نظام تخزين الطاقة بالبطاريات (BESS) لمتاجر السوبر ماركت في الفلبين وإندونيسيا: تحقق من خفض استهلاك الديزل قبل الشراء

If you run a supermarket, cold room or island back-of-house on a weak grid, “we’ll cut diesel” is easy to say and hard to prove.

Acceptance requires source-state and meter records from matched operating buckets covering store hours, refrigeration duty, grid availability and PV conditions.

MegSolid ESSA0100B-0215 is a published 100 kW AC / 215.04 kWh nominal outdoor C&I cabinet. The hardware sits inside a larger project boundary covering source priority, SOC thresholds, generator commands, meter locations and an acceptance report your team can audit six months later.

This page gives owners, EPCs and local installers in the Philippines and Indonesia a contractable diesel-reduction test and an auditable result.

تقرير هندسي من شركة MegSolid خاص بسلسلة متاجر BESS في الفلبين وإندونيسيا، يتضمن معلومات عن أنظمة الطاقة الكهروضوئية (PV) والشبكة الكهربائية والمولدات ونظام التبديل التلقائي (ATS) وأحمال التبريد ومراقبة نظام إدارة الطاقة (EMS)، بالإضافة إلى بطاقة المعلمات الاسمية لنظام ESSA0100B-0215 بقدرة 100 كيلوواط تيار متردد و215.04 كيلوواط/ساعة.

What buyers actually search

You type…You really mean…Keep this on file
Generator run-hoursDid the genset run for fewer hours?Start/stop log + hour-meter photo or export
Fuel consumptionDid we buy fewer litres?Flow meter, or tank dips + delivery notes
Generator kWhHow much electrical energy came from diesel?Meter on the genset output
Source priorityDid grid/PV/BESS/diesel run in the right order?EMS source-state log
SOC thresholdDid we keep the reserve we promised?SOC at every start and stop
ATS / dry contactDid the command actually transfer?Command + controller ack + breaker status
Critical loadsFridge, lights, POS still up?Load status + alarm list
PCC importDid higher grid import cause lower diesel use?PCC kWh + breaker state
Comparable windowAre baseline and post-test conditions comparable?Same trading hours, load, grid, PV bucket

The short rule: five numbers in one report

A nameplate helps you size the cabinet. Operating data demonstrates the fuel result.

Ask for these five together:

Collect a 30-day baseline before the new dispatch logic goes live, followed by a matched post-test after SAT. Compare the periods through approved buckets for store hours, cold-room duty, grid availability and PV conditions.

Review the hour-meter change with fuel, electrical-energy and critical-load records so the source supplying the freezers remains visible.

Architecture references:

Regional cases: use their measurement fields

Published case summaries often feature a “60% less diesel” headline. Treat each figure as a site-specific result and extract the data fields relevant to your own acceptance plan.

CaseWhat they reportedHow you should use it
KFC Mandaue (POWEROAD)200 kW / 466 kWh + PV, grid, diesel, ATS, EMS on a coastal retail siteUse the multi-source control configuration as a reference and establish savings from the site baseline
Enjoypowers factory near Manila80 kW PV, 100 kW / 100 kWh BESS, 50 kVA genset; dry season ~0 diesel hours, rainy season 2–3 h/daySeason and PV must sit next to any “hours saved” claim
Island hybrid (Power Philippines)~60% diesel displacement on named island projectsUse the operating concept as a reference while retaining its project-specific boundary
Indonesia cold-chain study~60% lower diesel in that specific PV–diesel–battery–grid setupApply its measured-load and operating-cost framework, then establish the MegSolid target from site data
Tablas Island (DHYBRID)Utility-scale 2.2 MW / 2.8 MWh; millions of litres/year statedUse it for utility-island scale context and build the supermarket benchmark from site records

The purchase order should link every savings percentage to the site meters and signed comparison window.

Build a 30-day diesel baseline

Thirty trading days is enough for most stores with regular hours. When grid availability or monsoon conditions vary sharply, split the baseline into comparable groups or extend the measurement period.

Capture this before anyone changes EMS priorities.

سجلMinimumWho owns it
GeneratorStart/stop times + hour-meter before/afterOwner or genset contractor
FuelFlow meter preferred; else tank level + deliveries + closing stockOwner
Generator outputSynced kW, kWh, kVA, power factor, run stateEPC / metering
PCCImport/export kWh, “grid up?”, breaker stateOwner / EPC
Site load15-minute kW + critical-load up/downOwner / EPC
RefrigerationCompressor on/off, defrost, room temp, alarmsFacilities
PVAC kWh, downtime, curtailment; irradiance if you have itPV contractor

Put totals (litres, hours, genset kWh) on page one. Keep the interval files, meter serials, accuracy class and time zone in the appendix. Note every gap.

Report all three operating metrics

MetricSimple formulaCatches…
Run-hour cut(before h − after h) ÷ before hShorter runtime
Fuel cut(before L − after L) ÷ before LReal litre change
Litres per kWhgenerator L ÷ generator kWhIdling and soft loading

When an acceptance report states “28% less fuel,” require the litres, genset kWh, grid kWh, PV kWh and matched store hours on the same page.

Diesel-savings evidence-chain diagram showing the 30-day baseline, comparable operating buckets, post-SAT test, signed acceptance results and four false-savings checks.

Write the EMS order before anyone commissions

The control narrative must assign generator-start authority, SOC triggers and the fallback state for lost EMS communication.

Grid stateWhat should happenWhat you file
Grid normalPV / utility / BESS in the approved order; hold reservePCC, PV, BESS power/SOC, source log
Grid weakBESS only inside voltage and reserve limitsPCC voltage, EMS command, genset ready, alarms
Grid goneCritical bus on PV/BESS; diesel only at the signed triggerATS/breaker, start command, real start time, SOC, fridge/POS status
SOC lowProtect reserve; diesel under agreed load and recharge rulesSOC trigger, genset kW, min-run timer, stop rule
Comms lostFallback mode you already signedLoss time, fallback command, protection state, recovery

Write these in plain language in the control narrative:

Then mirror them in the I/O list, protection study, genset controller settings and SAT script.

A dry-contact pulse records the command. Generator-start acceptance adds controller acknowledgement, bus voltage, breaker auxiliary contacts and a timestamp.

Independent protection remains responsible for reverse power, breaker coordination, governor limits and emergency stop.

Related reading

EMS, generator and ATS site-acceptance diagram matching the approved start-stop sequence to one event record with command, acknowledgement, voltage, breaker and critical-load evidence.

Four checks for misleading savings

What happenedLooks likeCheck this
Genset idling or crawlingHours down a bit, fuel still burnsHours + litres + kW + L/kWh
Grid carried more loadDiesel down, bill from utility upPCC kWh + breaker history
Store quieter / cold rooms emptyFuel down because load downTrading hours + defrost + site kWh
Sunnier week“BESS saved diesel” but PV did the workPV kWh + weather note

Record each condition as a separate monthly-report line item and link it to the relevant interval data.

ESSA0100B-0215: published product boundary

MegSolid ESSA0100B-0215 is a sensible starting cabinet when the store’s simultaneous load sits near 100 كيلوواط.

Sheet itemValueYour check
القدرة الكهربائية المقننة التي تعمل بالتيار المتردد100 كيلوواطFridge starts, POS + lights + HVAC together
الطاقة المقدرة215.04 kWh nominalUsable kWh after reserve, losses, auxiliaries, ageing
البطارية280 Ah LFP; 1P240S; 768 V nominalMatches the BOM you are buying
Working voltage672–850 VFits PCS / DC window
AC400 V; 3W + N + PEMatches your switchboard and earthing
Cooling / IPIntelligent air cooling; IP54Heat, humidity, salt, dust, service access
IntegrationEMS; load / battery / grid / diesel / PV ports; isolation transformerSLD, I/O, who owns which controller

Translate the product sheet into project values:

The public page describes connections to grid, PV and diesel. The quotation should define log fields, sample rate, time source, retention period and export method.

Compare cabinet-only and acceptance-ready scopes

TopicCabinet-only scopeAcceptance-ready MegSolid scope
Power / time“100 kW / 215 kWh”Load interval check + signed usable AC energy
Diesel“Supports generator”I/O list, sequence, who signs what
ATS“We sent a start pulse”Pulse + ack + breaker + voltage + time
Fuel“Up to XX% less diesel”Baseline + matched post-test + raw litres/kWh
نظام الإدارة البيئيةScreenshot of a dashboardContracted fields, retention, export, clock sync
HandoverOne demo transferFAT + SAT + operating fuel report

This scope gives the owner traceable controls and operating evidence alongside the delivered cabinet.

Sizing help

FAT, SAT, then the real fuel test

المرحلةMust seeWho is in the room
FATEMS command, dry-contact state, simulated controller replyIntegrator + EPC
SAT gensetSOC, command, ack, real start/stop, kW, timerIntegrator + EPC + genset tech
SAT transferSource voltage, transfer command, aux contacts, critical loadsEPC + switchgear
SAT low SOCBoundary, BESS limit, genset request, load resultIntegrator + EPC
SAT comms lossInject fault, alarm, fallback, recoveryIntegrator + EPC
Post-testFuel, genset kWh, PCC, PV, BESS AC energy, site loadOwner + EPC + witness

Set meter class, sample interval, time zone and export format as a payment milestone. A phone photo can support the record; primary acceptance uses the agreed meter export.

Clause skeleton you can hand to counsel

ClausePut this in
Baseline30 consecutive operating days before new dispatch
Post-testSame fields, comparable weeks after SAT
RecordsGenset events/hours/fuel/kWh; PCC; BESS energy/SOC; PV; store state
ControlSource order, SOC limits, min-run, ATS sequence, comms fallback
DataMeter map, accuracy, timestamps, retention, export, gaps
النتيجةFuel percentage reported with raw numbers and a normalised view

Local code, utility rules, insurance and genset warranty still decide the final legal wording.

What to send MegSolid

Before you lock the brand:

Using that project pack, MegSolid can assess whether ESSA0100B-0215 is in the right class or whether the site needs a larger C&I layout.

Email [email protected] with the SLD, genset data, 30-day file and critical-load list.

Acceptance decision

A weak-grid supermarket demonstrates diesel savings by showing the source sequence and energy balance for matched operating periods.

Acceptance evidence: 30-day baseline, matched post-test, fuel and electrical meters, EMS events, SOC, ATS feedback and critical-load status.

ESSA0100B-0215 provides a published 100 kW AC / 215.04 kWh nominal outdoor platform. Project acceptance follows when the records show the generator schedule, fuel and electrical output, active source and availability of the cold rooms and POS.

الأسئلة الشائعة

استخدم سجلات خط الأساس والاختبار اللاحق المتطابقة التي توضح لترات الوقود، وساعات تشغيل المولد، وكيلوواط ساعة للمولد، وكيلوواط ساعة لشبكة الكهرباء العامة، وكيلوواط ساعة للطاقة الشمسية، وحالة تشغيل المتجر. تعتمد نتيجة الوقود ذات المصداقية على أساس زمن واحد ومنافذة مقارنة معتمدة لجميع الحقول.

The generator may run fewer hours because the grid imported more energy, the store load fell or PV conditions improved. Run-hours must be reviewed with litres, generator kWh, PCC kWh, PV kWh and site load.

Thirty operating days is a practical starting point for regular store hours. Extend or split the period when monsoon conditions, grid availability, closures or refrigeration duty make the sample unrepresentative.

Create comparable buckets using store hours, refrigeration duty, grid status and PV or weather class. Report each seasonal group with its own raw values and normalized result.

A calibrated fuel-flow meter provides the strongest interval record. Where one is unavailable, reconcile tank levels, delivery notes and beginning and ending inventory, then document every adjustment and data gap.

Use the agreed meter at the generator output boundary. Record kW, kWh, kVA, power factor and run state so the report can distinguish loaded operation from warm-up, idle and low-load running.

Retain source states, commands, SOC, BESS power, generator request, controller acknowledgement, ATS or breaker state, alarms and timestamps. The quotation should also define sampling interval, clock source, retention and export format.

The project engineer, EPC, generator contractor and BESS integrator should approve the thresholds against the critical-load reserve, generator limits and recovery strategy. The final values belong in the control narrative, I/O list and SAT script.

The dry-contact state records command issuance. Generator-start acceptance also requires controller acknowledgement, generator voltage, running state, breaker auxiliary contacts and the critical-load result.

Record the transfer command, source voltage, ATS or breaker auxiliary contacts, selected-source state, timestamps and critical-load continuity. All records should reference the same SAT event ID.

Calculate litres per generator kWh and review it beside kW, kVA and run-hours. A low electrical contribution with continued fuel consumption exposes idle, warm-up or inefficient loading.

It represents nominal battery energy. The approved SOC window, conversion losses, auxiliary demand, temperature limits, degradation allowance and test boundary determine usable AC energy.

ت يتطلب اختبار دورة التكييف لمدة ساعتين التحقق من الطاقة القابلة للاستخدام، واحتياطي حالة الشحن (SOC)، وخسائر التحويل، والأحمال المساعدة، والظروف المحيطة، وأداء نهاية العمر التشغيلي. وتوفر القدرة الاسمية المعلنة البالغة 100 كيلوواط تيار متردد و215.04 كيلوواط ساعة المدخلات الأولية لهذا الحساب.

The published platform includes integrated EMS functions and access to load, battery, grid, diesel generator and PV. The delivered I/O, controller compatibility, ATS logic, communication method and data fields still require confirmation in the signed project documents.

FAT checks available controls and simulated responses before shipment. SAT verifies the installed generator, ATS, switchboard, protection and loads. The post-test then measures fuel and energy performance over the agreed operating period.

أرسل الرسم التخطيطي أحادي الخط، وبيانات الحمل ونقطة الاتصال المشتركة (PCC) لمدة 30 يوماً، وتفاصيل طراز المولد ووحدة التحكم فيه، وسجلات الوقود، وترتيب نظام النقل التلقائي (ATS)، وقائمة الأحمال الحرجة، وجدول التبريد، وبيانات الطاقة الشمسية الكهروضوئية، وظروف الموقع، وفترة القبول المقترحة.

ميغ صوليد (هونغ كونغ المحدودة تركز على البحث والتطوير والتصميم وتوريد أنظمة تخزين الطاقة عالية الأداء. مع عشر سنوات من تراكم الخبرة التقنية، نقدم حلول تخزين الطاقة الخارجية المخصصة، والمحولات السكنية، وحلول الطاقة المحمولة للعملاء العالميين.
واتساب/ويتشات: +852 59811073

احصل على حل تخزين الطاقة MegSolid الخاص بك خلال 24 ساعة

مباشرةً من شركة مصنعة لبطاريات الحالة الصلبة. احصل على عرض مخصص لنظام تخزين الطاقة (ESS)، وتحليل العائد على الاستثمار، وتوصيات بشأن النظام من فريقنا الهندسي.

ما ستحصل عليه

موثوق بها في جميع أنحاء العالم:

UL، IEC، UN38.3، جمعية تصنيف السفن الصينية (CCS)، GB36276-2023، RoHS

عارضات أزياء مثيرات:

التطبيقات:

مصانع · مزارع شمسية · تعدين · جزر · مراكز بيانات

أخبرنا عن مشروعك لنقوم بتصميم النظام لك.