Energy Storage Inverters & 30–500kW Bidirectional PCS
MegSolid manufactures 98.7% max-efficiency solid-stat inverters, G2S single/three-phase hybrid storage inverters, and 30kW–500kW bidirectional PCS for residential, C&I, and utility microgrid battery energy storage systems. Request OEM pricing or download technical datasheets below.
Energy Storage Products
Residential, C&I, BESS & PCS
Residential Energy Storage
16–96kWh Home Energy Storage
C&I BESS
55kWh–5MWh Scalable Energy Storage Systems
PCS & Hybrid Inverters
3–500kW Power Conversion Systems
Browse Our Energy Storage Products
Review available battery systems and power conversion equipment. Open a product page for model specifications, configuration details and technical enquiries.
Ingress protection
IP65
Weight (kg)
73kg
Meter
RS485
Rated voltage (V)
400
Max.efficiency
98.7%
Voltage accuracy
±1%
Rated voltage(V)
400
Voltage range(V)
320~460
THDi
<3%
Ingress protection
IP65
Display
LCD
THDi
<3%
Capacity
1kWh
Cycles
8000
Warranty
5Y
Ingress protection
IP65
Weight (kg)
73kg
Meter
RS485
Ingress protection
IP65
Display
LCD
THDi
<3%
Rated voltage (V)
400
Max.efficiency
98.7%
Voltage accuracy
±1%
Rated voltage(V)
400
Voltage range(V)
320~460
THDi
<3%
SYSTEM INTEGRATION
See what goes around your inverter or PCS.
See what the selected equipment handles, what the system needs alongside it, and which connections to confirm.
Battery AC / DC conversion
PV conversion
Built-in isolation transformer
Select equipment, then open the details below to see its role.
Selected equipment — responsibilities & connection checks
REFERENCE SYSTEM
Battery conversion example
PV and battery inputs in one hybrid inverter
AC-coupled solar + battery example
INSIDE THE SELECTED EQUIPMENT
R-series
hybrid inverter
Converts PV energy and charges or discharges a compatible battery.
PMA modular
battery PCS
Handles bidirectional conversion between battery DC and the site AC system.
MEGA TS
isolated PCS
Handles battery conversion with an isolation transformer built into the PCS.
Stores energy and supervises battery limits.
Outside the inverter / PCS
Connects to the hybrid inverter's supported PV inputs.
PV conversion is inside the hybrid inverter
The separate PV inverter connects solar to the site AC system.
PV conversion is provided here in this AC-coupled example
Connects the equipment to the site AC system.
Site-specific electrical design
Measures site conditions and coordinates operating commands.
Configuration depends on the control design
Define backed-up loads, transfer, earthing and protection.
An off-grid function alone is not a complete backup system
EQUIPMENT RESPONSIBILITIES
Bidirectional battery-to-AC conversion. Solar is not included in this example.
Stores DC energy. The BMS supervises battery operating limits and communicates permitted charging and discharging conditions.
Provides the project connection arrangement, switching and protective devices for the site electrical system.
Provides site measurements and operating commands according to the selected control arrangement.
Defines the backed-up circuits and the transfer, grid isolation, earthing and protection arrangement needed for outage operation.
PV conversion and bidirectional battery-to-AC conversion.
The PV array produces DC. The R-series hybrid inverter performs PV conversion through its supported PV inputs.
Bidirectional battery DC-to-AC and AC-to-DC conversion.
A dedicated PV inverter converts solar DC to AC. The battery PCS handles battery conversion separately.
Bidirectional battery conversion and the built-in isolation transformer.
Battery and BMS, site distribution, metering and any backup circuit arrangement.
The selected inverter or PCS performs AC/DC power conversion. The battery BMS is part of the battery system.
Device-level protections in the inverter or PCS do not define the whole site protection scheme.
BMS manages battery limits. Inverter or PCS controls execute permitted power commands. External EMS and metering scope depends on the project.
An off-grid inverter function or an isolation transformer alone does not establish a complete automatic backup system.
Mounting, strings, DC cabling, isolation and protection are designed for the PV installation.
Battery and BMS, site distribution and controls. Any backup arrangement is designed for the project.
Battery and BMS; system enclosure, cooling and site equipment. A separate PV inverter provides solar conversion in this AC-coupled example.
In this AC-coupled example, the PV inverter and battery PCS connect to the site AC system.
Battery and BMS, site distribution and controls. A separate PV inverter provides solar conversion in this AC-coupled example.
Battery operating voltage and current, BMS compatibility, PV strings and site AC connections.
Battery voltage across the operating range, usable current, BMS protocol, software configuration and the exact supported battery model.
AC wiring and neutral arrangement, earthing, cable sizing, protective-device coordination and grid connection requirements.
Meter position, control authority, export limits, supported communication protocols and how loss of communication is handled.
Essential-load kW and kVA, starting loads, transfer requirements, neutral/earthing arrangements, black start and coordinated PV operation.
String open-circuit voltage, MPPT operating range, input current and the number of supported strings.
Battery full-load voltage window, DC current, AC wiring, BMS protocol and system integration.
AC voltage and grid connection, export-control coordination and whether the PV inverter can operate in the intended grid or backup mode.
Model-specific battery voltage, site AC connections, transformer requirements and operating mode.
The inverter handles conversion. The battery, site protection and backup arrangement still need their own system design.
PMA is a power module. The enclosure, cooling, protection and system integration need to be specified.
The built-in transformer provides isolation. It does not replace grid protection, earthing or the project backup arrangement.
Reference equipment arrangements. This board explains responsibilities; it is not a wiring diagram or an automatic compatibility check. Backup operation requires a verified system arrangement.
INVERTER & PCS QUESTIONS
Choose the Right Inverter or PCS
1. What is the difference between a hybrid inverter and a bidirectional PCS?
Hybrid inverters typically combine solar PV inputs and battery control in one unit, while a bidirectional energy storage PCS controls power flow between the battery and AC system, with solar conversion equipment specified separately where required.
2. Which inverter and PCS power ratings does MegSolid offer?
Published rated AC outputs are 3–6 kW for REVO G2S-C, 30–50 kW for R30KH3–R50KH3, 80/105/125 kW for PMA modular PCS and 30–500 kW for MEGA PCS, with selection based on your load, battery voltage and required operating mode.
3. Should I choose a single-phase or three-phase hybrid inverter?
Choose a single-phase hybrid inverter or a three-phase model according to your supply voltage, load distribution and backup-circuit design, checking phase-imbalance and parallel-operation limits for the exact configuration.
4. Can these inverters and PCS work with my existing battery?
Confirm the battery's operating voltage, current limits, BMS protocol and firmware pairing using our battery–inverter compatibility guide, since matching CAN or RS485 interfaces alone does not confirm that the equipment will work together.
5. What should I check before connecting solar panels?
Check PV voltage, MPPT operating range, string current and maximum array power against the selected three-phase hybrid inverter specifications, keeping maximum PV input separate from rated AC output and confirming the solar connection design for any PCS without built-in PV inputs.
6. Can the inverter or PCS supply backup power during a grid outage?
Backup operation depends on the exact inverter or PCS model, battery and switching arrangement, so confirm critical-load power, starting demand, transfer time, grid isolation and protection requirements before specifying off-grid or emergency supply.
7. Which datasheets and certifications should I request before ordering?
Request the model-specific datasheet, applicable grid-connection certificates, battery compatibility record and warranty terms, then agree the protection and commissioning checks described in our PCS engineering guide.
8. How can I request an inverter or PCS quotation?
Share your project country, application, AC voltage and phase arrangement, required output or load list, battery specifications and any solar or backup requirements to request an inverter or PCS quotation.
9. How do I verify BMS-to-PCS communication protocol compatibility?
All MegSolid storage-ready inverters and 30–500kW bidirectional PCS units support CAN 2.0B, RS485, and Modbus TCP communication for closed-loop battery management system (BMS) integration. For detailed pinouts and charge voltage matching, review our BMS-to-PCS voltage window and protocol matching guide.
10. Should I choose a transformerless PCS system or an isolated PCS for industrial motor starting?
A transformerless PCS system delivers up to 98.7% conversion efficiency for standard C&I peak shaving, whereas heavy inductive loads (pumps, compressors, and stamping presses) require high surge overload capacity. See our motor-starting PCS sizing and demand interval guide and PCC zero-export control specification guide.
FROM SELECTION TO DELIVERY
Plan Your Inverter & PCS Configuration
01 / DEFINE
Share Your Electrical Requirements
Project location, supply voltage, phase arrangement, connected loads and operating modes.
02 / MATCH
Confirm Battery and Solar Inputs
Battery voltage, current limits, BMS protocol and PV string details where applicable.
03 / VERIFY
Review Compatibility and Approvals
Model and firmware pairing, grid requirements, protection settings and acceptance tests.
04 / ORDER
Confirm Supply and Support
Product model, required accessories, delivery schedule, commissioning scope and warranty terms.
Six Advantages of MegSolid Solid-State Battery Energy Storage Systems
Certifications & Global Standards






Energy Storage Projects and Application Experience
Review project examples by application, system configuration and supply scope. Use comparable requirements to begin the discussion for your own site.
Bearing Factory Battery Storage Project
Renhe Machinery Bearings. Location: Shaoxing. Configuration: 900 kW / 1,940 kWh. Objective: Peak-load shifting and emergency backup.
Electrical Factory Battery Storage Project
Yongyao Electric. Location: Xuancheng. Configuration: 200 kW / 450 kWh. Objective: Reduce peak electricity costs and support stable production power.
Electroplating Battery Storage Project
Northgate Electroplating. Location: Ningbo. Configuration: 200 kW / 430 kWh. Objective: Reduce peak electricity costs and stabilize voltage during equipment startup.
Electroplating Factory Battery Storage Project
Beilun Electroplating. Location: Ningbo. Configuration: 500 kW / 1,140 kWh. Objective: Manage sudden production loads, lower peak electricity costs and reduce downtime caused by grid fluctuations.
Factory-Side Battery Storage Project
Newroute Intelligence. Location: Ningbo. Configuration: 200 kW / 430 kWh. Factory-side energy storage using parallel cabinet units.
Grid-Side Battery Storage Project
Longquan Phase I. Location: Longquan, Lishui, Zhejiang. Configuration: 100 MW / 200 MWh. Objective: Frequency regulation, peak shaving and renewable-energy integration.