 500 kW/1.0752 MWh and 1 MW/2.1504 MWh configurations, with selection also depending on available space, transport access, foundations and electrical connections.
5. Can a C&I BESS work with solar panels and provide backup power?
Selected configurations can store solar energy and supply critical loads during outages, with backup operation requiring a suitable PCS, grid-isolation and switching equipment, protection settings and a control sequence designed for the loads being supported.
6. Can the system integrate with my existing PCS, EMS or SCADA?
Integration requires a model-specific review of battery voltage, communication protocols, firmware, control functions and protection interfaces, including how the proposed système de stockage d'énergie PCS will exchange commands and operating limits with your existing equipment.
7. Which certifications and technical documents should I request?
Request the datasheet, applicable certificates and test reports for the exact model and configuration, together with installation requirements, warranty terms and an agreed BESS factory acceptance testing scope that reflects your project and destination market.
8. What information is needed for a C&I BESS quotation?
Send your project country, application, AC voltage, load profile, target power, required discharge duration and existing solar or generator details to request a C&I BESS quotation, including any delivery requirements or technical specifications already available.
DE LA SÉLECTION À LA LIVRAISON
Plan Your C&I BESS Project
01 / DÉFINIR
Share Your Site Requirements
Project location, load profile, electricity tariff, AC voltage and operating objectives.
02 / CHOISIR
Confirm the System Configuration
Battery capacity, PCS rating, cooling method, EMS functions and site interfaces.
03 / VÉRIFIER
Agree on Testing and Documents
Model-specific documents, FAT/SAT criteria, protection checks and handover requirements.
04 / CONFIRMER
Confirm Delivery and Support
Equipment scope, delivery terms, commissioning responsibilities and warranty conditions.
Les six avantages des systèmes de stockage d'énergie à batterie à l'état solide MegSolid
Rapports d'essai des batteries et documentation de sécurité
Consultez les rapports d'essai, évaluations de transport et documents de sécurité. Notre équipe confirme les fichiers applicables à votre modèle et à votre marché de destination.
Évaluation technologique 2024 : « Leader international »
Reconnu lors d'une évaluation technologique 2024 organisée par la China Battery Industry Association.
① Quatre innovations technologiques clés :solidification in situ de l'électrolyte, membranes conductrices d'ions, revêtements de cathode ultrafins et prélithiation avec couche protectrice d'électrolyte solide.
② Performances de batterie de premier plan :densité d'énergie élevée et résultats remarquables aux essais de pénétration, de chauffe et de cyclage.
③ Brevets, recherche et validation :84 brevets d'invention délivrés · 86 publications SCI/EI · 9 normes 13 rapports d'essai tiers · 2 rapports de recherche de nouveauté · 9 références d'application
Rapport d'essai UN 38.3
Résultats des essais de sécurité au transport de la batterie du modèle couvert par le rapport.
Rapport de classification de transport
Classification de transport et conditions d'expédition du modèle de batterie concerné.






Projets de stockage d'énergie et retours d'expérience
Parcourez des exemples de projets par application, configuration et périmètre de fourniture. Partez d'exigences comparables pour lancer la discussion sur votre site.
Projet de stockage par batteries pour une usine de roulements
Renhe Machinery Bearings. Lieu : Shaoxing. Configuration : 900 kW / 1 940 kWh. Objectif : décalage des pointes de charge et secours d'urgence.
Projet de stockage par batteries pour une usine électrique
Yongyao Electric. Lieu : Xuancheng. Configuration : 200 kW / 450 kWh. Objectif : réduire les coûts de pointe et soutenir une alimentation de production stable.
Projet de stockage par batteries pour galvanoplastie
Northgate Electroplating. Lieu : Ningbo. Configuration : 200 kW / 430 kWh. Objectif : réduire les coûts de pointe et stabiliser la tension au démarrage des équipements.
Projet de stockage par batteries pour une usine de galvanoplastie
Beilun Electroplating. Lieu : Ningbo. Configuration : 500 kW / 1 140 kWh. Objectif : gérer les charges de production soudaines, réduire les coûts de pointe et limiter les arrêts dus aux fluctuations du réseau.
Projet de stockage par batteries côté usine
Newroute Intelligence. Lieu : Ningbo. Configuration : 200 kW / 430 kWh. Stockage côté usine avec armoires en parallèle.
Projet de stockage par batteries côté réseau
Longquan Phase I. Lieu : Longquan, Lishui, Zhejiang. Configuration : 100 MW / 200 MWh. Objectif : régulation de fréquence, écrêtage et intégration des énergies renouvelables.
Rotterdam, Netherlands. Illustrative configuration: Two MegSolid Energon 5000INTL units (10.03 MWh total rated energy). Objective: Cover shortfalls when multiple vessels draw shore power at the same time and recharge when terminal demand drops.